{"id":9332,"date":"2022-07-17T14:00:57","date_gmt":"2022-07-17T14:00:57","guid":{"rendered":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart"},"modified":"2022-07-17T15:09:12","modified_gmt":"2022-07-17T15:09:12","slug":"public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","title":{"rendered":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Eswatini. <\/strong><\/span><b>Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6billion Probase Project falls apart.<\/b><\/p>\n<p>The project meant to rehabilitate and stabilise 200km of gravel roads across the country is managed by Probase Swaziland (Pty) (Ltd), a royalty linked company with Malaysian origins.<\/p>\n<p>It has been disclosed that part of the road includes a 14.5 km stretch from LaMgabhi Etiyeni to Mbabane via Ghobolo, whose culvert bridge collapsed three (3)times since 2020.<\/p>\n<p>On Friday, Richard Maseko, the Hhukwini Constituency Development Officer blamed the company for engaging incompetent engineers.<\/p>\n<p>&#8220;By the look of things the whole road will end up being washed away. It\u2019s clear that the company is engaging unqualified or incompetent engineers. We would like to appeal to Government to at least engage a reputable contractor to fix the bridge as this one has failed for the third time&#8221;, he said.<\/p>\n<p>Efforts to reach Probase Swaziland Management proved futile and Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport had not responded at the time of compiling this report.<\/p>\n<p>A resident of the area who spoke to this publication said the bridge has been collapsing every summer since the probase road was constructed in 2020.<\/p>\n<p>\u201cEach time the bridge collapses we are forced to take an alternative slippery road which makes it difficult for us to travel to town and work,\u201dsaid the resident.<\/p>\n<p>Reached for comments, Thandaza Silolo, the Spokesperson of the Swaziland Liberation Movement (SWALIMO) said this project was solely meant to loot public funds.<\/p>\n<p>\u201cYou will remember that this probase idea came from royalty after learning about it from overseas. So this was solely meant to loot our taxes by constructing substandard roads in the pretext of upgrading gravel roads, the results are now showing. Since this Government is failing to serve the people, surely this is the right time for a democratic Government to take over,\u201dsaid the SWALIMO Spokesperson.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/eswatini\">Eswatini<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Eswatini. Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6billion Probase Project falls apart. The project meant to rehabilitate and stabilise 200km of gravel roads across the country is managed by Probase Swaziland (Pty) (Ltd), a royalty linked company with Malaysian origins. It has been [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":9331,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,7,8,12,16],"tags":[234,248,249],"class_list":["post-9332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-head-lines","category-homepage-english","category-policy","category-twitter","tag-africa-press","tag-africa-press-eswatini","tag-eswatini"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Public Works Minister avoids questions as R1.6 billion Probase Project falls apart - Eswatini<\/title>\n<meta name=\"description\" content=\"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart\" \/>\n<meta property=\"og:description\" content=\"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\" \/>\n<meta property=\"og:site_name\" content=\"Eswatini\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-17T14:00:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-17T15:09:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1082\" \/>\n\t<meta property=\"og:image:height\" content=\"446\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart\",\"datePublished\":\"2022-07-17T14:00:57+00:00\",\"dateModified\":\"2022-07-17T15:09:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\"},\"wordCount\":345,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Eswatini\",\"Eswatini\"],\"articleSection\":[\"all news\",\"head lines\",\"homepage-english\",\"policy\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\",\"url\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\",\"name\":\"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart - Eswatini\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg\",\"datePublished\":\"2022-07-17T14:00:57+00:00\",\"dateModified\":\"2022-07-17T15:09:12+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg\",\"width\":1082,\"height\":446,\"caption\":\"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/eswatini\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#website\",\"url\":\"https:\/\/www.africa-press.net\/eswatini\/\",\"name\":\"Eswatini\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/eswatini\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart - Eswatini","description":"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","og_locale":"en_US","og_type":"article","og_title":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart","og_description":"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...","og_url":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","og_site_name":"Eswatini","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-07-17T14:00:57+00:00","article_modified_time":"2022-07-17T15:09:12+00:00","og_image":[{"width":1082,"height":446,"url":"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart","datePublished":"2022-07-17T14:00:57+00:00","dateModified":"2022-07-17T15:09:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart"},"wordCount":345,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg","keywords":["Africa Press","Africa Press-Eswatini","Eswatini"],"articleSection":["all news","head lines","homepage-english","policy","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","url":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart","name":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart - Eswatini","isPartOf":{"@id":"https:\/\/www.africa-press.net\/eswatini\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg","datePublished":"2022-07-17T14:00:57+00:00","dateModified":"2022-07-17T15:09:12+00:00","author":{"@id":"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Chief Ndlaluhlaza Ndwandwe, the Minister of Public Works and Transport avoided questions from journalists as a R1.6bi ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#primaryimage","url":"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg","contentUrl":"https:\/\/static.africa-press.net\/eswatini\/sites\/33\/2022\/07\/postQueueImg_3-62d425ef2a13b.jpg","width":1082,"height":446,"caption":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/eswatini\/all-news\/public-works-minister-avoids-questions-as-r1-6-billion-probase-project-falls-apart#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/eswatini\/"},{"@type":"ListItem","position":2,"name":"Public Works Minister avoids questions as R1.6 billion Probase Project falls apart"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/eswatini\/#website","url":"https:\/\/www.africa-press.net\/eswatini\/","name":"Eswatini","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/eswatini\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/eswatini\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/posts\/9332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/comments?post=9332"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/posts\/9332\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/media\/9331"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/media?parent=9332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/categories?post=9332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/eswatini\/wp-json\/wp\/v2\/tags?post=9332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}