{"id":70669,"date":"2024-04-11T13:55:10","date_gmt":"2024-04-11T13:55:10","guid":{"rendered":"https:\/\/www.africa-press.net\/ghana\/uncategorized\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor"},"modified":"2024-04-11T14:27:33","modified_gmt":"2024-04-11T14:27:33","slug":"earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","title":{"rendered":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Ghana. <\/strong><\/span><b>Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners in the construction of civil engineering infrastructure, Dr Justice Amoh, has announced that earthworks on the Takoradi PTC Roundabout to Agona Nkwanta Road rehabilitation project should commence next month.<\/b><\/p>\n<p>Already, engineers have spent the past three months on the field, picking and building the data \u2013 including the right and approved laterite and the quarry materials \u2013 to aid in the construction.<\/p>\n<p>\u201cWe have the survey instruments and other instruments which are not earth moving machines,\u201d Dr Amoah said.<\/p>\n<p>\u201cWe also have the laboratory team taking samples and conducting soil testing and other critical preparatory works. And if you go to our site camp, you will see that it is forming up.<\/p>\n<p>\u201cIf you want to see a grader, an excavator, or a bulldozer moving or working, it will be very soon. Within one month, I\u2019m sure we will start with the clearing, and after the clearing, the concrete works will start, the earthworks will follow then, you will see the black top, which is the asphalt works&#8230;\u201d<\/p>\n<p>He told journalists, \u201cThe length is 23 kilometres and is a dual carriage road rehabilitation project. We have four major bridges that will be reconstructed. Initially, only the Apremdo and the Ewusiejoe bridges were to be reconstructed, but because it will be a dual carriage road project, two additional ones have been added. I must also add that there are other smaller bridges included in the project. They will all be concrete bridges.\u201d<\/p>\n<p>Justmoh Construction has taken on many projects of high importance both in and out of the country, leaving behind a stellar footprint and Dr Amoh assured the Takoradi PTC to Agona Nkwanta road rehabilitation project will not be any different.<\/p>\n<p>\u201cWe appreciate the enormity of the task. This is an international road and its significance cannot be underestimated. On our part, we pledge to work assiduously and as much as practicable to the exact engineering specifications.<\/p>\n<p>\u201cOther elements including, encroachment, compensation and other human activities that could stand in the way, are being discussed so that, as much as possible, it will be a win-win situation for all parties involved. And we are committed to seeing to its logical conclusion. We will do our utmost best and we will also pray for a cordial relationship with residents of communities that the road traverses.\u201d<\/p>\n<p>Visible scar<\/p>\n<p>The Takoradi PTC to Agona Nkwanta Road connects to Ivory Coast and Tarkwa, Ghana\u2019s most profitable gold mining enclave.<\/p>\n<p>On each side, particularly the Ahanta West Municipal end, the road is adorned with high-value oil and gas servicing companies including Wayoe Construction, Monpe, the over $20 million, state-of-the-art, Mantrac Component Rebuild Center, top-of-the-range centre and first of its kind, and Harlequin International Ghana\u2019s 23 million dollar fabrication, hydraulic and engineering facility and a host of other companies of international repute.<\/p>\n<p>A new hospital for the Western Region has earned a spot along the road.<\/p>\n<p>Despite its enormous economic significance, the 23-kilometre road lies heavily battered from years of neglect and has been starved of the needed care and maintenance.<\/p>\n<p>Ruts, some measuring several metres, and puddles with unknown depths have become common features on the road. Consequently, not a month will pass without the news of unbearable vehicular traffic resulting from a vehicle breakdown.<\/p>\n<p>Recent travel memories have become drudgery and one quickly forgotten, and social media sensation Wode Maya recently had course to complain that \u201cit\u2019s a travesty to have such a road in the Western Region, considering what the region gives the country, Sekondi Takoradi deserves better\u201d when he travelled on the stretch to his \u201chumble Ahenkofikrom\u201d to reconnect with his mother.<\/p>\n<p>Muffled reactions<\/p>\n<p>Reports of rehabilitation works are being received with cautious optimism, especially as this year is an election season.<\/p>\n<p>Innocent Amuzu works with one of the mining companies in Tarkwa and was journeying on the road every day until recently when he stopped.<\/p>\n<p>\u201cI drive a four-wheeler pickup. So, it was convenient for me to travel every day from Takoradi to work, also because it was fun. Now, I cannot afford to do that anymore. The road has become bad and dangerous to travel on. I have heard several announcements about rehabilitation. Well, I do hope that finally it will happen. We deserve it.\u201d<\/p>\n<p>Efo Mawu is a commercial driver and has been driving the stretch for the past ten years.<\/p>\n<p>He had just bought a new shock absorber \u2013 the third one this year alone \u2013 and was seething with rage when he responded to a question on the news of rehabilitation works.