{"id":47244,"date":"2023-10-17T06:49:24","date_gmt":"2023-10-17T06:49:24","guid":{"rendered":"https:\/\/www.africa-press.net\/angola\/?p=47244"},"modified":"2023-10-17T06:41:53","modified_gmt":"2023-10-17T06:41:53","slug":"executive-maintains-commitment-to-road-infrastructure","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure","title":{"rendered":"Executive maintains commitment to road infrastructure"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Angola. <\/strong><\/span><b>1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduction of regional asymmetries, President Joa\u0303o Lourenc\u0327o reported this Monday.<\/b><\/p>\n<p>When presenting the Message on the State of the Nation, at the National Assembly, the Head of State made it known that, in the same period, 3,985 meters of concrete bridge were built and rehabilitated.<\/p>\n<p>According to Joa\u0303o Lourenc\u0327o, 2,059 kilometers of roads were also rehabilitated, as part of the rescue plan, and 1,200 meters of metal bridges were built.<\/p>\n<p>During this period, he explained, 168 kilometers of urban roads were paved and 262 hectares of areas with ravines across the country were stabilized.<\/p>\n<p>Reinforcement of investment in infrastructures<\/p>\n<p>According to the President of the Republic, despite financial constraints, the Angolan Government ensures the construction and completion of several road infrastructures, important for national mobility.<\/p>\n<p>This is, specifically, the rehabilitation of the Long River Bridge\/Keve River Bridge section in the province of Cuanza Sul.<\/p>\n<p>In this regard, the Head of State reiterated his commitment to the rehabilitation of the Mussende\/quarenta\/Porto Condo\/Cangandala section between the provinces of Cuanza Sul and Malanje.<\/p>\n<p>According to the President of the Republic, the priorities also include the rehabilitation of the Samba Caju\u0301\/Uyangombe, Banga\/Kikulungo-Bolongongo section, in Cuanza Norte, as well as the Lulenga\/Calulo\/Luaty bypass axis, in Cuanza Sul.<\/p>\n<p>Still on the roads, he announced that the rehabilitation of the National Road 230 (EN-230) is underway, on the perimeter of the city of Malanje, Saurimo, the Saurimo\/Dala section (Lunda Sul), the Lucapa\/Saurimo diversion (Lunda Norte and Lunda South), Lau\/Marco 25\/Cazombo (Moxico), Sanza Pombo\/Bwengas (Ui\u0301ge), as well as the Lucoc\u0327a\/Mpala\/Nhoki and Nzeto\/Soyo sections, in the province of Zaire.<\/p>\n<p>In Cabinda, Joa\u0303o Lourenc\u0327o highlighted that the EN-100 is in a poor state of conservation, but the 295 kilometers are already being repaired, which will improve road circulation from North to South and allow greater ease in the mobility of people and goods in this province.<\/p>\n<p>The President of the Republic expressed continued commitment to mobilizing resources to continue improving the country&#8217;s road infrastructure, with priority given to the rehabilitation of the Benguela\/Lubango, Mussende\/Andulo, Cunje\/Catabola\/Camacupa, Muyango\/Luena, Camacupa sections \/Muyango, Kuito Cuanavale\/Mavinga, Luena\/Leua\/Lumeji\/Luacamo and Luau.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/angola\">Angola<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Angola. 1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduction of regional asymmetries, President Joa\u0303o Lourenc\u0327o reported this Monday. When presenting the Message on the State of the Nation, at the National Assembly, the Head of State made it known that, in [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":47242,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,337,329],"class_list":["post-47244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-angola","tag-angola"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Executive maintains commitment to road infrastructure - Angola<\/title>\n<meta name=\"description\" content=\"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Executive maintains commitment to road infrastructure\" \/>\n<meta property=\"og:description\" content=\"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\" \/>\n<meta property=\"og:site_name\" content=\"Angola\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-17T06:49:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1759\" \/>\n\t<meta property=\"og:image:height\" content=\"1129\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Executive maintains commitment to road infrastructure\",\"datePublished\":\"2023-10-17T06:49:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\"},\"wordCount\":406,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Angola\",\"Angola\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\",\"url\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\",\"name\":\"Executive maintains commitment to road infrastructure - Angola\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg\",\"datePublished\":\"2023-10-17T06:49:24+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg\",\"width\":1759,\"height\":1129,\"caption\":\"Executive maintains commitment to road infrastructure\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/angola\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Executive maintains commitment to road infrastructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\",\"url\":\"https:\/\/www.africa-press.net\/angola\/\",\"name\":\"Angola\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Executive maintains commitment to road infrastructure - Angola","description":"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure","og_locale":"en_US","og_type":"article","og_title":"Executive maintains commitment to road infrastructure","og_description":"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...","og_url":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure","og_site_name":"Angola","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-10-17T06:49:24+00:00","og_image":[{"width":1759,"height":1129,"url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Executive maintains commitment to road infrastructure","datePublished":"2023-10-17T06:49:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure"},"wordCount":406,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg","keywords":["Africa Press","Africa Press-Angola","Angola"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure","url":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure","name":"Executive maintains commitment to road infrastructure - Angola","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg","datePublished":"2023-10-17T06:49:24+00:00","author":{"@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"1,945 kilometers of road on the national network benefited from paving, in the period 2018-2022, as part of the reduc ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#primaryimage","url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg","contentUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2023\/10\/sm_1697512262.696957.jpg","width":1759,"height":1129,"caption":"Executive maintains commitment to road infrastructure"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-maintains-commitment-to-road-infrastructure#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/angola\/"},{"@type":"ListItem","position":2,"name":"Executive maintains commitment to road infrastructure"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/angola\/#website","url":"https:\/\/www.africa-press.net\/angola\/","name":"Angola","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/47244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/comments?post=47244"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/47244\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media\/47242"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media?parent=47244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/categories?post=47244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/tags?post=47244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}