{"id":20214,"date":"2022-10-05T09:31:28","date_gmt":"2022-10-05T09:31:28","guid":{"rendered":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2"},"modified":"2022-10-05T09:45:40","modified_gmt":"2022-10-05T09:45:40","slug":"gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","title":{"rendered":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Lesotho. <\/strong><\/span>A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy project, slashed electricity prices and created thousands of jobs has vanished from the country\u2019s planned projects, leaving behind unanswered questions and politicians who don\u2019t remember the details.<\/p>\n<p>The project was designed to increase the local energy production from 73MW to 6 073MW, and would have meant the southern African country could stop importing expensive electricity from South Africa and Mozambique.<\/p>\n<p><a name=\"advads-04e86eef8c03be6101c8baf2d8c37889\"><\/a>All traces of the project, which was conceived by the South African firm Harrison &amp; White Investments and intended to be constructed in Mokhotlong district, have vanished.<\/p>\n<p>Politicians do not seem to have any explanation for this, or any knowledge that the government had a stake in the company earmarked for its construction.<\/p>\n<p>In 2011, Harrison &amp; White Investments announced its collaboration with the Lesotho government on the $15-billion (then R110-billion) wind farm project, which would have been one of the largest of its kind in the world, according to IOL News.<\/p>\n<p>Construction was to be undertaken by Breeze Power, a little-known consortium in Lesotho reportedly made up of 25% shares held by the Lesotho government and 75% by Harrison &amp; White, Chinese and other foreign investors.<\/p>\n<p><a name=\"advads-69732747a07c89c31540e45e1b797736\"><\/a>Reports at the time indicated the project would include 4 000 wind turbines in the highlands of the mountainous country.<\/p>\n<p>However, no one seems willing to own up to knowing about the government\u2019s alleged stake in Breeze Power \u2014 not even Monyane Moleleki, who was minister of natural resources at the time and was associated with Harris &amp; White\u2019s owners.<\/p>\n<p>\u201cIt is my first time hearing that the government had a stake in Breeze Power \u2026 I never committed the government to this project,\u201d Moleleki said in an interview.<\/p>\n<p>The project appears to have ground to a halt when Moleleki left the ministry and was succeeded by Timothy Thahane, who became minister of energy in 2012 following the division of the ministry of natural resources into two parts.<\/p>\n<p>Thahane now questions Breeze Power\u2019s credentials, saying they were being promoted by Moleleki. \u201cI only heard of Breeze Power and I know Moss [Leoka, the executive director] too, but when you look behind, there is no track record, no technical substance, just lies. They were fly-by-night and I could not waste my time with them,\u201d he said.<\/p>\n<p><a name=\"advads-a95a3514d580ee4bb31bfcca4ef69097\"><\/a>Leoka, the executive director of both Harrison &amp; White and Breeze Power, indicates that Moleleki\u2019s role in the project was bigger than he is admitting.<\/p>\n<p>\u201cHarrison &amp; White and the government had signed a Memorandum of Agreement [MoA]. Minister Moleleki had signed the MoA on behalf of the government. The signing of the MoA followed the project\u2019s approval by the cabinet,\u201d Leoka said in response to questions.<\/p>\n<p>Although he could not share a copy of the MoA, Leoka said Breeze Power\u2019s shareholders were \u201cHarrison &amp; White Investments with 90% shareholding and the government of Lesotho with 10% shareholding.<\/p>\n<p>The government had the option to acquire a further 15% stake in the project at a price to be mutually agreed on by the shareholders. \u201d Presented with these contradictions, Moleleki responded: \u201cWe might have had an MoA, but it\u2019s not a contract.<\/p>\n<p>We are talking about things that happened 12 years ago and I can\u2019t remember them. \u201d Breeze Power was reported in 2011 to have signed an agreement with a Chinese technology partner, Ming Yang Wind Power, for the manufacture of wind turbine components to be made in factories in South Africa and Lesotho.<\/p>\n<p><a name=\"advads-1f87085abde7e65763751cd255d8e757\"><\/a>\u201cWe had chosen Ming Yang to be our partners due to their experience in developing wind power projects in the high mountains of north western China,\u201d Leoka \u201cWe took two representatives from the Lesotho ministry of energy with us on a site visit to one of their projects high up the mountains.<\/p>\n<p>Sadly, a few months later they pulled out of the project. \u201d The Lesotho companies\u2019 register records that Moya Eco Power, a South African firm, is the sole owner of Breeze Power.<\/p>\n<p>The register indicates Breeze Power was incorporated in Lesotho in July 2010, with its registered office listed as a room in one of the hotels in Maseru.