{"id":58229,"date":"2024-03-30T14:53:32","date_gmt":"2024-03-30T14:53:32","guid":{"rendered":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system"},"modified":"2024-03-30T16:00:38","modified_gmt":"2024-03-30T16:00:38","slug":"seven-million-meticais-needed-by-edm-to-restore-power-system","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system","title":{"rendered":"Seven million Meticais needed by EDM to restore power system"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Mozambique. <\/strong><\/span>Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the current exchange rate) to restore the power system damaged by the torrential rains of last Sunday and Monday (which reached 300 millimeters in 48 hours) in the southern region of the country, especially in Maputo province and City.<\/p>\n<p>According to the Minister of Mineral Resources and Energy, Carlos Zacarias, who gave the figures during a working visit on Thursday to the infrastructures damaged by the heavy rainfall in Matola, \u201cin general, during the rain, the electricity system remained intact throughout the southern region, despite the collapse of some pylons and transformer stations.\u201d<\/p>\n<p>During the visit, the minister observed that the transformer stations and electricity transmission lines in the Maputo neighborhoods of Machava-Bunhic\u0327a, Matlemele and Khongolote, were affected by the rains.<\/p>\n<p>\u201cRight from the start, work has been under way to restore the power supply. In places where the power supply was affected, the system was mostly switched off for safety reasons. Since we had flooded transformer stations, in order to avoid electric shocks and other consequences, the system was switched off\u201d, he said.<\/p>\n<p>According to the minister, as a result \u201conly 150 families, in these neighborhoods, were affected, but it is hoped that the system will be totally restored\u201d, he added.<\/p>\n<p>But, unlike previous storms, this time there were no general power cuts. EDM managed to keep the lights on for most residents of Maputo and Matola. Zacarias attributed this to the routine maintenance that technical teams, deployed in strategic points, carry out on the power transmission and distribution infrastructures.<\/p>\n<p>According to Mozambique\u2019s relief agency, the National Disaster Management Institute (INGD), the floods caused by the torrential rains, affected, in Maputo city alone, at least 46,555 people. The thousands of people flooded out of their homes are now taking refuge in 22 accommodation centers set up by the central and municipal governments.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/mozambique\">Mozambique<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Mozambique. Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the current exchange rate) to restore the power system damaged by the torrential rains of last Sunday and Monday (which reached 300 millimeters in 48 hours) in the southern region of the country, especially in Maputo province and City. [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":58228,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[233,281,283],"class_list":["post-58229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-mozambique","tag-mozambique"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Seven million Meticais needed by EDM to restore power system - Mozambique<\/title>\n<meta name=\"description\" content=\"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Seven million Meticais needed by EDM to restore power system\" \/>\n<meta property=\"og:description\" content=\"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\" \/>\n<meta property=\"og:site_name\" content=\"Mozambique\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-30T14:53:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-30T16:00:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"474\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Seven million Meticais needed by EDM to restore power system\",\"datePublished\":\"2024-03-30T14:53:32+00:00\",\"dateModified\":\"2024-03-30T16:00:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\"},\"wordCount\":335,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Mozambique\",\"Mozambique\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\",\"name\":\"Seven million Meticais needed by EDM to restore power system - Mozambique\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg\",\"datePublished\":\"2024-03-30T14:53:32+00:00\",\"dateModified\":\"2024-03-30T16:00:38+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg\",\"width\":1140,\"height\":474,\"caption\":\"Seven million Meticais needed by EDM to restore power system\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/mozambique\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Seven million Meticais needed by EDM to restore power system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/\",\"name\":\"Mozambique\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Seven million Meticais needed by EDM to restore power system - Mozambique","description":"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system","og_locale":"en_US","og_type":"article","og_title":"Seven million Meticais needed by EDM to restore power system","og_description":"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...","og_url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system","og_site_name":"Mozambique","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-03-30T14:53:32+00:00","article_modified_time":"2024-03-30T16:00:38+00:00","og_image":[{"width":1140,"height":474,"url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Seven million Meticais needed by EDM to restore power system","datePublished":"2024-03-30T14:53:32+00:00","dateModified":"2024-03-30T16:00:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system"},"wordCount":335,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg","keywords":["Africa Press","Africa Press-Mozambique","Mozambique"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system","url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system","name":"Seven million Meticais needed by EDM to restore power system - Mozambique","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg","datePublished":"2024-03-30T14:53:32+00:00","dateModified":"2024-03-30T16:00:38+00:00","author":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Mozambique\u2019s publicly-owned electricity company, EDM, needs about seven million Meticais (110,000 dollars, at the curren ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#primaryimage","url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg","contentUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/03\/sm_1711797733.731628.jpg","width":1140,"height":474,"caption":"Seven million Meticais needed by EDM to restore power system"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/seven-million-meticais-needed-by-edm-to-restore-power-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/mozambique\/"},{"@type":"ListItem","position":2,"name":"Seven million Meticais needed by EDM to restore power system"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/mozambique\/#website","url":"https:\/\/www.africa-press.net\/mozambique\/","name":"Mozambique","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/58229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/comments?post=58229"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/58229\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media\/58228"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media?parent=58229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/categories?post=58229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/tags?post=58229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}