{"id":40932,"date":"2023-03-10T18:18:03","date_gmt":"2023-03-10T18:18:03","guid":{"rendered":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project"},"modified":"2023-03-10T18:31:26","modified_gmt":"2023-03-10T18:31:26","slug":"govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","title":{"rendered":"Govt to spend N$2,4b on second phase of Neckartal Dam project"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Namibia. <\/strong><\/span>THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 billion.<\/p>\n<p>The initial phase of the project was completed at a cost N$5,6 billion in 2018.<\/p>\n<p>Minister of Agriculture, Water and Land Reform Calle Schlettwein, who is currently on a consultative tour of the \/\/Kharas region, told traditional leaders and other stakeholders that the first phase of the project is now complete.<\/p>\n<p>\u201cThe dam is a catalyst for public investment in bulk water supply, intensive agriculture and other spin-offs,\u201d he said.<\/p>\n<p>The dam will increase economic growth and spin-offs for Keetmanshoop in terms of logistics, packaging and storage, he said.<\/p>\n<p>\u201c[There should be] increased productive capacity and export earnings from high-value crops and fruits, greater inclusivity, job creation, income, and about 1 000 temporary jobs during the construction stage,\u201d he said.<\/p>\n<p>The first phase of the project includes close to 19 000 hectares of land purchased in the \/\/Kharas region between 2013 and 2018.<\/p>\n<p>The Ministry of Agriculture, Water, and Land Reform has been allocated a total of N$2,4 billion in the 2023\/24 financial year, a 22,1% increase from last year for the second phase, which requires building canals, spill points, and booster pump stations.<\/p>\n<p>Neckartal is the largest dam in the country, with almost twice the total capacity of existing major dams. Its current water level stands at 94,4% capacity as of Tuesday this week.<\/p>\n<p>Schlettwein said the project will create about 12 600 permanent and seasonal jobs for envisaged irrigation schemes.<\/p>\n<p>The ministry conducted a feasibility study in 2010 and identified more than 5 000ha of irrigable land on the southern and northern sides of the B4 road, between Keetmanshoop and Lu\u0308deritz, east of Seeheim.<\/p>\n<p>The irrigable land is estimated to be approximately 4 250ha or 85% of the required 5 000ha.<\/p>\n<p>Recently, Schlettwein dismissed criticism that the government wasted money in acquiring unproductive land around the dam.<\/p>\n<p>He said the wasteland is where support infrastructure, such as for water distribution, will be built.<\/p>\n<p>\u201cHence, other value chain activities such as feedlots, cold rooms, and intensive animal farming could be carried out on other portions of land, which a layman&#8217;s eye could regard as wasteland,\u201d he said.<\/p>\n<p>\u201cOur decision to acquire the said farms was guided by the technical soil suitability assessment findings.<\/p>\n<p>Investment in and operation of the green schemes entail a host of other ancillary infrastructure across the value chain for which land is needed,\u201d he said.<\/p>\n<p>The dam has the potential to generate a half to two megawatt of hydropower.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/namibia\">Namibia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Namibia. THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 billion. The initial phase of the project was completed at a cost N$5,6 billion in 2018. Minister of Agriculture, Water and Land Reform Calle Schlettwein, who is currently on a consultative tour of the \/\/Kharas region, [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":40931,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[234,236,233],"class_list":["post-40932","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-namibia","tag-namibia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Govt to spend N$2,4b on second phase of Neckartal Dam project - Namibia<\/title>\n<meta name=\"description\" content=\"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Govt to spend N$2,4b on second phase of Neckartal Dam project\" \/>\n<meta property=\"og:description\" content=\"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\" \/>\n<meta property=\"og:site_name\" content=\"Namibia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-10T18:18:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-10T18:31:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Govt to spend N$2,4b on second phase of Neckartal Dam project\",\"datePublished\":\"2023-03-10T18:18:03+00:00\",\"dateModified\":\"2023-03-10T18:31:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\"},\"wordCount\":430,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg\",\"keywords\":[\"africa press\",\"Africa Press-Namibia\",\"namibia\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\",\"name\":\"Govt to spend N$2,4b on second phase of Neckartal Dam project - Namibia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg\",\"datePublished\":\"2023-03-10T18:18:03+00:00\",\"dateModified\":\"2023-03-10T18:31:26+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg\",\"width\":1280,\"height\":720,\"caption\":\"Govt to spend N$2,4b on second phase of Neckartal Dam project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/namibia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Govt to spend N$2,4b on second phase of Neckartal Dam project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/\",\"name\":\"Namibia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Govt to spend N$2,4b on second phase of Neckartal Dam project - Namibia","description":"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","og_locale":"en_US","og_type":"article","og_title":"Govt to spend N$2,4b on second phase of Neckartal Dam project","og_description":"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...","og_url":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","og_site_name":"Namibia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-03-10T18:18:03+00:00","article_modified_time":"2023-03-10T18:31:26+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Govt to spend N$2,4b on second phase of Neckartal Dam project","datePublished":"2023-03-10T18:18:03+00:00","dateModified":"2023-03-10T18:31:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project"},"wordCount":430,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg","keywords":["africa press","Africa Press-Namibia","namibia"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","url":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project","name":"Govt to spend N$2,4b on second phase of Neckartal Dam project - Namibia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg","datePublished":"2023-03-10T18:18:03+00:00","dateModified":"2023-03-10T18:31:26+00:00","author":{"@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"THE second phase of the ongoing multibillion-dollar Neckartal irrigation project will cost taxpayers an additional N$2,4 ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#primaryimage","url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg","contentUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/03\/postQueueImg_1678460156.57.jpg","width":1280,"height":720,"caption":"Govt to spend N$2,4b on second phase of Neckartal Dam project"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/govt-to-spend-n24b-on-second-phase-of-neckartal-dam-project#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/namibia\/"},{"@type":"ListItem","position":2,"name":"Govt to spend N$2,4b on second phase of Neckartal Dam project"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/namibia\/#website","url":"https:\/\/www.africa-press.net\/namibia\/","name":"Namibia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/40932","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/comments?post=40932"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/40932\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media\/40931"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media?parent=40932"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/categories?post=40932"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/tags?post=40932"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}