{"id":11929,"date":"2020-07-28T19:05:03","date_gmt":"2020-07-28T19:05:03","guid":{"rendered":"https:\/\/www.africa-press.com\/kenya\/?p=11929"},"modified":"2020-07-28T19:05:03","modified_gmt":"2020-07-28T19:05:03","slug":"state-plans-480km-northern-link-road","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road","title":{"rendered":"State plans 480km northern link road"},"content":{"rendered":"<p><strong>AfricaPress-Kenya:<\/strong> The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.<\/p>\n<p>The road will form part of the Lamu Port, South Sudan Ethiopia Transport (Lapsset) Corridor.\u00a0The\u00a0link road that is\u00a0expected to traverse the counties of Turkana, Samburu, Isiolo and parts of Meru will play\u00a0a major part in opening up the northern region.\u00a0It will also increase the options that South Sudan and Ethiopia have by easing access to Lamu Port.<\/p>\n<p>The Kenya National Highways Authority (KeNHA) said much of the work will entail upgrading of existing roads along the route and\u00a0simplifying the construction works that need to be undertaken.<\/p>\n<p>While this section of the Lappset corridor stretches between Isiolo and Lokichar, it is expected that the road will terminate in Juba, South Sudan, with\u00a0another section\u00a0terminating in Addis Ababa, through Isiolo and Moyale.<\/p>\n<p>\u201cThe Isiolo-Lokichar road project forms part of the infrastructure component of the Lapsset Corridor,\u201d said KeNHA in an Environmental and Social Impact Assessment lodged with the National Environmental Management Authority as it seeks approvals from Nema.<\/p>\n<p>\u201cThe route for this (Isiolo-Lokichar) road section will mostly follow the existing road and hence it will pose minimal implementation challenges.\u00a0 However, there are sections of the road with deep\u00a0\u00a0 escarpments, for example, towards Surgut Valley, where design challenges will be expected.\u201d\u00a0It said\u00a0the road will\u00a0be built along\u00a0the proposed crude oil pipeline.<\/p>\n<p>KeNHA noted that the road entailed upgrading current road network so as to avoid major disruptions for trading centres.\u00a0From Isiolo, the road will pass through the towns of Lareta, Wamba, and\u00a0Kisima.<\/p>\n<p>It will then head to Maralal and Baragoi Lokori, and finally to Lokichar.\u00a0Of\u00a048km, 282km will be newly designed road.\u00a0The details of the road come even as the government and the joint venture partners in the Project Oil Kenya plan to build the crude oil pipeline. The over 800km pipeline is expected to cost Sh100 billion. The corridor is expected to have a railway.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AfricaPress-Kenya: The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline. The road will form part of the Lamu Port, South Sudan Ethiopia Transport (Lapsset) Corridor.\u00a0The\u00a0link road that is\u00a0expected to traverse the counties of Turkana, Samburu, Isiolo and parts of Meru will play\u00a0a [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":11925,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[4919,3788],"class_list":["post-11929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-ngamia-8","tag-turkana-county"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>State plans 480km northern link road - kenya<\/title>\n<meta name=\"description\" content=\"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"State plans 480km northern link road\" \/>\n<meta property=\"og:description\" content=\"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\" \/>\n<meta property=\"og:site_name\" content=\"kenya\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-28T19:05:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"State plans 480km northern link road\",\"datePublished\":\"2020-07-28T19:05:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\"},\"wordCount\":345,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg\",\"keywords\":[\"Ngamia 8\",\"Turkana County\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\",\"name\":\"State plans 480km northern link road - kenya\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg\",\"datePublished\":\"2020-07-28T19:05:03+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg\",\"width\":800,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/kenya\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"State plans 480km northern link road\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/\",\"name\":\"kenya\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"State plans 480km northern link road - kenya","description":"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road","og_locale":"en_US","og_type":"article","og_title":"State plans 480km northern link road","og_description":"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form","og_url":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road","og_site_name":"kenya","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2020-07-28T19:05:03+00:00","og_image":[{"width":800,"height":500,"url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"State plans 480km northern link road","datePublished":"2020-07-28T19:05:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road"},"wordCount":345,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg","keywords":["Ngamia 8","Turkana County"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road","url":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road","name":"State plans 480km northern link road - kenya","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg","datePublished":"2020-07-28T19:05:03+00:00","author":{"@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The government plans to build a 483 kilometre road between Isiolo and Lokichar, which will run alongside the planned crude oil pipeline.\u00a0The road will form","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#primaryimage","url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg","contentUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2020\/07\/state_plans_480km_no5f1f0f7b78cba.jpg","width":800,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/kenya\/economy\/state-plans-480km-northern-link-road#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/kenya\/"},{"@type":"ListItem","position":2,"name":"State plans 480km northern link road"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/kenya\/#website","url":"https:\/\/www.africa-press.net\/kenya\/","name":"kenya","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/11929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/comments?post=11929"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/11929\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media\/11925"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media?parent=11929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/categories?post=11929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/tags?post=11929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}