{"id":14575,"date":"2019-08-24T14:41:35","date_gmt":"2019-08-24T14:41:35","guid":{"rendered":"https:\/\/www.africa-press.com\/nigeria\/?p=14575"},"modified":"2019-08-24T14:41:35","modified_gmt":"2019-08-24T14:41:35","slug":"slowed-work-on-lagos-ibadan-rail-amaechi","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi","title":{"rendered":"slowed work on Lagos-Ibadan rail \u2013 Amaechi"},"content":{"rendered":"<p>The\u00a0<a href=\"https:\/\/www.premiumtimesng.com\/news\/top-news\/347812-breaking-buhari-assigns-portfolios-to-new-ministers.html\">Minister of Transportation,<\/a>\u00a0Rotimi Amaechi, said the need for new approvals is responsible for the slow pace of work on the new Lagos-Ibadan standard gauge railway line.<\/p>\n<p>Mr Amaechi said this on Friday evening while briefing journalists after the inspection of the project.<\/p>\n<p>He inspected the project in the company of the Managing Director, Nigerian Railway Corporation (NRC), Fidet Okhiria and Chairman, Board of Directors, NRC, Ibrahim Al-Hassan-Musa.<\/p>\n<p><a href=\"https:\/\/en.wikipedia.org\/wiki\/News_Agency_of_Nigeria\">The News Agency of Nigeria<\/a> (NAN) reports that the inspection was coming barely 48 hours after the inauguration of the new Federal Executive Council by President <a href=\"https:\/\/www.africa-press.com\/nigeria\/photo\/buhari-inaugurates-ministers\">Muhammadu Buhari<\/a>.<\/p>\n<p>Mr Amaechi commenced the inspection at 8:50 a.m. by visiting Costain area where a bridge is being constructed and later moved to inspect the overpass at Asade level crossing at Agege.<\/p>\n<p>The minister also inspected construction works at the 10 stations along the 156-kilometre rail line corridor which included Apapa, Kajola, Papalanto, Abeokuta and Omi Adio, among others.<\/p>\n<p>Mr Amaechi, however, expressed dissatisfaction with the level of work done in most of the sites visited and advised the contractor, China Civil Engineering Construction Corporation (CCECC), to speed up work on the project before his next visit on September 23.<\/p>\n<p>The minister said that the slow down of work was too visible at the Lagos end of the project, saying it was due to lack of approval of extra works that were needed to be done.<\/p>\n<div class=\"code-block code-block-8\">\n<div class=\"directcampaign\">\n<p>\u201cThey (contractors) cannot commence work until they get those approvals. We will go to the cabinet quickly and get those approvals so that they can continue with their construction,\u201d he said.<\/p>\n<p>He also cited delays in payment as another reason for the slow down, saying that the contractors were waiting for a minister to approve their payments.<\/p>\n<p>\u201cOur appeal is that they should please hurry up and get into the seaports so that we can evacuate the goods at the seaports, we should at least be able to reduce what people refer to as Apapa gridlock.\u201d<\/p>\n<p>The minister denied giving December as the deadline to deliver the project, saying that he only wished that the project would be completed by December this year.<\/p>\n<p>\u201cIf the contractors have been given money earlier and secure those approvals, the pace of work would have increased and my wish would have been a reality.<\/p>\n<p>\u201cWhat we are saying is that they (contractors) need approvals from the cabinet and luckily that cabinet is in place now for the President to approve.<\/p>\n<p>\u201cWe will request for those approvals for the extra work they need to put in place. Once we get those approvals, the speed will increase,\u201d he added.<\/p>\n<p>The minister assured Nigerians that very soon, train services would begin to run from Lagos to Ibadan, stressing that the project was nearing completion.<\/p>\n<p>\u201cWe also agreed with them (contractors) to have between September and October, two major groundbreaking ceremonies, one is the University at Daura, the University of Transportation which we think it is going to be in September and then a groundbreaking ceremony at Kajola.<\/p>\n<p>\u201cWe are insisting that they (contractors) cannot continue to manufacture coaches, locomotive and wagons in China and be giving to us.<\/p>\n<p>\u201cSo, as part of one of the benefits we get out of the contract we have given them, they will build a factory in Kajola by October where they will begin to manufacture wagons for now.<\/p>\n<p>\u201cFrom then, they will progress from wagons to locomotive and coaches and Nigerians will understudy them.\u201d<\/p>\n<p>On the loan for the Ibadan-Kano rail project, Mr Amaechi said that the Federal Government was ready and only waiting for the Chinese to approve the loan.<\/p>\n<p>\u201cIf the loan is approved, we will commence construction. Certainly, it is desirable, the president is eager for the project. We need to construct that of Ibadan to Kano,\u201d he said.