{"id":51704,"date":"2024-07-17T18:34:50","date_gmt":"2024-07-17T18:34:50","guid":{"rendered":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing"},"modified":"2024-07-17T19:05:22","modified_gmt":"2024-07-17T19:05:22","slug":"letlhakane-water-network-upgrading-ongoing","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing","title":{"rendered":"LETLHAKANE WATER NETWORK UPGRADING ONGOING"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Botswana. <\/strong><\/span><b>Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network.<\/b><\/p>\n<p>The WUC project manager, Mr Modisaotsile Basinyi told a Wednesday kgotla meeting addressed by the Member Parliament for Boteti East that the aim of the P9.5 million-project was to upgrade the existing booster station, construct pipeline from booster station to collector tank at Phase One and rehabilitate of old tanks.<\/p>\n<p>He noted that the contractor, Rasto Engineering started with the project on June 19 and was expected to complete it in December.<\/p>\n<p>For is part, Rasto Engineering contractor, Mr Erastus Kavezeri said the project was at design stage, which would be followed by construction.<\/p>\n<p>Mr Kavezeri stated that the company had not yet started recruitment as final design would determine the total number of personnel required.<\/p>\n<p>Furthermore, general manager of WUC, Letlhakane Mr Kehano Malema stated that over and above the current works, a long term solution project, which aimed to augment water supply in the village, would rehabilitate existing infrastructure and attend to unserviced plots in Letlhakane through National Development Plan 12.<\/p>\n<p>Mr Malema indicated that the whole village would be modelled and that would determine where to place elevated tanks and a booster station if required.<\/p>\n<p>In addition, he disclosed that the project tender to establish a treatment plant to treat raw water from Lucara had been awarded and initiation workshop would be held before the end of this month.<\/p>\n<p>He stated that four contractors had also been engaged to address the backlog of private water connections in the village.<\/p>\n<p><strong>For More News And Analysis About Botswana Follow Africa-Press<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Botswana. Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC project manager, Mr Modisaotsile Basinyi told a Wednesday kgotla meeting addressed by the Member Parliament for Boteti East that the aim of the P9.5 million-project was to upgrade the existing booster station, construct pipeline from booster station [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":51703,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,12],"tags":[234],"class_list":["post-51704","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-policy","tag-botswana"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>LETLHAKANE WATER NETWORK UPGRADING ONGOING - Botswana<\/title>\n<meta name=\"description\" content=\"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LETLHAKANE WATER NETWORK UPGRADING ONGOING\" \/>\n<meta property=\"og:description\" content=\"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\" \/>\n<meta property=\"og:site_name\" content=\"Botswana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-17T18:34:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-17T19:05:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1792\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"LETLHAKANE WATER NETWORK UPGRADING ONGOING\",\"datePublished\":\"2024-07-17T18:34:50+00:00\",\"dateModified\":\"2024-07-17T19:05:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\"},\"wordCount\":270,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg\",\"keywords\":[\"Botswana\"],\"articleSection\":[\"all news\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\",\"url\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\",\"name\":\"LETLHAKANE WATER NETWORK UPGRADING ONGOING - Botswana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg\",\"datePublished\":\"2024-07-17T18:34:50+00:00\",\"dateModified\":\"2024-07-17T19:05:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg\",\"width\":1792,\"height\":1152,\"caption\":\"LETLHAKANE WATER NETWORK UPGRADING ONGOING\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/botswana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LETLHAKANE WATER NETWORK UPGRADING ONGOING\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/botswana\/\",\"name\":\"Botswana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/botswana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"LETLHAKANE WATER NETWORK UPGRADING ONGOING - Botswana","description":"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing","og_locale":"en_US","og_type":"article","og_title":"LETLHAKANE WATER NETWORK UPGRADING ONGOING","og_description":"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...","og_url":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing","og_site_name":"Botswana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-07-17T18:34:50+00:00","article_modified_time":"2024-07-17T19:05:22+00:00","og_image":[{"width":1792,"height":1152,"url":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"LETLHAKANE WATER NETWORK UPGRADING ONGOING","datePublished":"2024-07-17T18:34:50+00:00","dateModified":"2024-07-17T19:05:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing"},"wordCount":270,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg","keywords":["Botswana"],"articleSection":["all news","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing","url":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing","name":"LETLHAKANE WATER NETWORK UPGRADING ONGOING - Botswana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/botswana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg","datePublished":"2024-07-17T18:34:50+00:00","dateModified":"2024-07-17T19:05:22+00:00","author":{"@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Water Utilities Corporation (WUC) is hard at work upgrading Letlhakane water distribution network. The WUC proje ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#primaryimage","url":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg","contentUrl":"https:\/\/static.africa-press.net\/botswana\/sites\/38\/2024\/07\/sm_1721230423.399528.jpg","width":1792,"height":1152,"caption":"LETLHAKANE WATER NETWORK UPGRADING ONGOING"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/botswana\/all-news\/letlhakane-water-network-upgrading-ongoing#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/botswana\/"},{"@type":"ListItem","position":2,"name":"LETLHAKANE WATER NETWORK UPGRADING ONGOING"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/botswana\/#website","url":"https:\/\/www.africa-press.net\/botswana\/","name":"Botswana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/botswana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/botswana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts\/51704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/comments?post=51704"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/posts\/51704\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/media\/51703"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/media?parent=51704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/categories?post=51704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/botswana\/wp-json\/wp\/v2\/tags?post=51704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}