{"id":17708,"date":"2019-11-07T16:06:52","date_gmt":"2019-11-07T16:06:52","guid":{"rendered":"https:\/\/www.africa-press.com\/nigeria\/?p=17708"},"modified":"2019-11-07T16:06:52","modified_gmt":"2019-11-07T16:06:52","slug":"senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","title":{"rendered":"Senate blows hot over failed N7.7 billion water dam contract in Niger"},"content":{"rendered":"<p>The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in <a href=\"https:\/\/en.wikipedia.org\/wiki\/Niger_State\">Niger State<\/a>, despite the receipt of funding to the tune of N7.7 billion from the Federal Government.<\/p>\n<p>In a motion sponsored by Senator Musa Mohammed Sani representing Niger North Senatorial district alongside nineteen others, the upper chamber said, the contract has failed after non completion in seventeen years.<\/p>\n<p>The Kagara Water Dam, which is located in Niger State, was awarded to WRECA in 1999, but remain uncompleted due to alleged non release of funds.<\/p>\n<p>In her contribution, Senator Uche Ekwunife, called for termination of the contract, saying that the contractor lacked capacity to executive that contract.<\/p>\n<p>Senator Musa in the motion revealed that the FG took over the project in order to provide portable water and irrigation to Kagara and its environs, which was re-awarded to Biwater Shellaber (Nig.) Limited in December, 1992 at the cost of N199, 222,596.<\/p>\n<p>The lawmaker said the project suffered neglect because of lack of funding, which necessitated its renegotiation in the year 2001 at the cost of N2,219,746,244.75.<\/p>\n<p>He further disclosed that the Upper Niger River Basin Development Authority, which is the supervising agency, issued a revised estimated cost to complete the project in the year 2010 pegged at N5,555,416,689.78.<\/p>\n<p>\u201cIf this project continues to be operated in a \u2018stop and go\u2019 manner, the dream of our people for portable water and economic empowerment through irrigation farming will remain a mirage,\u201d Senator Musa said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State, despite the receipt of funding to the tune of N7.7 billion from the Federal Government. In a motion sponsored by Senator Musa Mohammed Sani representing Niger North Senatorial district [&hellip;]<\/p>\n","protected":false},"author":62,"featured_media":16765,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,29,14],"tags":[701,761,53],"class_list":["post-17708","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-head-lines","category-policy","tag-fg","tag-niger-state","tag-senate"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Senate blows hot over failed N7.7 billion water dam contract in Niger - Nigeria<\/title>\n<meta name=\"description\" content=\"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Senate blows hot over failed N7.7 billion water dam contract in Niger\" \/>\n<meta property=\"og:description\" content=\"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\" \/>\n<meta property=\"og:site_name\" content=\"Nigeria\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-07T16:06:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"alico\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"alico\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\"},\"author\":{\"name\":\"alico\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\"},\"headline\":\"Senate blows hot over failed N7.7 billion water dam contract in Niger\",\"datePublished\":\"2019-11-07T16:06:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\"},\"wordCount\":261,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg\",\"keywords\":[\"FG\",\"Niger state\",\"senate\"],\"articleSection\":[\"all news\",\"head lines\",\"Policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\",\"name\":\"Senate blows hot over failed N7.7 billion water dam contract in Niger - Nigeria\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg\",\"datePublished\":\"2019-11-07T16:06:52+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\"},\"description\":\"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/nigeria\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Senate blows hot over failed N7.7 billion water dam contract in Niger\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/\",\"name\":\"Africa Press | Nigeria | Homepage\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7\",\"name\":\"alico\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/author\/alico\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Senate blows hot over failed N7.7 billion water dam contract in Niger - Nigeria","description":"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","og_locale":"en_US","og_type":"article","og_title":"Senate blows hot over failed N7.7 billion water dam contract in Niger","og_description":"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State","og_url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","og_site_name":"Nigeria","article_published_time":"2019-11-07T16:06:52+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg","type":"image\/jpeg"}],"author":"alico","twitter_card":"summary_large_image","twitter_misc":{"Written by":"alico","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger"},"author":{"name":"alico","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7"},"headline":"Senate blows hot over failed N7.7 billion water dam contract in Niger","datePublished":"2019-11-07T16:06:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger"},"wordCount":261,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg","keywords":["FG","Niger state","senate"],"articleSection":["all news","head lines","Policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger","name":"Senate blows hot over failed N7.7 billion water dam contract in Niger - Nigeria","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg","datePublished":"2019-11-07T16:06:52+00:00","author":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7"},"description":"The Senate at its plenary on Thursday ordered its Committee on Water Resources to investigate the delay in the execution of Kagara dam in Niger State","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#primaryimage","url":"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg","contentUrl":"https:\/\/static.africa-press.net\/nigeria\/2019\/10\/senate2-5da5cf403bc41.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/senate-blows-hot-over-failed-n7-7-billion-water-dam-contract-in-niger#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/nigeria\/"},{"@type":"ListItem","position":2,"name":"Senate blows hot over failed N7.7 billion water dam contract in Niger"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/nigeria\/#website","url":"https:\/\/www.africa-press.net\/nigeria\/","name":"Africa Press | Nigeria | Homepage","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/50afd2ef4f0e900bd0a176404a8484a7","name":"alico","url":"https:\/\/www.africa-press.net\/nigeria\/author\/alico"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/17708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/comments?post=17708"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/17708\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media\/16765"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media?parent=17708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/categories?post=17708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/tags?post=17708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}