{"id":63764,"date":"2024-06-01T18:08:15","date_gmt":"2024-06-01T18:08:15","guid":{"rendered":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy"},"modified":"2024-06-01T19:00:52","modified_gmt":"2024-06-01T19:00:52","slug":"executive-prioritizes-distribution-of-electrical-energy","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy","title":{"rendered":"Executive prioritizes distribution of electrical energy"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Angola. <\/strong><\/span><b>The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the transport and distribution of electrical energy must be the &#8220;priority of priorities&#8221; of the sector, taking into account the sustainable development of Angola and the well-being of its citizens.<\/b><\/p>\n<p>According to the Head of State, in statements to the press after inaugurating the Matala Hydroelectric Plant, this priority comes from the fact that only ten of the country&#8217;s 18 provinces are connected to the national grid.<\/p>\n<p>Without neglecting production, an area in which the country is already self-sufficient, Joa\u0303o Lourenc\u0327o raised the possibility, in the near future, of exporting energy to the Democratic Republic of Congo and Zambia, as well as injecting electricity into the Southern African Development Community network. (SADC), from Ruacana\u0301 (Cuando-Cubango).<\/p>\n<p>On the other hand, Joa\u0303o Lourenc\u0327o recalled that of the country&#8217;s two large basins, the main one is Cuanza where there are already three large dams, namely Kapanda, Lau\u0301ca and Cambambe, which recently benefited from restoration works.<\/p>\n<p>He said, at the moment, in the same basin, the Caculo-Cabac\u0327a dam is under construction, which will be the largest of all in the country, with two thousand 171 megawatts.<\/p>\n<p>He added that three new hydroelectric plants are planned to be built in the same location, namely Zenzo (one thousand megawatts), Tu\u0301mulo do Cac\u0327ador (500 megawatts) and Baynes (300 megawatts).<\/p>\n<p>He said that with future projects combined with those already producing, they will exceed seven thousand megawatts, in the Cuanza basin, to be gradually injected into the national energy grid.<\/p>\n<p>Joa\u0303o Lourenc\u0327o inaugurated this Friday, in the province of Hui\u0301la, the Matala Hydroelectric Plant, where the Angolan Executive invested 106 million, 940 thousand, 676, 12 Euros in equipment.<\/p>\n<p>The increase in its production by 13.6 MW will be made possible with the entry into operation of the third turbine, and will mitigate the deficit recorded in recent years and improve the provision of electricity distribution services to communities connected to the southern interconnected system.<\/p>\n<p>The project will also make it possible to reduce the operating cost of thermal power plants, by reducing fossil fuel consumption and guarantee the continuity of electrical energy production for the next 20 years or more.<\/p>\n<p>Matala is a village and seat of the municipality with the same name. It has an estimated population of 355 thousand 456 inhabitants.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/angola\">Angola<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Angola. The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the transport and distribution of electrical energy must be the &#8220;priority of priorities&#8221; of the sector, taking into account the sustainable development of Angola and the well-being of its citizens. According to the Head of [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":63763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,12],"tags":[233,337,329],"class_list":["post-63764","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-policy","tag-africa-press","tag-africa-press-angola","tag-angola"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Executive prioritizes distribution of electrical energy - Angola<\/title>\n<meta name=\"description\" content=\"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Executive prioritizes distribution of electrical energy\" \/>\n<meta property=\"og:description\" content=\"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\" \/>\n<meta property=\"og:site_name\" content=\"Angola\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-01T18:08:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-01T19:00:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Executive prioritizes distribution of electrical energy\",\"datePublished\":\"2024-06-01T18:08:15+00:00\",\"dateModified\":\"2024-06-01T19:00:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\"},\"wordCount\":414,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Angola\",\"Angola\"],\"articleSection\":[\"all news\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\",\"url\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\",\"name\":\"Executive prioritizes distribution of electrical energy - Angola\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg\",\"datePublished\":\"2024-06-01T18:08:15+00:00\",\"dateModified\":\"2024-06-01T19:00:52+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg\",\"width\":1500,\"height\":1000,\"caption\":\"Executive prioritizes distribution of electrical energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/angola\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Executive prioritizes distribution of electrical energy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#website\",\"url\":\"https:\/\/www.africa-press.net\/angola\/\",\"name\":\"Angola\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Executive prioritizes distribution of electrical energy - Angola","description":"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy","og_locale":"en_US","og_type":"article","og_title":"Executive prioritizes distribution of electrical energy","og_description":"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...","og_url":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy","og_site_name":"Angola","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-06-01T18:08:15+00:00","article_modified_time":"2024-06-01T19:00:52+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Executive prioritizes distribution of electrical energy","datePublished":"2024-06-01T18:08:15+00:00","dateModified":"2024-06-01T19:00:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy"},"wordCount":414,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg","keywords":["Africa Press","Africa Press-Angola","Angola"],"articleSection":["all news","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy","url":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy","name":"Executive prioritizes distribution of electrical energy - Angola","isPartOf":{"@id":"https:\/\/www.africa-press.net\/angola\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg","datePublished":"2024-06-01T18:08:15+00:00","dateModified":"2024-06-01T19:00:52+00:00","author":{"@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The President of the Republic, Joa\u0303o Lourenc\u0327o, stated this Friday, in the municipality of Matala, Hui\u0301la, that the t ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#primaryimage","url":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg","contentUrl":"https:\/\/static.africa-press.net\/angola\/sites\/65\/2024\/06\/sm_1717255624.487054.jpg","width":1500,"height":1000,"caption":"Executive prioritizes distribution of electrical energy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/angola\/all-news\/executive-prioritizes-distribution-of-electrical-energy#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/angola\/"},{"@type":"ListItem","position":2,"name":"Executive prioritizes distribution of electrical energy"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/angola\/#website","url":"https:\/\/www.africa-press.net\/angola\/","name":"Angola","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/angola\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/angola\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/63764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/comments?post=63764"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/posts\/63764\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media\/63763"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/media?parent=63764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/categories?post=63764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/angola\/wp-json\/wp\/v2\/tags?post=63764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}