{"id":3901,"date":"2019-09-28T13:55:09","date_gmt":"2019-09-28T13:55:09","guid":{"rendered":"https:\/\/www.africa-press.com\/ghana\/?p=3901"},"modified":"2019-09-28T13:55:09","modified_gmt":"2019-09-28T13:55:09","slug":"wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","title":{"rendered":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses"},"content":{"rendered":"<p><strong>The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.<\/strong><\/p>\n<p>The portion of the road that had been washed away was posing problems for motorist and road users but since the minister&#8217;s directive, the\u00a0 Regional Highway Authority have moved swiftly to repair the debilitating portions of the road.<\/p>\n<p>It has paved way for free traffic flow on that portion of the Wa-Tumu Bolga road with road users happy about the swift efforts in addressing the problem.<\/p>\n<p>Speaking about the issue in an interview with Citi News, the Director of Ghana Highway Authority for the Upper West, Nicholas D Brown outlined what went into the repairs and steps needed to be taken to avert such trouble whenever there is heavy downpour.<\/p>\n<p>&#8220;By the grace of God we were able to fix the road and as I speak now we don&#8217;t have any problem there.We have raised the road enough that in case there is any other downpour we can maintain the dam.&#8221;<\/p>\n<p>&#8220;In fact the contractor as well as the community they need the dam seriously so we are protecting the dam.&#8221;<\/p>\n<p>&#8220;Going forward the contractor will provide a spew way and culverts just close to the end of the dam so that any time the rains come it will\u00a0 be able to take the excess water away&#8221; he disclosed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District [&hellip;]<\/p>\n","protected":false},"author":66,"featured_media":3902,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[2598,2599,2597],"class_list":["post-3901","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-fix","tag-mr-kwasi-amoako-attah","tag-wa-tumu-bolga-road"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses - Ghana<\/title>\n<meta name=\"description\" content=\"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses\" \/>\n<meta property=\"og:description\" content=\"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\" \/>\n<meta property=\"og:site_name\" content=\"Ghana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-28T13:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"610\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"francis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"francis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\"},\"author\":{\"name\":\"francis\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca\"},\"headline\":\"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses\",\"datePublished\":\"2019-09-28T13:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\"},\"wordCount\":282,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg\",\"keywords\":[\"fix\",\"Mr Kwasi Amoako Attah\",\"Wa-Tumu Bolga road\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\",\"name\":\"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses - Ghana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg\",\"datePublished\":\"2019-09-28T13:55:09+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca\"},\"description\":\"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg\",\"width\":610,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ghana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/\",\"name\":\"Ghana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca\",\"name\":\"francis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5825247c72c50a92c8cca0f4e845964479ca0e217d1e4efbfa9286794b27e7b7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5825247c72c50a92c8cca0f4e845964479ca0e217d1e4efbfa9286794b27e7b7?s=96&d=mm&r=g\",\"caption\":\"francis\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses - Ghana","description":"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","og_locale":"en_US","og_type":"article","og_title":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses","og_description":"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.","og_url":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","og_site_name":"Ghana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2019-09-28T13:55:09+00:00","og_image":[{"width":610,"height":400,"url":"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg","type":"image\/jpeg"}],"author":"francis","twitter_card":"summary_large_image","twitter_misc":{"Written by":"francis","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses"},"author":{"name":"francis","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca"},"headline":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses","datePublished":"2019-09-28T13:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses"},"wordCount":282,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg","keywords":["fix","Mr Kwasi Amoako Attah","Wa-Tumu Bolga road"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","url":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses","name":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses - Ghana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg","datePublished":"2019-09-28T13:55:09+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca"},"description":"The Upper West Regional directorate of the Ghana Highway Authority have met a 48 hour deadline that was given by the Minister for Roads and Highways, Mr Kwasi Amoako Attah to fix the deplorable portion of the Wa-Tumu Bolga road that was swept away by a heavy downpour in Demajan in the Sissala East District of the Upper East Region.","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#primaryimage","url":"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg","contentUrl":"https:\/\/static.africa-press.net\/ghana\/2019\/09\/wa-tumu-bolga-610x400.jpg","width":610,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/wa-tumu-bolga-road-fixed-before-48hr-ultimatum-from-roads-minister-elapses#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ghana\/"},{"@type":"ListItem","position":2,"name":"Wa-Tumu Bolga road fixed before 48hr ultimatum from Roads Minister elapses"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ghana\/#website","url":"https:\/\/www.africa-press.net\/ghana\/","name":"Ghana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/3687592f7713dc6c826cf5bbd0e55bca","name":"francis","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5825247c72c50a92c8cca0f4e845964479ca0e217d1e4efbfa9286794b27e7b7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5825247c72c50a92c8cca0f4e845964479ca0e217d1e4efbfa9286794b27e7b7?s=96&d=mm&r=g","caption":"francis"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/3901","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/comments?post=3901"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/3901\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media\/3902"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media?parent=3901"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/categories?post=3901"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/tags?post=3901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}