{"id":75204,"date":"2022-10-29T12:17:34","date_gmt":"2022-10-29T11:17:34","guid":{"rendered":"https:\/\/www.africa-press.net\/nigeria\/uncategorized\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister"},"modified":"2022-10-29T12:17:34","modified_gmt":"2022-10-29T11:17:34","slug":"zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","title":{"rendered":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Nigeria. <\/strong><\/span>The Minister of Power, Engr. Abubakar Aliyu, has announced that the 700 megawatts Zungeru Hydroelectric Power Project located in Niger State will be commissioned in the first quarter of 2023.<\/p>\n<p>The dam is estimated to cost $1.2 billion and is expected to add 700 megawatts of electricity to the national grid.<\/p>\n<p>Aliyu made the disclosure during an inspection visit to the Power Plant in Zungeru, Niger State.<\/p>\n<p>The Minister, accompanied by the Secretary to the Government of Niger State (SSG), Ahmed Ibrahim Matane, at the inspection, said the project is at the 98% completion stage.<\/p>\n<p>Engr. Aliyu, who went around the major operating units of the power project, pointed out that.<\/p>\n<p>\u201cThe Zungeru project is at 98 percent completion stage. Presently, work on the three of the turbines each producing 175 Mega Watts of electricity has been completed and tested\u201d.<\/p>\n<p>Expressing satisfaction with the level of commitment exhibited by the contractors, he assured that the completion of the Zungeru Project would add 700 Mega Watts to the national grid.<\/p>\n<p>According to him, \u201cthe Zungeru Power Project was part of Federal Government strategies to reposition power generation in phases in the country\u201d.<\/p>\n<p>The Secretary to the Government of Niger State (SSG), Ahmed Ibrahim Matane, said the state government has shown a high level of commitment to the implementation of the project.<\/p>\n<p>\u201cThe Zungeru Power Project is a multi-purpose electricity project that has abundant agricultural potential for the host communities to harness,\u201d he noted.<\/p>\n<p>Similarly, the Project Manager, Mr. Abiy Getahun, who took the Minister around the project and his entourage, assured that work would be completed on schedule, adding that insecurity that hindered the smooth running of the project has been tackled.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/nigeria\">Nigeria<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Nigeria. The Minister of Power, Engr. Abubakar Aliyu, has announced that the 700 megawatts Zungeru Hydroelectric Power Project located in Niger State will be commissioned in the first quarter of 2023. The dam is estimated to cost $1.2 billion and is expected to add 700 megawatts of electricity to the national grid. Aliyu [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":75203,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,30],"tags":[1571,1570,2140,254,9030],"class_list":["post-75204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-1571","tag-africa-press","tag-africa-press-nigeria-2","tag-nigeria","tag-zungeru-hydroelectric-dam"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister - Nigeria<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister\" \/>\n<meta property=\"og:description\" content=\"Africa-Press &#8211; Nigeria. The Minister of Power, Engr. Abubakar Aliyu, has announced that the 700 megawatts Zungeru Hydroelectric Power Project located in Niger State will be commissioned in the first quarter of 2023. The dam is estimated to cost $1.2 billion and is expected to add 700 megawatts of electricity to the national grid. Aliyu [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\" \/>\n<meta property=\"og:site_name\" content=\"Nigeria\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-29T11:17:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister\",\"datePublished\":\"2022-10-29T11:17:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\"},\"wordCount\":295,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg\",\"keywords\":[\"2023\",\"Africa Press\",\"Africa Press-Nigeria\",\"Nigeria\",\"Zungeru hydroelectric dam\"],\"articleSection\":[\"all news\",\"Community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\",\"name\":\"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister - Nigeria\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg\",\"datePublished\":\"2022-10-29T11:17:34+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg\",\"width\":1280,\"height\":853,\"caption\":\"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/nigeria\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#website\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/\",\"name\":\"Africa Press | Nigeria | Homepage\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"url\":\"https:\/\/www.africa-press.net\/nigeria\/author\/cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister - Nigeria","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","og_locale":"en_US","og_type":"article","og_title":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister","og_description":"Africa-Press &#8211; Nigeria. The Minister of Power, Engr. Abubakar Aliyu, has announced that the 700 megawatts Zungeru Hydroelectric Power Project located in Niger State will be commissioned in the first quarter of 2023. The dam is estimated to cost $1.2 billion and is expected to add 700 megawatts of electricity to the national grid. Aliyu [&hellip;]","og_url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","og_site_name":"Nigeria","article_published_time":"2022-10-29T11:17:34+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister","datePublished":"2022-10-29T11:17:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister"},"wordCount":295,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg","keywords":["2023","Africa Press","Africa Press-Nigeria","Nigeria","Zungeru hydroelectric dam"],"articleSection":["all news","Community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","url":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister","name":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister - Nigeria","isPartOf":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg","datePublished":"2022-10-29T11:17:34+00:00","author":{"@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#primaryimage","url":"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg","contentUrl":"https:\/\/static.africa-press.net\/nigeria\/sites\/3\/2022\/10\/postQueueImg_6-635d2036371ec.jpg","width":1280,"height":853,"caption":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/nigeria\/all-news\/zungeru-hydroelectric-dam-will-be-ready-first-quarter-of-2023-minister#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/nigeria\/"},{"@type":"ListItem","position":2,"name":"Zungeru hydroelectric dam will be ready first quarter of 2023 \u2013 Minister"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/nigeria\/#website","url":"https:\/\/www.africa-press.net\/nigeria\/","name":"Africa Press | Nigeria | Homepage","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/nigeria\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/nigeria\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","url":"https:\/\/www.africa-press.net\/nigeria\/author\/cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/75204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/comments?post=75204"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/posts\/75204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media\/75203"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/media?parent=75204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/categories?post=75204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/nigeria\/wp-json\/wp\/v2\/tags?post=75204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}