{"id":43780,"date":"2023-04-27T17:06:14","date_gmt":"2023-04-27T17:06:14","guid":{"rendered":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported"},"modified":"2023-04-27T18:24:55","modified_gmt":"2023-04-27T18:24:55","slug":"70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","title":{"rendered":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Namibia. <\/strong><\/span>THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter of life and death for workers who operate on TransNamib\u2019s railway lines. While the 27th of April marks a week for two families robbed of their breadwinners, the national rail liner is still busy cleaning up the manganese spilled by the train which derailed between Aus and Lu\u0308deritz.<\/p>\n<p>According to statistics provided by the national rail liner\u2019s spokesperson, Abigail Raubenheimer, TransNamib has had three deaths due to serious derailments, and 12 other deaths in train-related incidents over the past five years. In addition to this, the rail liner has reported approximately 200 derailments over the past five years, with three to four serious mainline derailments.<\/p>\n<p>Raubenheimer explained that there is currently an internal investigation underway to assess what caused the accident on the railway line between Aus and Lu\u0308deritz, which had been fixed after a recent derailment in March 2023. \u201cThe aged and deteriorating state of the railway infrastructure seriously hampers our operations, as well as the outdated equipment, which is why the acquisition of rolling stock needs to be urgently addressed,\u201d Raubenheimer said. However, she added that the renovation is the responsibility of the government, through the Ministry of Works and Transport.<\/p>\n<p>Robert Kalomo, Namibia\u2019s Director of Railway Affairs in the Ministry of Works and Transport, commenting on the state of Namibia\u2019s railway lines, explained that the total length of the national railway network is about 2,687 km. \u201cOf this, only about 30% is in either A or B standard, that is in reasonably good standard. The remaining 70% needs to be upgraded to bring it to the SADC minimum requirement of 18.5 ton\/per axle load standard,\u201d Kalomo said.<\/p>\n<p>He added that measures taken by the government and by TransNamib include securing adequate funding for the improvement of the infrastructure and operating equipment. \u201cFunding for government activities is the mandate of the Ministry of Finance and Public Enterprises. The overall government objective is to have a modern, efficient, and reliable railway transport infrastructure; hence initiatives are always underway to ensure infrastructure improvement. Just recently, the government completed the upgrading of the railway line from Walvis Bay Station to Kranzberg Station (224 km),\u201d Kalomo said.<\/p>\n<p>In the recent budget motivation speech, the Minister of Works and Transport, John Mutorwa, indicated that a total budget of close to N$2.9 billion dollars would be required for the Department of Transport. From this total, the minister explained that under the Railways Network Development and Rehabilitation program, a total amount of N$562 would be budgeted for this department. \u201cThe purpose of this program is to ensure the provision of railway transportation services or logistics by rehabilitating through a phased approach and to develop new railway infrastructures that guarantee seamless, efficient, affordable, customer-friendly, and environmentally responsive integrated railway transportation solutions. The specific objectives of this program are planning and constructing new railway lines, maintaining and upgrading existing aged railway networks to the SADC standards for Railway lines (18.5 ton\/axle with a minimum speed of 100 km\/h),\u201d the minister explained.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/namibia\">Namibia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Namibia. THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter of life and death for workers who operate on TransNamib\u2019s railway lines. While the 27th of April marks a week for two families robbed of their breadwinners, the national rail liner is still busy cleaning up [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":43778,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[234,236,233],"class_list":["post-43780","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-namibia","tag-namibia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported - Namibia<\/title>\n<meta name=\"description\" content=\"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported\" \/>\n<meta property=\"og:description\" content=\"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\" \/>\n<meta property=\"og:site_name\" content=\"Namibia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-27T17:06:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-27T18:24:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported\",\"datePublished\":\"2023-04-27T17:06:14+00:00\",\"dateModified\":\"2023-04-27T18:24:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\"},\"wordCount\":537,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg\",\"keywords\":[\"africa press\",\"Africa Press-Namibia\",\"namibia\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\",\"name\":\"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported - Namibia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg\",\"datePublished\":\"2023-04-27T17:06:14+00:00\",\"dateModified\":\"2023-04-27T18:24:55+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg\",\"width\":1000,\"height\":450,\"caption\":\"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/namibia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/\",\"name\":\"Namibia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported - Namibia","description":"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","og_locale":"en_US","og_type":"article","og_title":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported","og_description":"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...","og_url":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","og_site_name":"Namibia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-04-27T17:06:14+00:00","article_modified_time":"2023-04-27T18:24:55+00:00","og_image":[{"width":1000,"height":450,"url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported","datePublished":"2023-04-27T17:06:14+00:00","dateModified":"2023-04-27T18:24:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported"},"wordCount":537,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg","keywords":["africa press","Africa Press-Namibia","namibia"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","url":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported","name":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported - Namibia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg","datePublished":"2023-04-27T17:06:14+00:00","dateModified":"2023-04-27T18:24:55+00:00","author":{"@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"THE substantial backlog in the development, maintenance, and rehabilitation of rail infrastructure has become a matter o ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#primaryimage","url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg","contentUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/04\/postQueueImg_1682599035.53.jpg","width":1000,"height":450,"caption":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/70-of-transnamibs-rail-infrastructure-not-up-to-standard-as-up-to-200-derailments-and-15-deaths-reported#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/namibia\/"},{"@type":"ListItem","position":2,"name":"70% of TransNamib\u2019s rail infrastructure not up to standard as up to 200 derailments and 15 deaths reported"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/namibia\/#website","url":"https:\/\/www.africa-press.net\/namibia\/","name":"Namibia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/43780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/comments?post=43780"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/43780\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media\/43778"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media?parent=43780"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/categories?post=43780"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/tags?post=43780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}