{"id":22977,"date":"2023-10-09T20:25:45","date_gmt":"2023-10-09T20:25:45","guid":{"rendered":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says"},"modified":"2023-10-09T22:01:30","modified_gmt":"2023-10-09T22:01:30","slug":"civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","title":{"rendered":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Ethiopia. <\/strong><\/span>The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal year, President Sahle-work Zewde disclosed.<\/p>\n<p>The joint session of the third year and sixth tenure of the House of Peoples\u2019 Representatives of Ethiopia and the House of Federation held today in the presence of Prime Minister Abiy Ahmed and diplomats of various countries.<\/p>\n<p>During the occasion, President Sahle-Work Zewde has delivered a speech that highlighted the performances of the previous year and government\u2019s key plans during the 2016 Ethiopian fiscal year.<\/p>\n<p>In her speech, the president indicated the successes being registered in the diplomatic sphere both in bilateral and multilateral levels.<\/p>\n<p>In this regard she mentioned the successful conduct of the final and 4th round filling of GERD during the conclude fiscal year.<\/p>\n<p>The president said the construction of GERD has reached more than 90 percent indicating the fact that GERD is instrumental to realizing Ethiopia&#8217;s prosperity.<\/p>\n<p>She said the overall civil work construction is expected to be fully completed during the current Ethiopian budget year.<\/p>\n<p>GERD is not only source of electric power; the president pointed out stating that the project also encompasses tourism and water resources which are vital for the protection of environment.<\/p>\n<p>Sahlework further said that the ongoing negotiations will be pursed in a way that does not defy Ethiopia\u2019s right to develop using its natural resources thereby causing no significant harm on down-stream countries.<\/p>\n<p>The president said the fact, that GERD will never harm the riparian countries, has been practically proved.<\/p>\n<p>She also indicated the dam is a project that realizes Ethiopia\u2019s development demand and ensures equal utilization of common natural resources.<\/p>\n<p>President Sahle-Work congratulated all Ethiopians for their contribution extended to the successes so far registered in the construction of GERD.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/ethiopia\">Ethiopia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Ethiopia. The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal year, President Sahle-work Zewde disclosed. The joint session of the third year and sixth tenure of the House of Peoples\u2019 Representatives of Ethiopia and the House of Federation held today in the presence of [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":22976,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,12],"tags":[233,277,235],"class_list":["post-22977","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-policy","tag-africa-press","tag-africa-press-ethiopia-2","tag-ethiopia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says - Ethiopia<\/title>\n<meta name=\"description\" content=\"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says\" \/>\n<meta property=\"og:description\" content=\"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\" \/>\n<meta property=\"og:site_name\" content=\"Ethiopia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-09T20:25:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-09T22:01:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"759\" \/>\n\t<meta property=\"og:image:height\" content=\"455\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says\",\"datePublished\":\"2023-10-09T20:25:45+00:00\",\"dateModified\":\"2023-10-09T22:01:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\"},\"wordCount\":323,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Ethiopia\",\"ethiopia\"],\"articleSection\":[\"all news\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\",\"url\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\",\"name\":\"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says - Ethiopia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg\",\"datePublished\":\"2023-10-09T20:25:45+00:00\",\"dateModified\":\"2023-10-09T22:01:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg\",\"width\":759,\"height\":455,\"caption\":\"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ethiopia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ethiopia\/\",\"name\":\"Ethiopia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ethiopia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says - Ethiopia","description":"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","og_locale":"en_US","og_type":"article","og_title":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says","og_description":"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...","og_url":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","og_site_name":"Ethiopia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-10-09T20:25:45+00:00","article_modified_time":"2023-10-09T22:01:30+00:00","og_image":[{"width":759,"height":455,"url":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says","datePublished":"2023-10-09T20:25:45+00:00","dateModified":"2023-10-09T22:01:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says"},"wordCount":323,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg","keywords":["Africa Press","Africa Press-Ethiopia","ethiopia"],"articleSection":["all news","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","url":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says","name":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says - Ethiopia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg","datePublished":"2023-10-09T20:25:45+00:00","dateModified":"2023-10-09T22:01:30+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The civil work construction of the Grand Ethiopian Renaissance Dam (GERD) will be completed during the current fiscal ye ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#primaryimage","url":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg","contentUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2023\/10\/sm_1696872311.571839.jpg","width":759,"height":455,"caption":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/civil-work-construction-of-gerd-will-be-completed-during-current-fiscal-year-president-says#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ethiopia\/"},{"@type":"ListItem","position":2,"name":"Civil Work Construction of GERD Will Be Completed During Current Fiscal Year, President Says"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ethiopia\/#website","url":"https:\/\/www.africa-press.net\/ethiopia\/","name":"Ethiopia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ethiopia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts\/22977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/comments?post=22977"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts\/22977\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/media\/22976"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/media?parent=22977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/categories?post=22977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/tags?post=22977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}