{"id":59747,"date":"2024-03-01T23:46:31","date_gmt":"2024-03-01T23:46:31","guid":{"rendered":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge"},"modified":"2024-03-01T23:54:26","modified_gmt":"2024-03-01T23:54:26","slug":"chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","title":{"rendered":"Chakwera lays foundation for K37 billion Lilongwe Bridge"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Malawi. <\/strong><\/span>President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 billion. Upon arrival at the construction site, President Chakwera was welcomed by Vice President Dr Saulos Chilima, ambassadors and other government officials.<\/p>\n<p>In his speech after laying the foundation stone, President Chakwera said the bridge will help in the development of the country as it will be constructed in a modern way.<\/p>\n<p>\u201cThe bridge is looking very impressive. It is designed in a different style compared to the previous one. This will be the biggest bridge in the country once it is done.<\/p>\n<p>\u201cAs government, our aim is to have the capital city changed. We are bringing in many developments not only in the road network but also other sectors,\u201d he said.<\/p>\n<p>Chakwera thanked the Japanese Government for its efforts to construct the bridge saying it is a huge success for the country. The President said, once completed, the bridge will provide better service delivery within the city boundaries and beyond due to the road improvements.<\/p>\n<p>Government of Malawi signed a grant agreement for improvement of main roads in the city of Lilongwe, which includes 78 metres dual carriageway bridge and 743 metres long road.<\/p>\n<p>The improvement of this section of the road will help ease transportation of goods and services as well as reduce traffic congestion in the city. The construction project, which commenced on 22nd November, 2023, is being funded by the government of Japan. It is expected to be completed by 21st November, 2025.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/malawi\">Malawi<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Malawi. President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 billion. Upon arrival at the construction site, President Chakwera was welcomed by Vice President Dr Saulos Chilima, ambassadors and other government officials. In his speech after laying the foundation stone, President Chakwera said [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":59746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,7,12],"tags":[233,371,234],"class_list":["post-59747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-head-lines","category-policy","tag-africa-press","tag-africa-press-malawi","tag-malawi"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Chakwera lays foundation for K37 billion Lilongwe Bridge - Malawi<\/title>\n<meta name=\"description\" content=\"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chakwera lays foundation for K37 billion Lilongwe Bridge\" \/>\n<meta property=\"og:description\" content=\"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\" \/>\n<meta property=\"og:site_name\" content=\"Malawi\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-01T23:46:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-01T23:54:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Chakwera lays foundation for K37 billion Lilongwe Bridge\",\"datePublished\":\"2024-03-01T23:46:31+00:00\",\"dateModified\":\"2024-03-01T23:54:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\"},\"wordCount\":272,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Malawi\",\"Malawi\"],\"articleSection\":[\"all news\",\"head lines\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\",\"url\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\",\"name\":\"Chakwera lays foundation for K37 billion Lilongwe Bridge - Malawi\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg\",\"datePublished\":\"2024-03-01T23:46:31+00:00\",\"dateModified\":\"2024-03-01T23:54:26+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg\",\"width\":720,\"height\":480,\"caption\":\"Chakwera lays foundation for K37 billion Lilongwe Bridge\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/malawi\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Chakwera lays foundation for K37 billion Lilongwe Bridge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#website\",\"url\":\"https:\/\/www.africa-press.net\/malawi\/\",\"name\":\"Malawi\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/malawi\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Chakwera lays foundation for K37 billion Lilongwe Bridge - Malawi","description":"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","og_locale":"en_US","og_type":"article","og_title":"Chakwera lays foundation for K37 billion Lilongwe Bridge","og_description":"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...","og_url":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","og_site_name":"Malawi","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-03-01T23:46:31+00:00","article_modified_time":"2024-03-01T23:54:26+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Chakwera lays foundation for K37 billion Lilongwe Bridge","datePublished":"2024-03-01T23:46:31+00:00","dateModified":"2024-03-01T23:54:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge"},"wordCount":272,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg","keywords":["Africa Press","Africa Press-Malawi","Malawi"],"articleSection":["all news","head lines","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","url":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge","name":"Chakwera lays foundation for K37 billion Lilongwe Bridge - Malawi","isPartOf":{"@id":"https:\/\/www.africa-press.net\/malawi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg","datePublished":"2024-03-01T23:46:31+00:00","dateModified":"2024-03-01T23:54:26+00:00","author":{"@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"President Lazurus Chakwera has today laid a foundation stone for the construction of Lilongwe Bridge which will cost K37 ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#primaryimage","url":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg","contentUrl":"https:\/\/static.africa-press.net\/malawi\/sites\/36\/2024\/03\/sm_1709324545.219424.jpg","width":720,"height":480,"caption":"Chakwera lays foundation for K37 billion Lilongwe Bridge"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/malawi\/all-news\/chakwera-lays-foundation-for-k37-billion-lilongwe-bridge#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/malawi\/"},{"@type":"ListItem","position":2,"name":"Chakwera lays foundation for K37 billion Lilongwe Bridge"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/malawi\/#website","url":"https:\/\/www.africa-press.net\/malawi\/","name":"Malawi","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/malawi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/malawi\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts\/59747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/comments?post=59747"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/posts\/59747\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/media\/59746"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/media?parent=59747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/categories?post=59747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/malawi\/wp-json\/wp\/v2\/tags?post=59747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}