{"id":21182,"date":"2022-10-10T10:40:01","date_gmt":"2022-10-10T10:40:01","guid":{"rendered":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel"},"modified":"2022-10-10T11:35:09","modified_gmt":"2022-10-10T11:35:09","slug":"metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","title":{"rendered":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Mauritius. <\/strong><\/span>The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% completed.<\/p>\n<p>A series of testing and trial runs along the route are being conducted to ensure the operation readiness of the light rail along the alignment, stated the Chief Executive Officer of Metro Express Limited (MEL), Mr Das Mootanah.<\/p>\n<p>He was speaking on 16 September 2022 during a trial run from Phoenix station to the Curepipe station in the presence of the International Consultant of SMRT, Mr Lui Wai Meng; the Project Director of CAF, Mr Ander Montes; the Chief Operations of MEL, Mr Parama Naidoo; and the Chief Maintenance of MEL, Mr Mooroogen Chinapen.<\/p>\n<p>Mr Mootanah indicated that the operations and maintenance team from MEL, RITES, Larsen and Toubro, and CAF with oversight from SMRT, are testing the entire system, the overhead lines and also all the software to ensure that everything is well integrated with the entire rail line between Port Louis and Curepipe.<\/p>\n<p>Presently, SMRT is conducting an independent safety audit, he added.<\/p>\n<p>The aim of carrying the trial runs, he underlined, is to validate the Standard Operating Procedure and the Operational safety, which ensures that the entire network is ready for commercial service.<\/p>\n<p>As for phase 3 of the project, from Rose-Hill to Re\u0301duit, it will be completed before the end of this year, he said.<\/p>\n<p>For his part, Mr Lui Wai Meng, said that the independent safety assessment is one of the best practices in the world to test the operationalisation and engineering of a transit system.<\/p>\n<p>It ensures that the alignment meets the legal and regulatory standards that relate to safety, he pointed out.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/mauritius\">Mauritius<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Mauritius. The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% completed. A series of testing and trial runs along the route are being conducted to ensure the operation readiness of the light rail along the alignment, stated the Chief Executive Officer of [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":21181,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3,7,8,16],"tags":[233,245,241,890],"class_list":["post-21182","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","category-head-lines","category-homepage-english","category-twitter","tag-africa-press","tag-africa-press-mauritius","tag-mauritius","tag-metro-express"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL - Mauritius<\/title>\n<meta name=\"description\" content=\"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL\" \/>\n<meta property=\"og:description\" content=\"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\" \/>\n<meta property=\"og:site_name\" content=\"Mauritius\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-10T10:40:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-10T11:35:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL\",\"datePublished\":\"2022-10-10T10:40:01+00:00\",\"dateModified\":\"2022-10-10T11:35:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\"},\"wordCount\":304,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Mauritius\",\"Mauritius\",\"Metro Express\"],\"articleSection\":[\"all news\",\"community\",\"head lines\",\"homepage-english\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\",\"url\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\",\"name\":\"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL - Mauritius\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg\",\"datePublished\":\"2022-10-10T10:40:01+00:00\",\"dateModified\":\"2022-10-10T11:35:09+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/mauritius\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#website\",\"url\":\"https:\/\/www.africa-press.net\/mauritius\/\",\"name\":\"Mauritius\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/mauritius\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL - Mauritius","description":"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","og_locale":"en_US","og_type":"article","og_title":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL","og_description":"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...","og_url":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","og_site_name":"Mauritius","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-10-10T10:40:01+00:00","article_modified_time":"2022-10-10T11:35:09+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL","datePublished":"2022-10-10T10:40:01+00:00","dateModified":"2022-10-10T11:35:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel"},"wordCount":304,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg","keywords":["Africa Press","Africa Press-Mauritius","Mauritius","Metro Express"],"articleSection":["all news","community","head lines","homepage-english","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","url":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel","name":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL - Mauritius","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mauritius\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg","datePublished":"2022-10-10T10:40:01+00:00","dateModified":"2022-10-10T11:35:09+00:00","author":{"@id":"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The 6.5km alignment of phase 2C of the Metro Express project which will connect Phoenix to Curepipe is around 98% comple ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#primaryimage","url":"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg","contentUrl":"https:\/\/static.africa-press.net\/mauritius\/sites\/61\/2022\/10\/postQueueImg_8-6344034756dad.jpg","width":1024,"height":683,"caption":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/mauritius\/all-news\/metro-express-project-phase-2c-from-phoenix-to-curepipe-is-98-completed-affirms-director-of-mel#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/mauritius\/"},{"@type":"ListItem","position":2,"name":"Metro Express Project: Phase 2C from Phoenix to Curepipe is 98% completed, affirms Director of MEL"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/mauritius\/#website","url":"https:\/\/www.africa-press.net\/mauritius\/","name":"Mauritius","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/mauritius\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mauritius\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/posts\/21182","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/comments?post=21182"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/posts\/21182\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/media\/21181"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/media?parent=21182"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/categories?post=21182"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/mauritius\/wp-json\/wp\/v2\/tags?post=21182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}