{"id":31248,"date":"2023-07-12T08:49:39","date_gmt":"2023-07-12T08:49:39","guid":{"rendered":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule"},"modified":"2023-07-12T09:07:06","modified_gmt":"2023-07-12T09:07:06","slug":"maintenance-of-a2-road-on-schedule","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule","title":{"rendered":"Maintenance of A2 road on schedule"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Lesotho. <\/strong><\/span>Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate has said. The total progress of the road works is at 60 percent while progress on shoulder gravelling and side drains excavation is at 90 percent.<\/p>\n<p>The project is scheduled for completion by November, 2019, it said in a statement today. \u201cThe major of works for the plant and design build maintenance project includes rehabilitation of the badly deuterated 1.5 km section from Mafeteng traffic circle by existing base and surfacing and constructing sidewalks.<\/p>\n<p>Maintenance of streetlights and installation of new ones will be carried out on this section. \u201cOther works entails pothole patching, cleaning and reshaping of the existing longitudinal side drain, reinstating drainage system to proper functionality, re-gravelling road shoulders throughout the length of the road, patching and repairing edge-breaks and surfacing with asphalt.<\/p>\n<p>Ancillary works such as road marking, installation of the road studs, replacing of relevant road signs, reinstating of reinforcement concrete kilometre marker posts as well as reinstating of erosion protection structures among others will also be undertaken,\u201d read the statement.<\/p>\n<p>The approximately M50 million project is carried out by W. N. Letsapo Construction (PTY) Ltd in association with SM Consulting Engineering who undertook the design works for the sections to be rehabilitated as well as supervision of the entire maintenance works.<\/p>\n<p>The road linking Mafeteng and Mohale\u2019s Hoek was constructed more than twenty years ago. The A2 Road, popularly known as the Main South 1 forms part of a very important main link from Maseru, traversing the four district of Mafeteng, Mohale\u2019s hoek, Quthing, and Qacha\u2019s Nek in the South of Lesotho.<\/p>\n<p>The maintenance of this road is an effort to prolong its lifetimes as well as to recover the road\u2019s assert value. Once the road condition is improved, travel time and the cost of doing business will be lowered as it will reduce vehicle operation costs.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/lesotho\">Lesotho<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Lesotho. Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate has said. The total progress of the road works is at 60 percent while progress on shoulder gravelling and side drains excavation is at 90 percent. The project is scheduled for [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":31247,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[233,246,245,444],"class_list":["post-31248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-lesotho","tag-lesotho","tag-road"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Maintenance of A2 road on schedule - Lesotho<\/title>\n<meta name=\"description\" content=\"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Maintenance of A2 road on schedule\" \/>\n<meta property=\"og:description\" content=\"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\" \/>\n<meta property=\"og:site_name\" content=\"Lesotho\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-12T08:49:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-12T09:07:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Maintenance of A2 road on schedule\",\"datePublished\":\"2023-07-12T08:49:39+00:00\",\"dateModified\":\"2023-07-12T09:07:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\"},\"wordCount\":342,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Lesotho\",\"Lesotho\",\"road\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\",\"url\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\",\"name\":\"Maintenance of A2 road on schedule - Lesotho\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg\",\"datePublished\":\"2023-07-12T08:49:39+00:00\",\"dateModified\":\"2023-07-12T09:07:06+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg\",\"width\":1280,\"height\":720,\"caption\":\"Maintenance of A2 road on schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/lesotho\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Maintenance of A2 road on schedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#website\",\"url\":\"https:\/\/www.africa-press.net\/lesotho\/\",\"name\":\"Lesotho\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/lesotho\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Maintenance of A2 road on schedule - Lesotho","description":"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule","og_locale":"en_US","og_type":"article","og_title":"Maintenance of A2 road on schedule","og_description":"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...","og_url":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule","og_site_name":"Lesotho","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-07-12T08:49:39+00:00","article_modified_time":"2023-07-12T09:07:06+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Maintenance of A2 road on schedule","datePublished":"2023-07-12T08:49:39+00:00","dateModified":"2023-07-12T09:07:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule"},"wordCount":342,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg","keywords":["Africa Press","Africa Press-Lesotho","Lesotho","road"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule","url":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule","name":"Maintenance of A2 road on schedule - Lesotho","isPartOf":{"@id":"https:\/\/www.africa-press.net\/lesotho\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg","datePublished":"2023-07-12T08:49:39+00:00","dateModified":"2023-07-12T09:07:06+00:00","author":{"@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Work on rehabilitation of a section of the A2 Road from Mafeteng to Mohale\u2019s Hoek is on schedule, the Roads Directorate ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#primaryimage","url":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg","contentUrl":"https:\/\/static.africa-press.net\/lesotho\/sites\/62\/2023\/07\/sm_1689136587.59092.jpg","width":1280,"height":720,"caption":"Maintenance of A2 road on schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/lesotho\/all-news\/maintenance-of-a2-road-on-schedule#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/lesotho\/"},{"@type":"ListItem","position":2,"name":"Maintenance of A2 road on schedule"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/lesotho\/#website","url":"https:\/\/www.africa-press.net\/lesotho\/","name":"Lesotho","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/lesotho\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/lesotho\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts\/31248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/comments?post=31248"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/posts\/31248\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/media\/31247"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/media?parent=31248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/categories?post=31248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/lesotho\/wp-json\/wp\/v2\/tags?post=31248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}