<\/p>\n<p>Asked to explain the discrepancy between the information on the MoA and that on Breeze Power\u2019s registration records, Leoka said after new companies are registered it is not uncommon for some details to be changed later.<\/p>\n<p>\u201c[For] example, when Breeze Power was registered, we had not yet appointed a board of directors, so a few names had to be used so that the company could be registered.<\/p>\n<p>\u201d Moleleki admits having had several meetings with Harrison &amp; White representatives, but denies ever committing the government to the project. In 2015 his party came back into power.<\/p>\n<p>The following year, a letter signed by Selibe Mochoboroane, who was the minister of energy at the time, was sent to R20 \u2013 Regions of Climate Action, a non-profit organisation that aims to bring together local authorities, technology providers and investors in their quest to promote renewable energy projects, introducing Breeze Power as the identified source of funding and also an engineering, procurement and construction contractor for this project.<\/p>\n<p>Now the minister of development planning, responsible for approving all government projects, Selibe Mochoboroane said that the wind farm project is no longer in the government pipeline.<\/p>\n<p>He said his signature on the letter to R20 might have been forged. Part of it reads: \u201cWe welcome R20\u2019s initiative to work alongside governments \u2026 in accelerating the emergence of low-carbon climate-resilient infrastructure projects.<\/p>\n<p>We hereby mandate R20 to explore opportunities for the development of such projects within the Kingdom of Lesotho, specifically \u2026 wind farming. \u201d Mochoboroane said the signature \u201clooks like mine.<\/p>\n<p>But one thing I am sure of is that I am not the one who wrote that letter, even if it was signed by myself. I am just so clueless about it. Maybe its proponents found a way to make me pass this letter on their behalf.<br \/>\nAt the time the project was being planned, Moleleki in his capacity as minister of natural resources hailed the initiative, saying it would help Lesotho achieve \u201cdeveloping country status\u201d.<\/p>\n<p>\u201cI was very enthusiastic about the project, so much so that I talked about it on the BBC,\u201d he said in an interview.<\/p>\n<p>He said South Africa has long supplied Lesotho with \u201cwhat is probably the cheapest energy, yet very polluting\u201d, and he had hoped to change that situation with this project by creating renewable green power and exporting it to South Africa.<\/p>\n<p>\u201cIt was an exciting, mouth-watering prospect,\u201d Moleleki added.<\/p>\n<p>Moleleki said during the interview that for almost a year he had met Leoka on several occasions as a minister: \u201cWe met in Gauteng. They came to Lesotho Sun [Hotel] and to my office.<\/p>\n<p>He was a tall, very articulate and convincing gentleman \u2026 he was a likeable fellow. \u201d However, he said he had no knowledge about Breeze Power\u2019s establishment despite his meetings with Leoka and vowed he had not committed the government to the consortium.<\/p>\n<p>\u201cBecause, at the end of the day, the ministry of development planning was the one responsible for its approval,\u201d he said.<\/p>\n<p>Lee-Ann Louverdis, a spokesperson for Breeze Power, told IOL News in 2011 the plan for Lesotho to build the world\u2019s largest renewable energy project would be made up of 80% Chinese debt and 20% equity.<\/p>\n<p>Lesotho would contribute $250-million and Harrison &amp; White would provide the balance, according to the report. Investigations show that Leoka is also a shareholder of Harrison &amp; White and he was at that time doubling as chief executive of Moya Eco Power in South Africa.<\/p>\n<p>While it\u2019s unclear what state Harrison &amp; White\u2019s finances were in at the time of the announcement, court records show that it started business rescue proceedings in 2013 and was finally liquidated in 2017.<\/p>\n<p>\u201cUp to the time that the project stopped, Harrison &amp; White had spent over R40-million of its own money on the project,\u201d Leoka said.<\/p>\n<p>\u201cBeyond its role as a shareholder and contributor of the land, the government did not have much role to play.<br \/>\nAccording to Moleleki, the topic of the project\u2019s funding was never discussed during his tenure, despite the fact that reports in which he was interviewed at the time stated that the project\u2019s main funding would be sourced from Chinese loans.<\/p>\n<p>The office of public debt management, responsible for all loans taken by the Lesotho government, is in the dark about these reported plans. \u201cI don\u2019t know anything about the wind farm project.<\/p>\n<p>Nothing has even been hinted at all,\u201d said the director of public debt management, Khotso Moleleki, who is related to Monyane Moleleki. He stressed that no government loan could be taken \u201cwithout our involvement\u201d.