{"id":104631,"date":"2023-10-10T18:54:29","date_gmt":"2023-10-10T18:54:29","guid":{"rendered":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up"},"modified":"2023-10-10T19:55:45","modified_gmt":"2023-10-10T19:55:45","slug":"kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","title":{"rendered":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Kenya. <\/strong><\/span>KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aimed at increasing its generation capacity from 2MW to 8.6 MW.<\/p>\n<p>The electricity generating company had announced plans to rehabilitate the plant in Western Kenya as one way of stabilising electricity supply and minimising power outages in the region.<\/p>\n<p>This is coming at a time when KenGen plans to generate an extra 3,000MW into the national grid, over the next ten years.<\/p>\n<p>According to the electricity producer, the objective of the project is to redevelop the 64-year old hydropower plant thus increasing the plant&#8217;s capacity and efficiency, by utilising the good inflows from river Kuja and modernising the power plant.<\/p>\n<p>\u201cThe project will improve the efficiency of the plant, optimally utilise the inflows of the river and achieve a higher output, thereby improving the power situation in the region,\u201d KenGen said in a statement.<\/p>\n<p>In September 2021, the European Union through the National Treasury and the Ministry of Energy provided a grant of EUR 700,000 (Sh110.5 million) to KenGen for Gogo hydropower plant&#8217;s redevelopment feasibility study.<\/p>\n<p>The redevelopment will include the construction of a new powerhouse equipped with two vertical turbine generators, transformers, and the associated equipment.<\/p>\n<p>KenGen will also add a new 66\/33kV substation and a dedicated 33kV double circuit power evacuation line, 29.9km from the new powerhouse to the Awendo sub-station.<\/p>\n<p>\u201cThe generated electricity from the plant is evacuated via an unstable 33kV distribution line to 132\/33kV Awendo substation. The plant also experiences frequent breakdowns mainly due to aging,\u201d reads the feasibility study that recommended redevelopment of Gogo hydropower plant.<\/p>\n<p>The 2MW Gogo hydropower plant was commissioned in 1958.<\/p>\n<p>KenGen said the plant has outlived its economic life, and the current equipment (turbine and generators) were built using old technologies and it has become difficult to find spare parts of such.<\/p>\n<p>\u201cLack of availability of the spare parts usually translates to long downtime of the units during repair and, or maintenance,\u201d reads part of the study.<\/p>\n<p>The specific objective of the study was to assess the technical, financial, economic, environmental, and social viability of redeveloping Gogo power plant, to achieve a higher output by utilising the available discharge and optimising the equipment and structures.<\/p>\n<p>The study recommended redevelopment of Gogo hydropower plant to provide a peaking capacity of 8.6MW and to improve the plant&#8217;s availability.<\/p>\n<p>KenGen\u2019s 3,000 MW plan will be driven largely by deploying up to 2,000MW drawn from geothermal and hydro sources as baseload power, to stabilise the country\u2019s energy sources.<\/p>\n<p>The agency will be looking to tap into the vast potential of geothermal energy in the Rift Valley region, which is estimated to be about 10,000MW of clean and renewable energy.<\/p>\n<p>The increasing adoption of e-mobility in the country has piled pressure for more power generation.<\/p>\n<p>\u201cGoing forward, we will be seeking to enlist new drilling fields for geothermal after successful drilling expeditions in the existing fields,&#8221; management said.<\/p>\n<p>The acquisition of new fields will be one of the major initiatives for the company, as it seeks to take advantage of the 10GW geothermal potential in the country.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/kenya\">Kenya<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Kenya. KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aimed at increasing its generation capacity from 2MW to 8.6 MW. The electricity generating company had announced plans to rehabilitate the plant in Western Kenya as one way of stabilising electricity supply and minimising [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":104630,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[6857,7003,544],"class_list":["post-104631","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-kenya","tag-kenya"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KenGen gets Cabinet nod on Gogo hydropower plant scale-up - kenya<\/title>\n<meta name=\"description\" content=\"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KenGen gets Cabinet nod on Gogo hydropower plant scale-up\" \/>\n<meta property=\"og:description\" content=\"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\" \/>\n<meta property=\"og:site_name\" content=\"kenya\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-10T18:54:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-10T19:55:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1858\" \/>\n\t<meta property=\"og:image:height\" content=\"1102\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"KenGen gets Cabinet nod on Gogo hydropower plant scale-up\",\"datePublished\":\"2023-10-10T18:54:29+00:00\",\"dateModified\":\"2023-10-10T19:55:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\"},\"wordCount\":543,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Kenya\",\"Kenya\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\",\"name\":\"KenGen gets Cabinet nod on Gogo hydropower plant scale-up - kenya\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg\",\"datePublished\":\"2023-10-10T18:54:29+00:00\",\"dateModified\":\"2023-10-10T19:55:45+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg\",\"width\":1858,\"height\":1102,\"caption\":\"KenGen gets Cabinet nod on Gogo hydropower plant scale-up\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/kenya\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KenGen gets Cabinet nod on Gogo hydropower plant scale-up\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/\",\"name\":\"kenya\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up - kenya","description":"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","og_locale":"en_US","og_type":"article","og_title":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up","og_description":"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...","og_url":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","og_site_name":"kenya","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-10-10T18:54:29+00:00","article_modified_time":"2023-10-10T19:55:45+00:00","og_image":[{"width":1858,"height":1102,"url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up","datePublished":"2023-10-10T18:54:29+00:00","dateModified":"2023-10-10T19:55:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up"},"wordCount":543,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg","keywords":["Africa Press","Africa Press-Kenya","Kenya"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","url":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up","name":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up - kenya","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg","datePublished":"2023-10-10T18:54:29+00:00","dateModified":"2023-10-10T19:55:45+00:00","author":{"@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"KenGen has received Cabinet\u2019s nod to scale up the production capacity of Gogo hydropower project in a re-development aim ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#primaryimage","url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg","contentUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2023\/10\/sm_1696955062.444411.jpg","width":1858,"height":1102,"caption":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/kengen-gets-cabinet-nod-on-gogo-hydropower-plant-scale-up#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/kenya\/"},{"@type":"ListItem","position":2,"name":"KenGen gets Cabinet nod on Gogo hydropower plant scale-up"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/kenya\/#website","url":"https:\/\/www.africa-press.net\/kenya\/","name":"kenya","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/104631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/comments?post=104631"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/104631\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media\/104630"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media?parent=104631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/categories?post=104631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/tags?post=104631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}