{"id":117636,"date":"2026-04-28T11:44:38","date_gmt":"2026-04-28T11:44:38","guid":{"rendered":"https:\/\/www.africa-press.net\/ghana\/uncategorized\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi"},"modified":"2026-04-28T12:08:48","modified_gmt":"2026-04-28T12:08:48","slug":"ecg-inspects-four-major-system-upgrade-projects-in-kumasi","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi","title":{"rendered":"ECG Inspects Four Major System Upgrade Projects in Kumasi"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Ghana. <\/strong><\/span><b>Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major system upgrade projects in Kumasi to inspect the progress of work.<\/b><\/p>\n<p>The projects, initiated by the ECG to improve the quality supply of power to the Ashanti Region included three sub-transmission lines.<\/p>\n<p>These comprise an upgrade of sub-transmission lines from Boadi to Kaase to Ridge Substation, and the construction of a new sub-transmission line from Airport roundabout to Anwomaso Substation.<\/p>\n<p>Also, an upgrade of a sub-transmission line from Neoplan to Barekese and the rehabilitation of the existing Bulk Supply Point (BSP) at the Ridge Substation in Kumasi.<\/p>\n<p>The system upgrade project is a proactive step by the ECG to ensure that power transmission systems in the region are in good shape to serve the current and future growing demand for electricity.<\/p>\n<p>The projects are expected to be completed by the end of this year.<\/p>\n<p>Mr. Kpekpena was accompanied by some members of the management team from Accra and the Ashanti Region, and some selected journalists.<\/p>\n<p>He said one of the reasons for the implementation of the project was to reduce constraints in the transformer capacity and some links.<\/p>\n<p>\u201cWe have constraints in transformer capacity and some of the links. So, we are not able to push the power we take from the transmission grid into the distribution network and our communities,\u201d he explained.<\/p>\n<p>The upgrading is to ensure the easy and safe distribution of quality power supply from the transmission grid, the Acting Manager emphasised.<\/p>\n<p>He noted that the already existing sub-transmission line from Boadi to Kaase to the Ridge Substation was being upgraded from 265 square millimetres (sq.mm) to 400sqmm All Aluminium Conductor (AAC) at a cost of about USD6.8 million.<\/p>\n<p>He also disclosed that about USD10.5 million was being invested in the construction of a new sub-transmission line from the Airport roundabout to the Anwomaso Substation.<\/p>\n<p>Also, about USD400,000 per kilometre was being invested into the construction of about 16km sub-transmission line from Neoplan to Barekese.<\/p>\n<p>Mr. Kpekpena stated that the costs of the construction of the sub-transmission lines could change due to some unexpected activities such as theft.<\/p>\n<p>\u201cSome of the underground cables which were upgraded at Emmina have been stolen by unknown individuals. This will negatively affect the cost of the project,\u201d he said.<\/p>\n<p>Mr. Kpekpena noted that the sub-transmission line being constructed from Neoplan to Barekese was mostly to ensure constant, safe and quality power supply to the Barekese Dam site and other industries on that stretch.<\/p>\n<p>Constant energy supply to the Barekese Dam would foster the supply of good, treated water to citizens in the region.<\/p>\n<p>Mr. Kpekpena disclosed that in addition to the upgrade of transmission systems, ECG was currently installing 65 new distribution lines (transformers) in the Ashanti Region.<\/p>\n<p>He said by the end of the year, the company was expected to have installed about 300 to 400 distribution lines to complement the upgrade of the transmission lines.<\/p>\n<p>Mr. Kpekpena assured citizens and their customers that the completion of the projects would improve the quality of power supply and minimise power outages in the region.<\/p>\n<p><strong>For More News And Analysis About <span style=\"color: #ff6600\">Ghana<\/span> Follow <span style=\"color: #ff6600\">Africa-Press<\/span><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Ghana. Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major system upgrade projects in Kumasi to inspect the progress of work. The projects, initiated by the ECG to improve the quality supply of power to the Ashanti Region included three sub-transmission lines. These comprise [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":117634,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[429],"class_list":["post-117636","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-ghana"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ECG Inspects Four Major System Upgrade Projects in Kumasi - Ghana<\/title>\n<meta name=\"description\" content=\"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ECG Inspects Four Major System Upgrade Projects in Kumasi\" \/>\n<meta property=\"og:description\" content=\"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\" \/>\n<meta property=\"og:site_name\" content=\"Ghana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-28T11:44:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T12:08:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"ECG Inspects Four Major System Upgrade Projects in Kumasi\",\"datePublished\":\"2026-04-28T11:44:38+00:00\",\"dateModified\":\"2026-04-28T12:08:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\"},\"wordCount\":539,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg\",\"keywords\":[\"ghana\"],\"articleSection\":[\"all news\",\"Economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\",\"name\":\"ECG Inspects Four Major System Upgrade Projects in Kumasi - Ghana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg\",\"datePublished\":\"2026-04-28T11:44:38+00:00\",\"dateModified\":\"2026-04-28T12:08:48+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg\",\"width\":1280,\"height\":720,\"caption\":\"ECG Inspects Four Major System Upgrade Projects in Kumasi\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ghana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ECG Inspects Four Major System Upgrade Projects in Kumasi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/\",\"name\":\"Ghana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ECG Inspects Four Major System Upgrade Projects in Kumasi - Ghana","description":"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi","og_locale":"en_US","og_type":"article","og_title":"ECG Inspects Four Major System Upgrade Projects in Kumasi","og_description":"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...","og_url":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi","og_site_name":"Ghana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2026-04-28T11:44:38+00:00","article_modified_time":"2026-04-28T12:08:48+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"ECG Inspects Four Major System Upgrade Projects in Kumasi","datePublished":"2026-04-28T11:44:38+00:00","dateModified":"2026-04-28T12:08:48+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi"},"wordCount":539,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg","keywords":["ghana"],"articleSection":["all news","Economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi","url":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi","name":"ECG Inspects Four Major System Upgrade Projects in Kumasi - Ghana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg","datePublished":"2026-04-28T11:44:38+00:00","dateModified":"2026-04-28T12:08:48+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Mr. Kwame Kpekpena, the Acting Managing Director of the Electricity Company of Ghana (ECG), has visited four major sy ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#primaryimage","url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg","contentUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2026\/04\/sm_1777365369.148419.jpg","width":1280,"height":720,"caption":"ECG Inspects Four Major System Upgrade Projects in Kumasi"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/ecg-inspects-four-major-system-upgrade-projects-in-kumasi#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ghana\/"},{"@type":"ListItem","position":2,"name":"ECG Inspects Four Major System Upgrade Projects in Kumasi"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ghana\/#website","url":"https:\/\/www.africa-press.net\/ghana\/","name":"Ghana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/117636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/comments?post=117636"}],"version-history":[{"count":1,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/117636\/revisions"}],"predecessor-version":[{"id":117648,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/117636\/revisions\/117648"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media\/117634"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media?parent=117636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/categories?post=117636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/tags?post=117636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}