{"id":6589,"date":"2021-09-28T17:40:47","date_gmt":"2021-09-28T17:40:47","guid":{"rendered":"https:\/\/www.africa-press.net\/mozambique\/?p=6589"},"modified":"2021-09-28T15:54:59","modified_gmt":"2021-09-28T15:54:59","slug":"mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","title":{"rendered":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/mozambique\">Mozambique<\/a>. <\/strong><\/span>Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Praia, the port town in Cabo Delgado that was recaptured from rebel groups in August.<\/p>\n<p>After an outage lasting about one year, electricity from the national grid again flowed to the Defence and Security Forces base, with interventions currently taking place in the town\u2019s infrastructure so that the rest of the low-voltage grid can be connected.<\/p>\n<p>EDM rebuilt 45 kilometres of power line from the Awasse substation to the town and is keeping to the recovery plan announced in early September during a visit to the site by the Minister of Mineral Resources and Energy, Max Tonela.<\/p>\n<p>\u201cBy the end of the month, Moc\u00edmboa da Praia and Palma [the home of the province\u2019s natural gas projects, which was attacked in March] should have energy again,\u201d he said.<\/p>\n<p>Moc\u00edmboa da Praia was occupied by insurgents for a year, up until early August, when it was retaken by Mozambican and Rwandan forces, which, together with Southern African Development Community (SADC) troops, are turning the tide in favour of state forces.<\/p>\n<p>The Mozambican government estimates that districts affected by armed violence need US$11 million (\u20ac9.2 million) in investment for emergency replacement of the electricity grid.<\/p>\n<p>In addition to that amount, the Awasse substation alone (from where all the grid energy is distributed) requires repairs in the order of US$10 million (\u20ac8.4 million).<\/p>\n<p>The reconnection of the mobile telecommunications network depends in turn on the distribution of electricity to the districts affected by the armed insurgency.<\/p>\n<p>On Tuesday, a session of Mozambique\u2019s Council of Ministers approved a reconstruction plan for Cabo Delgado for the period 2021-24, details of which were sent to launch ceremonies to be held shortly.<\/p>\n<p>The province is rich in natural gas, but has been terrorised since 2017 by armed rebels, with some attacks claimed by the Islamic State extremist group.<\/p>\n<p>The conflict has cost more than 3,100 lives, according to the ACLED conflict registration project, and displaced more than 817,000 residents, according to Mozambican authorities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Mozambique. Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Praia, the port town in Cabo Delgado that was recaptured from rebel groups in August. After an outage lasting about one year, electricity from the national grid again flowed to the Defence and Security Forces [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":6588,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3,8,16],"tags":[233,281,283],"class_list":["post-6589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","category-homepage-english","category-twitter","tag-africa-press","tag-africa-press-mozambique","tag-mozambique"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa - Mozambique<\/title>\n<meta name=\"description\" content=\"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa\" \/>\n<meta property=\"og:description\" content=\"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\" \/>\n<meta property=\"og:site_name\" content=\"Mozambique\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-28T17:40:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"584\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa\",\"datePublished\":\"2021-09-28T17:40:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\"},\"wordCount\":356,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Mozambique\",\"Mozambique\"],\"articleSection\":[\"all news\",\"community\",\"homepage-english\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\",\"name\":\"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa - Mozambique\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg\",\"datePublished\":\"2021-09-28T17:40:47+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg\",\"width\":900,\"height\":584,\"caption\":\"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/mozambique\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#website\",\"url\":\"https:\/\/www.africa-press.net\/mozambique\/\",\"name\":\"Mozambique\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa - Mozambique","description":"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","og_locale":"en_US","og_type":"article","og_title":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa","og_description":"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...","og_url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","og_site_name":"Mozambique","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-09-28T17:40:47+00:00","og_image":[{"width":900,"height":584,"url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa","datePublished":"2021-09-28T17:40:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa"},"wordCount":356,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg","keywords":["Africa Press","Africa Press-Mozambique","Mozambique"],"articleSection":["all news","community","homepage-english","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","url":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa","name":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa - Mozambique","isPartOf":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg","datePublished":"2021-09-28T17:40:47+00:00","author":{"@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Public utility Eletricidade de Mo\u00e7ambique (EDM) announced on Thursday the partial restoration of power to Moc\u00edmboa da Pr ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#primaryimage","url":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg","contentUrl":"https:\/\/static.africa-press.net\/mozambique\/sites\/64\/2021\/09\/img-61533abbe38ec.jpg","width":900,"height":584,"caption":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/mozambique\/all-news\/mozambique-electricity-in-mocimboa-da-praia-partially-restored-lusa#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/mozambique\/"},{"@type":"ListItem","position":2,"name":"Mozambique.Electricity in Moc\u00edmboa da Praia partially restored \u2013 Lusa"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/mozambique\/#website","url":"https:\/\/www.africa-press.net\/mozambique\/","name":"Mozambique","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/mozambique\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/mozambique\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/6589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/comments?post=6589"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/posts\/6589\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media\/6588"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/media?parent=6589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/categories?post=6589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/mozambique\/wp-json\/wp\/v2\/tags?post=6589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}