{"id":22042,"date":"2022-06-21T17:28:22","date_gmt":"2022-06-21T17:28:22","guid":{"rendered":"https:\/\/www.africa-press.net\/ghana\/uncategorized\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister"},"modified":"2022-06-21T17:44:17","modified_gmt":"2022-06-21T17:44:17","slug":"expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","title":{"rendered":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Ghana. <\/strong><\/span> Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water supply expansion works in the Yilo Krobo Constituency to curb the perennial water crisis. She said the expansion works would connect Huhunya to Boti, Agogo, Opesika, Sutapon, Akpo, Akpamu and the surrounding communities.<\/p>\n<p>&#8220;Mr Speaker, although the project suffered a major setback when some aggrieved residents burnt and destroyed the pipelines within the constituency, the Ghana Water Company Limited has expedited action in replacing the damaged pipelines,&#8221; Madam Dapaah said on the floor of Parliament.<\/p>\n<p>Madam Dapaah said this in response to a question posed by Mr Albert Tetteh Nyakotey, Member of Parliament for Yilo Krobo, on what measures the ministry was putting in place to curb the perennial water crisis in the Yilo Krobo Constituency.<\/p>\n<p>She further told the House that as part of measures to solve the perennial water crisis, the Ghana Water Company Limited (GWCL) had laid 3.7km of 110 HDPE pipelines and 8km of 160mm HDPE pipelines as a distribution line to serve the listed communities.<\/p>\n<p>The sector minister also noted that interconnections were also underway on the existing transmission mains serving Koforidua from the Booster Station at the Kwasidiaka.<\/p>\n<p>&#8220;Mr Speaker, it is expected that work will be completed by the second quarter of the year, 2023,&#8221; she told Parliament.<\/p>\n<p>&#8220;Mr Speaker, when all these interventions are completed, the Yilo Krobo Municipality will see a marked improvement in water supply,&#8221; she said.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/ghana\">Ghana<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Ghana. Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water supply expansion works in the Yilo Krobo Constituency to curb the perennial water crisis. She said the expansion works would connect Huhunya to Boti, Agogo, Opesika, Sutapon, Akpo, Akpamu and the surrounding communities. &#8220;Mr Speaker, [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":22041,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,8,12],"tags":[9288,5092,5096,7514,429],"class_list":["post-22042","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-homepage-english","category-policy","tag-2023-minister","tag-africa-press","tag-africa-press-ghana","tag-expansion","tag-ghana"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister - Ghana<\/title>\n<meta name=\"description\" content=\"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister\" \/>\n<meta property=\"og:description\" content=\"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\" \/>\n<meta property=\"og:site_name\" content=\"Ghana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-21T17:28:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-21T17:44:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister\",\"datePublished\":\"2022-06-21T17:28:22+00:00\",\"dateModified\":\"2022-06-21T17:44:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\"},\"wordCount\":268,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg\",\"keywords\":[\"2023\u2014Minister\",\"Africa Press\",\"Africa Press-Ghana\",\"expansion\",\"ghana\"],\"articleSection\":[\"all news\",\"homepage-english\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\",\"name\":\"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister - Ghana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg\",\"datePublished\":\"2022-06-21T17:28:22+00:00\",\"dateModified\":\"2022-06-21T17:44:17+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg\",\"width\":720,\"height\":480,\"caption\":\"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ghana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/\",\"name\":\"Ghana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister - Ghana","description":"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","og_locale":"en_US","og_type":"article","og_title":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister","og_description":"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...","og_url":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","og_site_name":"Ghana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-06-21T17:28:22+00:00","article_modified_time":"2022-06-21T17:44:17+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister","datePublished":"2022-06-21T17:28:22+00:00","dateModified":"2022-06-21T17:44:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister"},"wordCount":268,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg","keywords":["2023\u2014Minister","Africa Press","Africa Press-Ghana","expansion","ghana"],"articleSection":["all news","homepage-english","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","url":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister","name":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister - Ghana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg","datePublished":"2022-06-21T17:28:22+00:00","dateModified":"2022-06-21T17:44:17+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Madam Cecilia Dapaah, Minister for Sanitation and Water Resources says Ghana Water Company Limited is undertaking water ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#primaryimage","url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg","contentUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2022\/06\/img-62b20354b442b.jpg","width":720,"height":480,"caption":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/expansion-works-on-yilo-krobo-water-supply-to-be-completed-in-second-quarter-of-2023-minister#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ghana\/"},{"@type":"ListItem","position":2,"name":"Expansion works on Yilo-Krobo water supply to be completed in second quarter of 2023\u2014Minister"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ghana\/#website","url":"https:\/\/www.africa-press.net\/ghana\/","name":"Ghana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/22042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/comments?post=22042"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/22042\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media\/22041"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media?parent=22042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/categories?post=22042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/tags?post=22042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}