{"id":4419,"date":"2021-04-18T16:21:38","date_gmt":"2021-04-18T16:21:38","guid":{"rendered":"https:\/\/www.africa-press.net\/ethiopia\/?p=4419"},"modified":"2021-04-18T16:03:52","modified_gmt":"2021-04-18T16:03:52","slug":"two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","title":{"rendered":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/ethiopia\">Ethiopia<\/a>. <\/strong><\/span>Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the construction two bottom outlets (BO) of the GERD that provides release of water into the downstream has been completed, tested and become operational.<\/p>\n<p>The 2 BOs have capacity of passing entire annual Abbay flow in a year, provide assurances of flow of water to downstream at no time water interrupted, the Minister Twitted.<\/p>\n<p>According to him, other 13 outlets are under construction adding huge capacity of water release.<\/p>\n<p>In the rainy season these BO guarantee flow while filling takes place as inflow exceeding outflow at reservoir. As such GERD is important for power generation for the needs of Ethiopia, the Minister stated.<\/p>\n<p>\u201cIt removes flood risk in Sudan like the one occurred last season, saves losses of water in flood plains and GERD is not a concern for harm. It is designed smart as filling an construction go in parallel, constructed as high quality &amp; state of the art modern facility. Rests on meters square area,\u201d Sileshi pointed out.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Ethiopia. Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the construction two bottom outlets (BO) of the GERD that provides release of water into the downstream has been completed, tested and become operational. The 2 BOs have capacity of passing entire annual Abbay flow in [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":4418,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[233,277,235],"class_list":["post-4419","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-africa-press-ethiopia-2","tag-ethiopia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister - Ethiopia<\/title>\n<meta name=\"description\" content=\"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister\" \/>\n<meta property=\"og:description\" content=\"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\" \/>\n<meta property=\"og:site_name\" content=\"Ethiopia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-18T16:21:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1021\" \/>\n\t<meta property=\"og:image:height\" content=\"541\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister\",\"datePublished\":\"2021-04-18T16:21:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\"},\"wordCount\":188,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Ethiopia\",\"ethiopia\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\",\"url\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\",\"name\":\"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister - Ethiopia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg\",\"datePublished\":\"2021-04-18T16:21:38+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg\",\"width\":1021,\"height\":541,\"caption\":\"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ethiopia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ethiopia\/\",\"name\":\"Ethiopia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ethiopia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister - Ethiopia","description":"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","og_locale":"en_US","og_type":"article","og_title":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister","og_description":"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...","og_url":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","og_site_name":"Ethiopia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-04-18T16:21:38+00:00","og_image":[{"width":1021,"height":541,"url":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister","datePublished":"2021-04-18T16:21:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister"},"wordCount":188,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg","keywords":["Africa Press","Africa Press-Ethiopia","ethiopia"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","url":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister","name":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister - Ethiopia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg","datePublished":"2021-04-18T16:21:38+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Addis Ababa April 18\/2021 (ENA) Minister of Water, Irrigation and Energy, Sileshi Bekele disclosed today that the constr ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#primaryimage","url":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg","contentUrl":"https:\/\/static.africa-press.net\/ethiopia\/sites\/50\/2021\/04\/img-607c58487a507.jpg","width":1021,"height":541,"caption":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ethiopia\/all-news\/two-bottom-outlets-of-gerd-completed-operationalized-water-irrigation-energy-minister#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ethiopia\/"},{"@type":"ListItem","position":2,"name":"Two Bottom Outlets of GERD Completed, Operationalized: Water, Irrigation &amp; Energy Minister"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ethiopia\/#website","url":"https:\/\/www.africa-press.net\/ethiopia\/","name":"Ethiopia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ethiopia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ethiopia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts\/4419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/comments?post=4419"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/posts\/4419\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/media\/4418"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/media?parent=4419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/categories?post=4419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ethiopia\/wp-json\/wp\/v2\/tags?post=4419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}