<\/p>\n<p>All of this transpired ahead of the 2012 national elections, which Moleleki\u2019s then-Democratic Congress party lost. Moleleki now says he can\u2019t remember his role in the meetings with Harris &amp; White representatives, which stretched over more than six months.<\/p>\n<p>He also denies the statements about his involvement made by Breeze Power: \u201cI was giving them moral support. I was excited about the project, but it fizzled away.<br \/>\nAfter the Democratic Congress regained control of the government in 2015, Breeze Power noted on the companies\u2019 register that it started business in March of that year doing electric power generation, transmission and distribution.<\/p>\n<p>It was under this administration that the letter with Mochoboroane\u2019s signature was written to the R20 secretariat introducing the wind farm project. The same year that Mochoboroane allegedly introduced Breeze Power as a source of funding for the project, Harrison &amp; White was already sinking in over R70-million debt and facing liquidation in South Africa.<\/p>\n<p>According to court papers, this debt was made up of R55,031.90 owed to Cranes Direct CC; R55,404,291.57 owed to Firstrand Bank Limited; R15,337,921.21 owed to the South African Revenue Services; and R81,491.84 owed to Teemane Cranes (Pty) Ltd.<\/p>\n<p>The liquidators\u2019 report, as presented to the Benoni Magistrate\u2019s Court on 21 February 2018, states that Harrison &amp; White\u2019s financial problems had started earlier and on 4 July 2013 the company started business rescue proceedings that were dependent on a substantial investment from an unnamed offshore investor that never materialised.<\/p>\n<p>\u201cWhat is clear is that the company [Harrison &amp; White] invested in a number of projects in an attempt to broaden its business operations. Most of these projects were unsuccessful and resulted in additional pressure on the company\u2019s cash resources,\u201d noted the report.<\/p>\n<p>According to Leoka, the project stalled when Harrison &amp; White Investments was liquidated as the project depended on the company to fund it until signing a power purchase agreement with Eskom for the import of electricity from Lesotho.<\/p>\n<p>\u201cThe unfortunate liquidation of Harrison &amp; White happened just before the project could reach financial closure.<\/p>\n<p>Financial institutions and investors are typically averse to funding projects at the upstream stage. They prefer to come in post feasibility,\u201d Leoka said.<\/p>\n<p>\u201cDeveloping a wind power project such as Breeze Power was a massive task, but it was not rocket science,\u201d he said.<\/p>\n<p>\u201cIn the past 10 years, more than a dozen wind power projects have been developed in South Africa by local companies, none of which had any experience in this field.<\/p>\n<p>They didn\u2019t need to have had any. They engaged engineering, procurement and construction contractors who had the requisite expertise to deliver their projects as going concerns.<br \/>\nLesotho\u2019s 72MW Muela Hydropower Plant has supplied only 60% of the country\u2019s energy needs over the years, necessitating imports of the remaining 40% from non-renewable, coal-fired sources in South Africa and Mozambique.<\/p>\n<p>The Lesotho Electricity Company says the landlocked country pays 10-times more to its neighbour than it pays for electricity from the local hydropower station, adding an additional cost for rural communities living on shoe-string budgets.<\/p>\n<p>South Africa\u2019s power utility Eskom was the intended recipient of power from the Lesotho wind project, according to reports at the time, although no agreement to purchase had been signed.<\/p>\n<p>The Global Data report indicates that the project was envisaged to operate on 4 000 wind turbines that would be constructed in multiple phases over 10 to 15 years.<\/p>\n<p>It was anticipated that the farm would generate 6 000MW of wind power before 2021. \u201cThe first phase includes a 150MW power plant, the second phase includes a 300MW power plant, and the third phase includes a 600MW power plant.<\/p>\n<p>Further phases of the project are not determined yet,\u201d notes the report. All this was just a pipedream as a recent visit to Mokhotlong revealed that the remote wind sensing masts, which Moleleki said were erected by Leoka\u2019s company, were no longer there, allegedly vandalised and stolen.<\/p>\n<p>The area principal chief, Qetho Sekonyela, said the residents knew only that the masts were used for wind energy testing, but he did not have further details as they were erected during the reign of his late father.