{"id":59728,"date":"2024-04-26T21:02:35","date_gmt":"2024-04-26T21:02:35","guid":{"rendered":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway"},"modified":"2024-04-26T22:19:55","modified_gmt":"2024-04-26T22:19:55","slug":"work-on-the-tete-moatize-temporary-bridge-is-underway","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway","title":{"rendered":"Work on the Tete-Moatize temporary bridge is underway"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Mozambique. <\/strong><\/span>The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the temporary bridge over the Revu\u0301bue\u0300 River, between the cities of Moatize and Tete, is in the phase of geotechnical and geophysical studies, with guarantees that it will be placed later this year.<\/p>\n<p>This is a temporary solution promised by the leader on January 17th in Tete, as a measure to relieve the heavy goods traffic pressure on the Samora Machel bridge, after one of its suspension anchors collapsed, requiring emergency intervention.<\/p>\n<p>When questioned today by \u201cNoti\u0301cias,\u201d on the sidelines of the 11th Meeting of the Zambezi River Watercourse Commission Council of Ministers, held in Tete, considering that the installation was scheduled to begin in February and end in June, the Minister explained that work is already underway in this regard.<\/p>\n<p>\u201cWe are working on it as announced. We have two projects in hand for the Revu\u0301bue\u0300, which are the temporary bridge whose studies are underway, and the permanent one. After we conclude the executive plan for the new infrastructure, we will mobilize financing, a matter we are already discussing with various entities,\u201d he clarified.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/mozambique\">Mozambique<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Mozambique. The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the temporary bridge over the Revu\u0301bue\u0300 River, between the cities of Moatize and Tete, is in the phase of geotechnical and geophysical studies, with guarantees that it will be placed later this year. This is a [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":59727,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[233,281,283],"class_list":["post-59728","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-mozambique","tag-mozambique"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Work on the Tete-Moatize temporary bridge is underway - Mozambique<\/title>\n<meta name=\"description\" content=\"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work on the Tete-Moatize temporary bridge is underway\" \/>\n<meta property=\"og:description\" content=\"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\" \/>\n<meta property=\"og:site_name\" content=\"Mozambique\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-26T21:02:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-26T22:19:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1556\" \/>\n\t<meta property=\"og:image:height\" content=\"1171\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Work on the Tete-Moatize temporary bridge is underway\",\"datePublished\":\"2024-04-26T21:02:35+00:00\",\"dateModified\":\"2024-04-26T22:19:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\"},\"wordCount\":214,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Mozambique\",\"Mozambique\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\",\"name\":\"Work on the Tete-Moatize temporary bridge is underway - Mozambique\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg\",\"datePublished\":\"2024-04-26T21:02:35+00:00\",\"dateModified\":\"2024-04-26T22:19:55+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg\",\"width\":1556,\"height\":1171,\"caption\":\"Work on the Tete-Moatize temporary bridge is underway\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/mozambique\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work on the Tete-Moatize temporary bridge is underway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/\",\"name\":\"Mozambique\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Work on the Tete-Moatize temporary bridge is underway - Mozambique","description":"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway","og_locale":"en_US","og_type":"article","og_title":"Work on the Tete-Moatize temporary bridge is underway","og_description":"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...","og_url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway","og_site_name":"Mozambique","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-04-26T21:02:35+00:00","article_modified_time":"2024-04-26T22:19:55+00:00","og_image":[{"width":1556,"height":1171,"url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Work on the Tete-Moatize temporary bridge is underway","datePublished":"2024-04-26T21:02:35+00:00","dateModified":"2024-04-26T22:19:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway"},"wordCount":214,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg","keywords":["Africa Press","Africa Press-Mozambique","Mozambique"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway","url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway","name":"Work on the Tete-Moatize temporary bridge is underway - Mozambique","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg","datePublished":"2024-04-26T21:02:35+00:00","dateModified":"2024-04-26T22:19:55+00:00","author":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The Minister of Public Works, Housing, and Water Resources, Carlos Mesquita, ensured that the installation of the tempor ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#primaryimage","url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg","contentUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2024\/04\/sm_1714152160.666132.jpg","width":1556,"height":1171,"caption":"Work on the Tete-Moatize temporary bridge is underway"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/work-on-the-tete-moatize-temporary-bridge-is-underway#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/mozambique\/"},{"@type":"ListItem","position":2,"name":"Work on the Tete-Moatize temporary bridge is underway"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/mozambique\/#website","url":"https:\/\/www.africa-press.net\/mozambique\/","name":"Mozambique","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/59728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/comments?post=59728"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/59728\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media\/59727"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media?parent=59728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/categories?post=59728"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/tags?post=59728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}