{"id":59136,"date":"2023-11-28T06:20:07","date_gmt":"2023-11-28T06:20:07","guid":{"rendered":"https:\/\/www.africa-press.net\/namibia\/?p=59136"},"modified":"2023-11-28T05:30:40","modified_gmt":"2023-11-28T05:30:40","slug":"construction-of-daures-green-village-on-track","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track","title":{"rendered":"Construction of Daures Green Village on track"},"content":{"rendered":"<p><b>Maihapa Ndjavera<\/b><\/p>\n<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Namibia. <\/strong><\/span>The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction.<\/p>\n<p>Jerome Namaseb, the consortium CEO, anticipates that production will begin in June 2024.<\/p>\n<p>The green hydrogen revolution in Namibia is getting closer to reality.<\/p>\n<p>This puts Namibia on the path to developing renewable energy on a wide scale at a low cost, creating models for maintaining fiscal revenue maximisation and local development in renewable energy investments, and producing green ammonia.<\/p>\n<p>The Daures Green Hydrogen Consortium last year secured a N$220 million grant from the German Federal Ministry of Education and Research to implement a Daures Green Hydrogen Village project in that constituency. Last week, media practitioners had a site visit at the village, where the CEO stated that phase one includes the pilot project which is from 2022 \u2013 2024; phase 1.5 follows from 2024 \u2013 2027, where green fertiliser production starts; phase two includes the regional and international export of green ammonia from 2029 \u2013 2032; and phase three, which is beyond 2032, is for the international export of green ammonia.<\/p>\n<p>The project is expected to integrate application technologies for the utilisation of green hydrogen in agriculture, ammonia nitrate and cleaning detergents and fuel cell-operated centre pivots, boreholes and houses.<\/p>\n<p>\u201cTo date, we have experienced some challenges. But on a whole, the project is moving as anticipated. We have lost some construction days due to the wind conditions on site, which has resulted in one or two delays,\u201d said Namaseb.<\/p>\n<p>Other challenges they anticipate will be the sourcing of skilled labour who have prior experience in running a hydrogen and ammonia-producing facility.<\/p>\n<p>Water was one of the project\u2019s major challenges, although the CEO noted that they will be using groundwater in the interim.<\/p>\n<p>\u201cIn the long run, we conducted a feasibility analysis to determine whether it would be feasible to obtain water from the ocean or the 130-kilometre distance Erongo Desalination Plan,\u201d said Namaseb.<\/p>\n<p>Earlier this year, Erongo governor Neville Andre pined his hopes on this project to address poverty, unemployment, housing and social challenges the region faces.<\/p>\n<p>He said the project, which was launched earlier this year, has the potential to transform not only the economy of the region, but also grant rural communities in the Daures constituency the opportunity to become shareholders.<\/p>\n<p>\u201cThere is hope for employment, housing and infrastructure. Therefore, I want to urge you to support the project so that we make it a success. The region\u2019s growth trajectory indicates that there are new opportunities in mining, oil and gas, manufacturing, green hydrogen and ammonia and nuclear energy in the agricultural sector, as well as the prospect of value-addition in our dimension stone.<\/p>\n<p>Hence, we as leaders should continue our current trend, as it is pleasant to see that we put our region first, regardless of our political affiliation,\u201d Andre said at the time.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/namibia\">Namibia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Maihapa Ndjavera Africa-Press &#8211; Namibia. The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, the consortium CEO, anticipates that production will begin in June 2024. The green hydrogen revolution in Namibia is getting closer to reality. This puts Namibia on the path to developing renewable energy on a [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":59135,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[234,236,233],"class_list":["post-59136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-namibia","tag-namibia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction of Daures Green Village on track - Namibia<\/title>\n<meta name=\"description\" content=\"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of Daures Green Village on track\" \/>\n<meta property=\"og:description\" content=\"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\" \/>\n<meta property=\"og:site_name\" content=\"Namibia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-28T06:20:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"473\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Construction of Daures Green Village on track\",\"datePublished\":\"2023-11-28T06:20:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\"},\"wordCount\":483,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg\",\"keywords\":[\"africa press\",\"Africa Press-Namibia\",\"namibia\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\",\"name\":\"Construction of Daures Green Village on track - Namibia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg\",\"datePublished\":\"2023-11-28T06:20:07+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg\",\"width\":720,\"height\":473,\"caption\":\"Construction of Daures Green Village on track\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/namibia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of Daures Green Village on track\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/namibia\/\",\"name\":\"Namibia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction of Daures Green Village on track - Namibia","description":"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track","og_locale":"en_US","og_type":"article","og_title":"Construction of Daures Green Village on track","og_description":"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...","og_url":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track","og_site_name":"Namibia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-11-28T06:20:07+00:00","og_image":[{"width":720,"height":473,"url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Construction of Daures Green Village on track","datePublished":"2023-11-28T06:20:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track"},"wordCount":483,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg","keywords":["africa press","Africa Press-Namibia","namibia"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track","url":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track","name":"Construction of Daures Green Village on track - Namibia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/namibia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg","datePublished":"2023-11-28T06:20:07+00:00","author":{"@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The multimillion-dollar Daures green hydrogen project is roughly 66% of the way through construction. Jerome Namaseb, t ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#primaryimage","url":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg","contentUrl":"https:\/\/static.africa-press.net\/nambia\/sites\/29\/2023\/11\/sm_1701136777.312085.jpg","width":720,"height":473,"caption":"Construction of Daures Green Village on track"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/namibia\/all-news\/construction-of-daures-green-village-on-track#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/namibia\/"},{"@type":"ListItem","position":2,"name":"Construction of Daures Green Village on track"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/namibia\/#website","url":"https:\/\/www.africa-press.net\/namibia\/","name":"Namibia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/namibia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/namibia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/59136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/comments?post=59136"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/posts\/59136\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media\/59135"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/media?parent=59136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/categories?post=59136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/namibia\/wp-json\/wp\/v2\/tags?post=59136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}