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/lesotho\">Lesotho<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Lesotho. A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy project, slashed electricity prices and created thousands of jobs has vanished from the country\u2019s planned projects, leaving behind unanswered questions and politicians who don\u2019t remember the details. The project was designed to increase the local energy [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":20213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,6,7,8,16],"tags":[233,246,245],"class_list":["post-20214","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-files","category-head-lines","category-homepage-english","category-twitter","tag-africa-press","tag-africa-press-lesotho","tag-lesotho"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gone with the wind: Lesotho\u2019s $15-billion energy pipedream - Lesotho<\/title>\n<meta name=\"description\" content=\"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream\" \/>\n<meta property=\"og:description\" content=\"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\" \/>\n<meta property=\"og:site_name\" content=\"Lesotho\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-05T09:31:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-05T09:45:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"660\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream\",\"datePublished\":\"2022-10-05T09:31:28+00:00\",\"dateModified\":\"2022-10-05T09:45:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\"},\"wordCount\":2161,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Lesotho\",\"Lesotho\"],\"articleSection\":[\"all news\",\"files\",\"head lines\",\"homepage-english\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\",\"url\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\",\"name\":\"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream - Lesotho\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg\",\"datePublished\":\"2022-10-05T09:31:28+00:00\",\"dateModified\":\"2022-10-05T09:45:40+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg\",\"width\":1024,\"height\":660,\"caption\":\"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/lesotho\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#website\",\"url\":\"https:\/\/www.africa-press.net\/lesotho\/\",\"name\":\"Lesotho\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/lesotho\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream - Lesotho","description":"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","og_locale":"en_US","og_type":"article","og_title":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream","og_description":"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...","og_url":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","og_site_name":"Lesotho","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-10-05T09:31:28+00:00","article_modified_time":"2022-10-05T09:45:40+00:00","og_image":[{"width":1024,"height":660,"url":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream","datePublished":"2022-10-05T09:31:28+00:00","dateModified":"2022-10-05T09:45:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2"},"wordCount":2161,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg","keywords":["Africa Press","Africa Press-Lesotho","Lesotho"],"articleSection":["all news","files","head lines","homepage-english","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","url":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2","name":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream - Lesotho","isPartOf":{"@id":"https:\/\/www.africa-press.net\/lesotho\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg","datePublished":"2022-10-05T09:31:28+00:00","dateModified":"2022-10-05T09:45:40+00:00","author":{"@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"A$15-billion wind farm project that would have given Lesotho bragging rights to Africa\u2019s largest renewable energy projec ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#primaryimage","url":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg","contentUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2022\/10\/postQueueImg_10-633d521c63d03.jpg","width":1024,"height":660,"caption":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/gone-with-the-wind-lesothos-15-billion-energy-pipedream-2#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/lesotho\/"},{"@type":"ListItem","position":2,"name":"Gone with the wind: Lesotho\u2019s $15-billion energy pipedream"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/lesotho\/#website","url":"https:\/\/www.africa-press.net\/lesotho\/","name":"Lesotho","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/lesotho\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts\/20214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/comments?post=20214"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts\/20214\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/media\/20213"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/media?parent=20214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/categories?post=20214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/tags?post=20214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}