{"id":10763,"date":"2021-12-05T20:35:25","date_gmt":"2021-12-05T20:35:25","guid":{"rendered":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis"},"modified":"2021-12-05T21:01:02","modified_gmt":"2021-12-05T21:01:02","slug":"acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","title":{"rendered":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Malawi. <\/strong><\/span>The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract for upgrading of Marka-Bangula railway to Mota Engil without any solid basis.<\/p>\n<p>The bureau has ordered the ministry to re-valuate bids and find a new contractor within 15 days. The order comes after months of investigations by the bureau.<\/p>\n<p>\u201cThe Bureau\u2019s investigation has faulted the Evaluation Team for substantially departing from the requirements of the Bidding Document when evaluating the bids contrary to the provisions of the Public Procurement and Disposal of Assets Act and the Bidding Document for this contract. This makes the intended award of contract to Mota Engil without any solid basis,\u201d reads part of the bureau\u2019s statement released yesterday.<\/p>\n<p>The Bureau has since told the Ministry of Transport and Public Works to re-evaluate the last three bidders with consideration being made to areas of noncompliance to Bidding Document that the Bureau raised in its communication to the Ministry.<\/p>\n<p>\u201cThe team to re-evaluate the bids should be different from the one that conducted the first evaluation with complete lack of attention to detail to the Bidding Document.<\/p>\n<p>\u201cHaving in mind the importance of this project to Malawi economy and that this project is a bilateral arrangement between Malawi and Mozambique and that Mozambique has almost finalized their side whilst Malawi has done nothing, the process of reevaluation should be done within the next 15 days and proceed with the rest of the procurement processes according to the law,\u201d reads part of the statement signed by Principal Public Relations Officer Egrita M. Ndala.<\/p>\n<p>In September, ACB stopped the Ministry of Transport and Public Works from awarding a contract for the upgrading of Marka-Bangula railway over corruption allegations.<\/p>\n<p>The awarding of the contract was stopped days after Ministry of Transport and Public Works published a notification for intention to award Mota-Engil a K48 billion contract for the reconstruction of the 72-kilometre railway line.<\/p>\n<p>Mota-Engil emerged the successful bidder with the lowest price (K48 244 861 524.98) against two others\u2013China Railway (K59 906 673 465.11) and China Civil Engineering (K79 766 540 032.76).<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/malawi\">Malawi<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Malawi. The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract for upgrading of Marka-Bangula railway to Mota Engil without any solid basis. The bureau has ordered the ministry to re-valuate bids and find a new contractor within 15 days. The order comes after months [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":10762,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,7,8,12],"tags":[233,371,302,884,300,234,1410,2085],"class_list":["post-10763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-head-lines","category-homepage-english","category-policy","tag-africa-press","tag-africa-press-malawi","tag-anti-corruption-bureau-acb","tag-construction","tag-corruption","tag-malawi","tag-ministry-of-transport","tag-mota-engil"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis - Malawi<\/title>\n<meta name=\"description\" content=\"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis\" \/>\n<meta property=\"og:description\" content=\"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\" \/>\n<meta property=\"og:site_name\" content=\"Malawi\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-05T20:35:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-05T21:01:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"666\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis\",\"datePublished\":\"2021-12-05T20:35:25+00:00\",\"dateModified\":\"2021-12-05T21:01:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\"},\"wordCount\":367,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Malawi\",\"Anti-Corruption Bureau (ACB)\",\"Construction\",\"corruption\",\"Malawi\",\"Ministry of Transport\",\"Mota Engil\"],\"articleSection\":[\"all news\",\"head lines\",\"homepage-english\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\",\"url\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\",\"name\":\"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis - Malawi\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg\",\"datePublished\":\"2021-12-05T20:35:25+00:00\",\"dateModified\":\"2021-12-05T21:01:02+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg\",\"width\":720,\"height\":666,\"caption\":\"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/malawi\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#website\",\"url\":\"https:\/\/www.africa-press.net\/malawi\/\",\"name\":\"Malawi\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/malawi\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis - Malawi","description":"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","og_locale":"en_US","og_type":"article","og_title":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis","og_description":"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...","og_url":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","og_site_name":"Malawi","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-12-05T20:35:25+00:00","article_modified_time":"2021-12-05T21:01:02+00:00","og_image":[{"width":720,"height":666,"url":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis","datePublished":"2021-12-05T20:35:25+00:00","dateModified":"2021-12-05T21:01:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis"},"wordCount":367,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg","keywords":["Africa Press","Africa Press-Malawi","Anti-Corruption Bureau (ACB)","Construction","corruption","Malawi","Ministry of Transport","Mota Engil"],"articleSection":["all news","head lines","homepage-english","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","url":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis","name":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis - Malawi","isPartOf":{"@id":"https:\/\/www.africa-press.net\/malawi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg","datePublished":"2021-12-05T20:35:25+00:00","dateModified":"2021-12-05T21:01:02+00:00","author":{"@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The Anti-Corruption Bureau (ACB) says the Ministry of Transport Public Works awarded a 48 billion Malawi Kwacha contract ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#primaryimage","url":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg","contentUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2021\/12\/img-61ad282d65fd8.jpg","width":720,"height":666,"caption":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/acb-says-mota-engil-was-awarded-48-billion-malawi-kwacha-contract-without-solid-basis#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/malawi\/"},{"@type":"ListItem","position":2,"name":"ACB says Mota Engil was awarded 48 billion Malawi Kwacha contract without solid basis"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/malawi\/#website","url":"https:\/\/www.africa-press.net\/malawi\/","name":"Malawi","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/malawi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts\/10763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/comments?post=10763"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts\/10763\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/media\/10762"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/media?parent=10763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/categories?post=10763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/tags?post=10763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}