{"id":30934,"date":"2021-07-06T15:46:25","date_gmt":"2021-07-06T15:46:25","guid":{"rendered":"https:\/\/www.africa-press.net\/kenya\/?p=30934"},"modified":"2021-07-06T14:39:38","modified_gmt":"2021-07-06T14:39:38","slug":"revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","title":{"rendered":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/kenya\">Kenya<\/a>. <\/strong><\/span>The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite the state&#8217;s effort to rehabilitate the 177 Km line.<\/p>\n<p>According to a report by Nation, it has emerged that the technical factors and design are a major hindrance to the rail&#8217;s operations.<\/p>\n<p>This incorporates the use of old technology used in the 1930s hence hampering the types of locomotives that can ride on it as well as their capacity.<\/p>\n<p>\u201cThe rails are narrower and support less load because it has lower poundage,&#8221; a KR employee intimated.<\/p>\n<p>Further, the staffer pointed out that the technology has hampered operations along the line. For instance, the Nanyuki train can only ferry three tank wagons of petroleum in a week, whereby one trip takes between five to seven hours.<\/p>\n<p>This is also hindered by the geographical location whereby the train at times has to detach a few wagons at Sagana in order to reduce the load.<\/p>\n<p>A metre-gauge line can only allow a load of 47kg per metre of rail as compared to the Standard Gauge railway line which allows loads of 60kg per metre.<\/p>\n<p>&#8220;Too much load will break the line, especially along the Thika-Nanyuki stretch. This means that we have to reduce the load at the Thika station and Sagana,&#8221; the employee stated.<\/p>\n<p>The Nanyuki train has been experiencing setbacks in the recent past. This has seen the train stall four times and also catch fire in under six months.<\/p>\n<p>The problems associated with the line have caused the likelihood of attracting more passengers to become bleak.<\/p>\n<p>Further, the corporation recently introduced the transport of livestock to and fro the route in a bid to expand its customer base. However, the service is yet to attract customers as only one shipment has been ferried thus far.<\/p>\n<p>The rehabilitation of the metre gauge line is part of the government&#8217;s project to provide alternative sources of transport for passengers other than the normal road transport.<\/p>\n<p>This has forced the state to pour billions into rail transport in a bid to revamp the sector as well as improve the transport services within the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Kenya. The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite the state&#8217;s effort to rehabilitate the 177 Km line. According to a report by Nation, it has emerged that the technical factors and design are a major hindrance to the rail&#8217;s operations. This incorporates [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":30933,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8,16],"tags":[6857,7003,544],"class_list":["post-30934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","category-twitter","tag-africa-press","tag-africa-press-kenya","tag-kenya"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds - kenya<\/title>\n<meta name=\"description\" content=\"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds\" \/>\n<meta property=\"og:description\" content=\"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\" \/>\n<meta property=\"og:site_name\" content=\"kenya\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-06T15:46:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"360\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds\",\"datePublished\":\"2021-07-06T15:46:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\"},\"wordCount\":370,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Kenya\",\"Kenya\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\",\"name\":\"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds - kenya\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg\",\"datePublished\":\"2021-07-06T15:46:25+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg\",\"width\":720,\"height\":360,\"caption\":\"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/kenya\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#website\",\"url\":\"https:\/\/www.africa-press.net\/kenya\/\",\"name\":\"kenya\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds - kenya","description":"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","og_locale":"en_US","og_type":"article","og_title":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds","og_description":"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...","og_url":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","og_site_name":"kenya","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-07-06T15:46:25+00:00","og_image":[{"width":720,"height":360,"url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds","datePublished":"2021-07-06T15:46:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds"},"wordCount":370,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg","keywords":["Africa Press","Africa Press-Kenya","Kenya"],"articleSection":["all news","economy","homepage-english","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","url":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds","name":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds - kenya","isPartOf":{"@id":"https:\/\/www.africa-press.net\/kenya\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg","datePublished":"2021-07-06T15:46:25+00:00","author":{"@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The revival of the Ksh3 billion Nairobi-Nanyuki metre-gauge railway line project by the government is in limbo despite t ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#primaryimage","url":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg","contentUrl":"https:\/\/static.africa-press.net\/kenya\/sites\/28\/2021\/07\/img-60e46b124e292.jpg","width":720,"height":360,"caption":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/kenya\/all-news\/revival-of-ksh-3b-nairobi-nanyuki-railway-faces-headwinds#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/kenya\/"},{"@type":"ListItem","position":2,"name":"Revival of Ksh 3B Nairobi-Nanyuki Railway Faces Headwinds"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/kenya\/#website","url":"https:\/\/www.africa-press.net\/kenya\/","name":"kenya","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/kenya\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/kenya\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/30934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/comments?post=30934"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/posts\/30934\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media\/30933"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/media?parent=30934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/categories?post=30934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/kenya\/wp-json\/wp\/v2\/tags?post=30934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}