<\/p>\n<p>\u201cWhat do you want me to say? This is a new absorber that I just bought,\u201d he pointed out to us, \u201cand there is every indication that I will have to buy a new one why,\u201d and, berated the government for not \u201callowing us to increase fares\u201d and said \u201csoon we will have to increase fares unilaterally to save our only source of livelihood\u201d.<\/p>\n<p>Efo Mawu has heard of Justmoh Construction and says of him: \u201cI know Justmoh. I also know he has done some roads in the Western Region and I don\u2019t want to believe that what I\u2019m hearing is a ploy to get us to vote. So, I\u2019m watching with bated breath. Next month will surely come and we will see.\u201d<\/p>\n<p>The Takoradi PTC Roundabout to Agona Nkwanta Road Rehabilitation Project is being funded by the Ghana Commercial Bank and works will span over 24 months.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/ghana\">Ghana<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Ghana. Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners in the construction of civil engineering infrastructure, Dr Justice Amoh, has announced that earthworks on the Takoradi PTC Roundabout to Agona Nkwanta Road rehabilitation project should commence next month. Already, engineers have spent the past three [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":70668,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[5092,5096,429],"class_list":["post-70669","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-ghana","tag-ghana"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor - Ghana<\/title>\n<meta name=\"description\" content=\"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor\" \/>\n<meta property=\"og:description\" content=\"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\" \/>\n<meta property=\"og:site_name\" content=\"Ghana\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-11T13:55:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-11T14:27:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"408\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor\",\"datePublished\":\"2024-04-11T13:55:10+00:00\",\"dateModified\":\"2024-04-11T14:27:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\"},\"wordCount\":942,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Ghana\",\"ghana\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\",\"name\":\"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor - Ghana\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg\",\"datePublished\":\"2024-04-11T13:55:10+00:00\",\"dateModified\":\"2024-04-11T14:27:33+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg\",\"width\":720,\"height\":408,\"caption\":\"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/ghana\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#website\",\"url\":\"https:\/\/www.africa-press.net\/ghana\/\",\"name\":\"Ghana\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor - Ghana","description":"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","og_locale":"en_US","og_type":"article","og_title":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor","og_description":"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...","og_url":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","og_site_name":"Ghana","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-04-11T13:55:10+00:00","article_modified_time":"2024-04-11T14:27:33+00:00","og_image":[{"width":720,"height":408,"url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor","datePublished":"2024-04-11T13:55:10+00:00","dateModified":"2024-04-11T14:27:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor"},"wordCount":942,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg","keywords":["Africa Press","Africa Press-Ghana","ghana"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","url":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor","name":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor - Ghana","isPartOf":{"@id":"https:\/\/www.africa-press.net\/ghana\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg","datePublished":"2024-04-11T13:55:10+00:00","dateModified":"2024-04-11T14:27:33+00:00","author":{"@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Chief Executive Officer of Justmoh Construction, a wholly Ghanaian-owned private company and one of the forerunners i ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#primaryimage","url":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg","contentUrl":"https:\/\/static.africa-press.net\/ghana\/sites\/18\/2024\/04\/sm_1712832830.507104.jpg","width":720,"height":408,"caption":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/ghana\/all-news\/earth-works-on-takoradi-to-agona-nkwanta-road-begin-next-month-contractor#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/ghana\/"},{"@type":"ListItem","position":2,"name":"Earth works on Takoradi to Agona Nkwanta Road begin next month \u2013 Contractor"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/ghana\/#website","url":"https:\/\/www.africa-press.net\/ghana\/","name":"Ghana","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/ghana\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/ghana\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/70669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/comments?post=70669"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/posts\/70669\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media\/70668"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/media?parent=70669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/categories?post=70669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/ghana\/wp-json\/wp\/v2\/tags?post=70669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}