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The\u00a0Minister of Transportation,\u00a0Rotimi Amaechi, said the need for new approvals is responsible for the slow pace of work on the new Lagos-Ibadan standard gauge railway line. Mr Amaechi said this on Friday evening while briefing journalists after the inspection of the project. He inspected the project in the company of the Managing Director, Nigerian Railway [&hellip;]<\/p>\n","protected":false},"author":62,"featured_media":1812,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,15],"tags":[250,787,68,176],"class_list":["post-14575","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-amaechi","tag-ccecc","tag-efcc","tag-nan"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>slowed work on Lagos-Ibadan rail \u2013 Amaechi - Nigeria<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"slowed work on Lagos-Ibadan rail \u2013 Amaechi\" \/>\n<meta property=\"og:description\" content=\"The\u00a0Minister of Transportation,\u00a0Rotimi Amaechi, said the need for new approvals is responsible for the slow pace of work on the new Lagos-Ibadan standard gauge railway line. Mr Amaechi said this on Friday evening while briefing journalists after the inspection of the project. He inspected the project in the company of the Managing Director, Nigerian Railway [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\" \/>\n<meta property=\"og:site_name\" content=\"Nigeria\" \/>\n<meta property=\"article:published_time\" content=\"2019-08-24T14:41:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"550\" \/>\n\t<meta property=\"og:image:height\" content=\"322\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"alico\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"alico\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\"},\"author\":{\"name\":\"alico\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\"},\"headline\":\"slowed work on Lagos-Ibadan rail \u2013 Amaechi\",\"datePublished\":\"2019-08-24T14:41:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\"},\"wordCount\":636,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg\",\"keywords\":[\"Amaechi\",\"CCECC\",\"EFCC\",\"NAN\"],\"articleSection\":[\"all news\",\"Economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\",\"name\":\"slowed work on Lagos-Ibadan rail \u2013 Amaechi - Nigeria\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg\",\"datePublished\":\"2019-08-24T14:41:35+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg\",\"width\":550,\"height\":322},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/nigeria\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"slowed work on Lagos-Ibadan rail \u2013 Amaechi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/\",\"name\":\"Africa Press | Nigeria | Homepage\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\",\"name\":\"alico\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/author\/alico\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"slowed work on Lagos-Ibadan rail \u2013 Amaechi - Nigeria","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi","og_locale":"en_US","og_type":"article","og_title":"slowed work on Lagos-Ibadan rail \u2013 Amaechi","og_description":"The\u00a0Minister of Transportation,\u00a0Rotimi Amaechi, said the need for new approvals is responsible for the slow pace of work on the new Lagos-Ibadan standard gauge railway line. Mr Amaechi said this on Friday evening while briefing journalists after the inspection of the project. He inspected the project in the company of the Managing Director, Nigerian Railway [&hellip;]","og_url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi","og_site_name":"Nigeria","article_published_time":"2019-08-24T14:41:35+00:00","og_image":[{"width":550,"height":322,"url":"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg","type":"image\/jpeg"}],"author":"alico","twitter_card":"summary_large_image","twitter_misc":{"Written by":"alico","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi"},"author":{"name":"alico","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7"},"headline":"slowed work on Lagos-Ibadan rail \u2013 Amaechi","datePublished":"2019-08-24T14:41:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi"},"wordCount":636,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg","keywords":["Amaechi","CCECC","EFCC","NAN"],"articleSection":["all news","Economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi","url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi","name":"slowed work on Lagos-Ibadan rail \u2013 Amaechi - Nigeria","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg","datePublished":"2019-08-24T14:41:35+00:00","author":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#primaryimage","url":"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg","contentUrl":"https:\/\/static.africa-press.net\/upload\/sites\/3\/2019\/01\/Amaechi-Umana.jpg","width":550,"height":322},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/slowed-work-on-lagos-ibadan-rail-amaechi#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/nigeria\/"},{"@type":"ListItem","position":2,"name":"slowed work on Lagos-Ibadan rail \u2013 Amaechi"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/nigeria\/#website","url":"https:\/\/www.africa-press.net\/nigeria\/","name":"Africa Press | Nigeria | Homepage","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7","name":"alico","url":"https:\/\/www.africa-press.net\/nigeria\/author\/alico"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/14575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/comments?post=14575"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/14575\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media\/1812"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media?parent=14575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/categories?post=14575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/tags?post=14575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}