{"id":20481,"date":"2023-01-23T09:51:56","date_gmt":"2023-01-23T09:51:56","guid":{"rendered":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion"},"modified":"2023-01-23T11:22:04","modified_gmt":"2023-01-23T11:22:04","slug":"werda-makopong-road-nears-completion","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion","title":{"rendered":"WERDA-MAKOPONG ROAD NEARS COMPLETION"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Botswana. <\/strong><\/span><b>Resealing and marking of the road between Werda and Makopong is almost complete.<\/b><\/p>\n<p>Speaking in an interview recently, Millennium Holdings site agent, Mr Tebogo Cholo expressed optimism that the work was almost complete as it stood at 95.8 per cent completion rate.<\/p>\n<p>He said most of the stretches were completed on December 6 last year, adding that they were only left with surfacing of two bus stops and a junction to the Werda Kgotla, as well as road marking the remaining 2km stretch.<\/p>\n<p>\u201cOnce the material arrives we shall complete the remaining work within a day,\u201d he said.<\/p>\n<p>The 30 km road between Werda and Makopong was awarded a total of P21 million for resealing, applying of slurry, pothole patching and installation of road signs, shoulder widening and road reconstruction of some parts of the road.<\/p>\n<p>Kgalagadi District Council chairman, Mr Hendrick Jacobs had in the past expressed concern that the project was moving at a snail pace. The contractor was granted extension for completion but due to the increase in quantities of potholes, and an additional two months for delays attributed to COVID-19 national lockdown.<\/p>\n<p>The challenges extended contract completion date to September 4, 2020 which still failed to meet the deadline.<\/p>\n<p>Nonetheless, Mr Jacobs appreciated that the contractor was on site and was making headway as progress was visible.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/botswana\">Botswana<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Botswana. Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recently, Millennium Holdings site agent, Mr Tebogo Cholo expressed optimism that the work was almost complete as it stood at 95.8 per cent completion rate. He said most of the stretches were completed on December [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":20480,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,7],"tags":[233,237,234],"class_list":["post-20481","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-head-lines","tag-africa-press","tag-africa-press-botswana","tag-botswana"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>WERDA-MAKOPONG ROAD NEARS COMPLETION - Botswana<\/title>\n<meta name=\"description\" content=\"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WERDA-MAKOPONG ROAD NEARS COMPLETION\" \/>\n<meta property=\"og:description\" content=\"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\" \/>\n<meta property=\"og:site_name\" content=\"Botswana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-23T09:51:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T11:22:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1134\" \/>\n\t<meta property=\"og:image:height\" content=\"483\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"WERDA-MAKOPONG ROAD NEARS COMPLETION\",\"datePublished\":\"2023-01-23T09:51:56+00:00\",\"dateModified\":\"2023-01-23T11:22:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\"},\"wordCount\":232,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Botswana\",\"Botswana\"],\"articleSection\":[\"all news\",\"economy\",\"head lines\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\",\"url\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\",\"name\":\"WERDA-MAKOPONG ROAD NEARS COMPLETION - Botswana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg\",\"datePublished\":\"2023-01-23T09:51:56+00:00\",\"dateModified\":\"2023-01-23T11:22:04+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg\",\"width\":1134,\"height\":483,\"caption\":\"WERDA-MAKOPONG ROAD NEARS COMPLETION\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/botswana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WERDA-MAKOPONG ROAD NEARS COMPLETION\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/botswana\/\",\"name\":\"Botswana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/botswana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"WERDA-MAKOPONG ROAD NEARS COMPLETION - Botswana","description":"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion","og_locale":"en_US","og_type":"article","og_title":"WERDA-MAKOPONG ROAD NEARS COMPLETION","og_description":"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...","og_url":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion","og_site_name":"Botswana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-01-23T09:51:56+00:00","article_modified_time":"2023-01-23T11:22:04+00:00","og_image":[{"width":1134,"height":483,"url":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"WERDA-MAKOPONG ROAD NEARS COMPLETION","datePublished":"2023-01-23T09:51:56+00:00","dateModified":"2023-01-23T11:22:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion"},"wordCount":232,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg","keywords":["Africa Press","Africa Press-Botswana","Botswana"],"articleSection":["all news","economy","head lines"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion","url":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion","name":"WERDA-MAKOPONG ROAD NEARS COMPLETION - Botswana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/botswana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg","datePublished":"2023-01-23T09:51:56+00:00","dateModified":"2023-01-23T11:22:04+00:00","author":{"@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Resealing and marking of the road between Werda and Makopong is almost complete. Speaking in an interview recent ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#primaryimage","url":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg","contentUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2023\/01\/postQueueImg_1674454986.96.jpg","width":1134,"height":483,"caption":"WERDA-MAKOPONG ROAD NEARS COMPLETION"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/werda-makopong-road-nears-completion#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/botswana\/"},{"@type":"ListItem","position":2,"name":"WERDA-MAKOPONG ROAD NEARS COMPLETION"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/botswana\/#website","url":"https:\/\/www.africa-press.net\/botswana\/","name":"Botswana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/botswana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts\/20481","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/comments?post=20481"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts\/20481\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/media\/20480"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/media?parent=20481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/categories?post=20481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/tags?post=20481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}