{"id":41478,"date":"2023-06-27T11:24:13","date_gmt":"2023-06-27T11:24:13","guid":{"rendered":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa"},"modified":"2023-06-27T11:35:41","modified_gmt":"2023-06-27T11:35:41","slug":"second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","title":{"rendered":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Mozambique. <\/strong><\/span>The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral Norte to double gas extraction off the northern coast of Mozambique, says a preparatory study.<\/p>\n<p>\u201cThe Area 4 concessionaire proposes as the most efficient way to maximise the recovery and profitability of the Coral reserve\u2019s gas resources, a second FLNG project,\u201d the English acronym that identifies the floating platform, reads the environmental pre-feasibility study.<\/p>\n<p>The document, which was drawn up by Mozambican company Consultec for oil company Eni, the consortium\u2019s delegated operator, was published on the Zitamar news portal.<\/p>\n<p>The planned investment is US$7 billion (6.3 billion euros) and is still subject to approval by the Mozambican government.<\/p>\n<p>If the schedule goes according to plan, the platform will start production in the second half of 2027 \u2013 meaning it could start even before onshore projects, which depend on security implications due to the armed insurgency in Cabo Delgado.<\/p>\n<p>Coral Norte will be stationed 10 kilometres north of Coral Sul, which started production in November, making it the first project to take advantage of the large reserves in the Rovuma basin.<\/p>\n<p>The FLNG Coral Norte project \u201cwill be a replica of Coral Sul,\u201d 50 kilometres from the coast and connected to six underwater wells at a depth of 2,000 metres.<\/p>\n<p>Area 4 will thus be producing seven mtpa (million tonnes per year).<\/p>\n<p>At the level of the preliminary study, \u201cnone of the impacts identified constitutes a fatal issue\u201d.<\/p>\n<p>That is, \u201cseveral potentially significant social and environmental impacts have been identified, such as potential air and noise emissions\u201d, however, \u201cappropriate mitigation measures for these impacts are known\u201d.<\/p>\n<p>\u201cAll identified impacts will be carefully investigated and mitigated in the Environmental Impact Assessment phase\u201d, which will follow and is expected to include public consultation sessions shortly.<\/p>\n<p>Manpower requirements \u201cwill vary throughout the life cycle of FLNG Coral North\u201d, the document adds.<\/p>\n<p>The environmental pre-feasibility study also states that between drilling the wells and start-up the project is expected to employ up to 1,400 people, but these will be mainly foreign skilled professionals.<\/p>\n<p>During the operation phase there will be up to 900 jobs, with more opportunities for Mozambican workers.<\/p>\n<p>Area 4 is operated by Mozambique Rovuma Venture (MRV), a joint venture co-owned by ExxonMobil, Eni and CNPC (China), which has a 70% participating interest in the concession contract.<\/p>\n<p>Galp, Kogas (South Korea) and Empresa Nacional de Hidrocarbonetos (Mozambique) each have a 10% stake.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/mozambique\">Mozambique<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Mozambique. The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral Norte to double gas extraction off the northern coast of Mozambique, says a preparatory study. \u201cThe Area 4 concessionaire proposes as the most efficient way to maximise the recovery and profitability [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":41477,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,281,283],"class_list":["post-41478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-mozambique","tag-mozambique"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Second FLNG platform will raise Rovuma area 4 production to 7mtpa - Mozambique<\/title>\n<meta name=\"description\" content=\"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Second FLNG platform will raise Rovuma area 4 production to 7mtpa\" \/>\n<meta property=\"og:description\" content=\"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\" \/>\n<meta property=\"og:site_name\" content=\"Mozambique\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-27T11:24:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-27T11:35:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"775\" \/>\n\t<meta property=\"og:image:height\" content=\"517\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Second FLNG platform will raise Rovuma area 4 production to 7mtpa\",\"datePublished\":\"2023-06-27T11:24:13+00:00\",\"dateModified\":\"2023-06-27T11:35:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\"},\"wordCount\":420,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Mozambique\",\"Mozambique\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\",\"name\":\"Second FLNG platform will raise Rovuma area 4 production to 7mtpa - Mozambique\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg\",\"datePublished\":\"2023-06-27T11:24:13+00:00\",\"dateModified\":\"2023-06-27T11:35:41+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg\",\"width\":775,\"height\":517,\"caption\":\"Second FLNG platform will raise Rovuma area 4 production to 7mtpa\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/mozambique\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Second FLNG platform will raise Rovuma area 4 production to 7mtpa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/\",\"name\":\"Mozambique\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa - Mozambique","description":"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","og_locale":"en_US","og_type":"article","og_title":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa","og_description":"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...","og_url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","og_site_name":"Mozambique","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-06-27T11:24:13+00:00","article_modified_time":"2023-06-27T11:35:41+00:00","og_image":[{"width":775,"height":517,"url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa","datePublished":"2023-06-27T11:24:13+00:00","dateModified":"2023-06-27T11:35:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa"},"wordCount":420,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg","keywords":["Africa Press","Africa Press-Mozambique","Mozambique"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa","name":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa - Mozambique","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg","datePublished":"2023-06-27T11:24:13+00:00","dateModified":"2023-06-27T11:35:41+00:00","author":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The concession holder for Rovuma Area 4 is preparing a second floating platform, a copy of the first and called Coral No ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#primaryimage","url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg","contentUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2023\/06\/sm_1687849403.433672.jpg","width":775,"height":517,"caption":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/second-flng-platform-will-raise-rovuma-area-4-production-to-7mtpa#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/mozambique\/"},{"@type":"ListItem","position":2,"name":"Second FLNG platform will raise Rovuma area 4 production to 7mtpa"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/mozambique\/#website","url":"https:\/\/www.africa-press.net\/mozambique\/","name":"Mozambique","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/41478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/comments?post=41478"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/41478\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media\/41477"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media?parent=41478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/categories?post=41478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/tags?post=41478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}