{"id":24228,"date":"2024-04-30T20:12:43","date_gmt":"2024-04-30T20:12:43","guid":{"rendered":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition"},"modified":"2024-04-30T23:48:51","modified_gmt":"2024-04-30T23:48:51","slug":"president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","title":{"rendered":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Cape verde. <\/strong><\/span>The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the island&#8217;s energy transition, said today the chairman of Electra&#8217;s board of directors.<\/p>\n<p>According to Lui\u0301s Teixeira, this is a Government project that represents \u201cmore or less half of the island&#8217;s current production\u201d and with \u201ca lot of impact\u201d, especially on the energy transition and the reduction in fuel input and consumption on the island.<\/p>\n<p>Lui\u0301s Teixeira said that a competition was launched for the solar panels with a winner and the contractor confirmed, as the works will begin in mid-June\/July, in the town of Patim, south of the municipality of Sa\u0303o Filipe, where it will be located the central.<\/p>\n<p>Regarding batteries, he said that they are currently in the process of launching a public tender to select a supplier.<\/p>\n<p>Lui\u0301s Teixeira said that Electra is just a buyer of the energy that will be produced and that the Government has been leading the entire process and, therefore, refused to advance the value of the financing.<\/p>\n<p>On the other hand, the president of the board of directors of Electra, who is on the island of Fogo to inaugurate the Mosteiros store, said that the company is setting up a \u201cbig project\u201d with the government to change all the light bulbs, making the transition from sodium and mercury vapor lamps to LED, as happened on the islands of Sal and Santiago (Praia) and with \u201csignificant gains\u201d, with savings of \u201cmore than 50 percent (%)\u201d.<\/p>\n<p>According to him, someone has to pay for public lighting and today it is the citizens who pay and when less energy is spent on \u201cilluminating Cape Verde\u201d there will be fewer costs.<\/p>\n<p>\u201cIn Cape Verde we have something we call &#8216;scada&#8217;, a national dispatch center, which monitors the electrical system and at the moment we only have it on three islands, Santiago, Sal and Sa\u0303o Vicente, and we are in the process of taking it to the other islands, including Fogo\u201d, said Lui\u0301s Teixeira, hoping that \u201cvery soon\u201d the island can be integrated into the system.<\/p>\n<p>The same source acknowledged that public lighting is always a problem because people ask for a station next to their house, adding that it cannot be seen from this perspective.<\/p>\n<p>\u201cOn the island of Fogo we have around 4,200 public lighting points with a ratio of 12 points for every 100 thousand inhabitants. It\u2019s a reasonable number, but we need to improve and we are in the process of reinforcing the lighting\u201d highlighted Lui\u0301s Teixeira.<\/p>\n<p>Finally, he indicated that the points that do not yet have lighting will be covered and in areas with faulty lamps, maintenance and replacement will be carried out, noting that the company received a \u201cgood stock\u201d of lamps, but for the whole of Cape Verde.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/cape-verde\">Cape verde<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Cape verde. The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the island&#8217;s energy transition, said today the chairman of Electra&#8217;s board of directors. According to Lui\u0301s Teixeira, this is a Government project that represents \u201cmore or less half of the island&#8217;s current [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":24227,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,331,328],"class_list":["post-24228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-cape-verde","tag-cape-verde"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde<\/title>\n<meta name=\"description\" content=\"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde\" \/>\n<meta property=\"og:description\" content=\"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\" \/>\n<meta property=\"og:site_name\" content=\"Cape Verde\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-30T20:12:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-30T23:48:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition\",\"datePublished\":\"2024-04-30T20:12:43+00:00\",\"dateModified\":\"2024-04-30T23:48:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\"},\"wordCount\":507,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Cape verde\",\"Cape verde\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\",\"url\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\",\"name\":\"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg\",\"datePublished\":\"2024-04-30T20:12:43+00:00\",\"dateModified\":\"2024-04-30T23:48:51+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg\",\"width\":800,\"height\":480,\"caption\":\"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/cape-verde\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#website\",\"url\":\"https:\/\/www.africa-press.net\/cape-verde\/\",\"name\":\"Cape Verde\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/cape-verde\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde","description":"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","og_locale":"en_US","og_type":"article","og_title":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde","og_description":"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...","og_url":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","og_site_name":"Cape Verde","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-04-30T20:12:43+00:00","article_modified_time":"2024-04-30T23:48:51+00:00","og_image":[{"width":800,"height":480,"url":"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition","datePublished":"2024-04-30T20:12:43+00:00","dateModified":"2024-04-30T23:48:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition"},"wordCount":507,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg","keywords":["Africa Press","Africa Press-Cape verde","Cape verde"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","url":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition","name":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition - Cape Verde","isPartOf":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg","datePublished":"2024-04-30T20:12:43+00:00","dateModified":"2024-04-30T23:48:51+00:00","author":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The construction of the solar plant with a capacity of 1.4 megawatts and batteries of two megawatts\/hour will change the ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#primaryimage","url":"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg","contentUrl":"https:\/\/static.africa-press.net\/cape-verde\/sites\/66\/2024\/04\/sm_1714495652.954251.jpg","width":800,"height":480,"caption":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/cape-verde\/all-news\/president-of-electra-says-that-1-4-megawatt-solar-plant-will-change-the-island-in-terms-of-energy-transition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/cape-verde\/"},{"@type":"ListItem","position":2,"name":"President of Electra says that 1.4 megawatt solar plant will change the island in terms of energy transition"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/cape-verde\/#website","url":"https:\/\/www.africa-press.net\/cape-verde\/","name":"Cape Verde","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/cape-verde\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/cape-verde\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/posts\/24228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/comments?post=24228"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/posts\/24228\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/media\/24227"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/media?parent=24228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/categories?post=24228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/cape-verde\/wp-json\/wp\/v2\/tags?post=24228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}