{"id":31264,"date":"2023-04-06T08:02:05","date_gmt":"2023-04-06T08:02:05","guid":{"rendered":"https:\/\/www.africa-press.net\/angola\/?p=31264"},"modified":"2023-04-06T08:02:05","modified_gmt":"2023-04-06T08:02:05","slug":"access-difficulties-prevent-completion-of-piim-projects-in-cacolo","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo","title":{"rendered":"Access difficulties prevent completion of PIIM projects in Cacolo"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Angola. <\/strong><\/span><b>The poor state of the road, which connects the seat of the municipality of Cacolo to the communes of Alto-Chicapa and Cucumbi, is making it difficult to meet deadlines for works in the Integrated Plan for Intervention in Municipalities (PIIM).<\/b><\/p>\n<p>This is the construction of a school with seven classrooms, in the Alto-Chicapa commune, budgeted at 91 million kwanzas, whose work is at a physical execution level of around 90 percent and financial execution of 95% .<\/p>\n<p>The T2 residence for teachers, which is being built in Cucumbi, has a physical completion of 80 percent and a financial completion of 90.<\/p>\n<p>The director of the provincial study, planning and statistics office (GEPE), Belarmino Sandungo, said that the referred works are taking place at a very slow pace, a situation that has worried the authorities, since they should already be delivered last year (2022).<\/p>\n<p>\u201cThe poor condition of the access roads where the works are located and the poorly prepared budget by those responsible for the works have caused several constraints\u201d, he said.<\/p>\n<p>He underlined that the poorly budgeted works are earthworks on the Saurimo\/Sombo and Cacolo\/Alto-Chicapa sections, which were currently included in the 2023 budget.<\/p>\n<p>He explained that the works are part of the 91 projects included in the PIIM in Lunda Sul, with a physical execution of 95 percent and financial execution of 98. Of these projects, 85 have already been completed, with only six remaining to be concluded and that they are at a slow pace.<\/p>\n<p>In Lunda Sul province, the PIIM has already consumed 16 billion and 572 million kwanzas, of the 16 billion and 824 million kwanzas made available for the projects<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/angola\">Angola<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Angola. The poor state of the road, which connects the seat of the municipality of Cacolo to the communes of Alto-Chicapa and Cucumbi, is making it difficult to meet deadlines for works in the Integrated Plan for Intervention in Municipalities (PIIM). This is the construction of a school with seven classrooms, in the [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":31263,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,337,329],"class_list":["post-31264","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-angola","tag-angola"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Access difficulties prevent completion of PIIM projects in Cacolo - Angola<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Access difficulties prevent completion of PIIM projects in Cacolo\" \/>\n<meta property=\"og:description\" content=\"Africa-Press &#8211; Angola. The poor state of the road, which connects the seat of the municipality of Cacolo to the communes of Alto-Chicapa and Cucumbi, is making it difficult to meet deadlines for works in the Integrated Plan for Intervention in Municipalities (PIIM). This is the construction of a school with seven classrooms, in the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\" \/>\n<meta property=\"og:site_name\" content=\"Angola\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-06T08:02:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Access difficulties prevent completion of PIIM projects in Cacolo\",\"datePublished\":\"2023-04-06T08:02:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\"},\"wordCount\":283,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Angola\",\"Angola\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\",\"url\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\",\"name\":\"Access difficulties prevent completion of PIIM projects in Cacolo - Angola\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg\",\"datePublished\":\"2023-04-06T08:02:05+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg\",\"width\":1280,\"height\":720,\"caption\":\"Access difficulties prevent completion of PIIM projects in Cacolo\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/angola\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Access difficulties prevent completion of PIIM projects in Cacolo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\",\"url\":\"https:\/\/www.africa-press.net\/angola\/\",\"name\":\"Angola\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Access difficulties prevent completion of PIIM projects in Cacolo - Angola","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo","og_locale":"en_US","og_type":"article","og_title":"Access difficulties prevent completion of PIIM projects in Cacolo","og_description":"Africa-Press &#8211; Angola. The poor state of the road, which connects the seat of the municipality of Cacolo to the communes of Alto-Chicapa and Cucumbi, is making it difficult to meet deadlines for works in the Integrated Plan for Intervention in Municipalities (PIIM). This is the construction of a school with seven classrooms, in the [&hellip;]","og_url":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo","og_site_name":"Angola","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-04-06T08:02:05+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Access difficulties prevent completion of PIIM projects in Cacolo","datePublished":"2023-04-06T08:02:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo"},"wordCount":283,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg","keywords":["Africa Press","Africa Press-Angola","Angola"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo","url":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo","name":"Access difficulties prevent completion of PIIM projects in Cacolo - Angola","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg","datePublished":"2023-04-06T08:02:05+00:00","author":{"@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#primaryimage","url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg","contentUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/04\/postQueueImg_1680745167.67.jpg","width":1280,"height":720,"caption":"Access difficulties prevent completion of PIIM projects in Cacolo"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/access-difficulties-prevent-completion-of-piim-projects-in-cacolo#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/angola\/"},{"@type":"ListItem","position":2,"name":"Access difficulties prevent completion of PIIM projects in Cacolo"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/angola\/#website","url":"https:\/\/www.africa-press.net\/angola\/","name":"Angola","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/31264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/comments?post=31264"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/31264\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media\/31263"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media?parent=31264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/categories?post=31264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/tags?post=31264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}