{"id":22108,"date":"2022-07-14T14:35:48","date_gmt":"2022-07-14T14:35:48","guid":{"rendered":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years"},"modified":"2022-07-14T15:05:47","modified_gmt":"2022-07-14T15:05:47","slug":"kigali-to-get-stormwater-master-plan-in-two-years","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years","title":{"rendered":"Kigali to get stormwater master plan in two years"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Rwanda. <\/strong><\/span>Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 that is expected to be complete by 2024 so as to mitigate floods in the city.<\/p>\n<p>Stormwater is surface water in abnormal quantities resulting from heavy falls of rain. The floods are usually triggered by poor drainage systems, engineers said.<\/p>\n<p>The Kigali Stormwater master plan is the plan which shows how the city will be able to manage floods by improving the drainage system.<\/p>\n<p>According to engineers, the storm water master plan could help develop centralized drainage systems.<\/p>\n<p>The development was revealed on July 13 as members of the Senate Committee on Economic Development and Finance were assessing urban informal settlement and urbanization issues in the city of Kigali.<\/p>\n<p>\u201cWe have seen some rehabilitated drainages in different settlements and this should be scaled up across the city,\u201d suggested Senator Marie Rose Mureshyankwano.<\/p>\n<p>Senator Juv\u00e9nal Nkusi, the Chairperson of Committee on Economic Development and finance added, \u201cWe have realized that rehabilitating Mpazi drainage has really reduced floods in the past two years. The floods are caused by stormwater from different areas and settlements in the city. There is need for a centralized drainage system to manage stormwater so it easily flows into water bodies without damages.\u201d<\/p>\n<p><b>Virgile Mugisha, the Project Engineer at Rwanda Urban Development Project (right), interacts with the team of senators who toured a series of city projects on July 13. Photo: Courtesy.<\/b><\/p>\n<p>He suggested that the storm water management master plan be developed based on long-term rain projections.<\/p>\n<p>While responding to senators\u2019 questions, Virgile Mugisha, the Project Engineer at Rwanda Urban Development Project financed by World Bank in the City of Kigali said that at least $1 million is going to be invested in developing rainwater management master plan adding that $200,000 will also help to set up flood sensors.<\/p>\n<p>Floods sensors will be set up in different areas of the city to detect water levels to be able to come up with measures to prevent floods.<\/p>\n<p>\u201cWe have realized that every neighbourhood has a water channel or drainage. The stormwater master plan will assess the situation of every neighborhood. This means that some drainages or water channels that drain rainwater are not even necessary.<\/p>\n<p>We can therefore merge some drainages to have different centralized drainage systems that convey rainwater into wetlands and other water bodies. Improving drainages could help curb floods across the city,\u201d he said.<\/p>\n<p>He added that by improving drainages according to the storm water master plan, it will be part of upgrading other informal settlements.<\/p>\n<p>\u201cWhen we are upgrading informal settlements we also improve drainage as we did it under Agatare project in Nyarugenge district,\u201d he said.<\/p>\n<p>Mugisha said that managing stormwater will also go along with wetlands rehabilitation and conservation.<\/p>\n<p>\u201cThis is because wetlands are there to retain stormwater and thus curb floods. Without stormwater management, more infrastructure could be still damaged by flooding,\u201d he said.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/rwanda\">Rwanda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Rwanda. Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 that is expected to be complete by 2024 so as to mitigate floods in the city. Stormwater is surface water in abnormal quantities resulting from heavy falls of rain. The floods are usually [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":22107,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,30,28],"tags":[760,763,758],"class_list":["post-22108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","category-homepage-english","tag-africa-press","tag-africa-press-rwanda","tag-rwanda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kigali to get stormwater master plan in two years - Rwanda<\/title>\n<meta name=\"description\" content=\"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kigali to get stormwater master plan in two years\" \/>\n<meta property=\"og:description\" content=\"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\" \/>\n<meta property=\"og:site_name\" content=\"Rwanda\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-14T14:35:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-14T15:05:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1556\" \/>\n\t<meta property=\"og:image:height\" content=\"918\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Kigali to get stormwater master plan in two years\",\"datePublished\":\"2022-07-14T14:35:48+00:00\",\"dateModified\":\"2022-07-14T15:05:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\"},\"wordCount\":508,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Rwanda\",\"Rwanda\"],\"articleSection\":[\"all news\",\"Community\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\",\"url\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\",\"name\":\"Kigali to get stormwater master plan in two years - Rwanda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg\",\"datePublished\":\"2022-07-14T14:35:48+00:00\",\"dateModified\":\"2022-07-14T15:05:47+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg\",\"width\":1556,\"height\":918,\"caption\":\"Kigali to get stormwater master plan in two years\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/rwanda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kigali to get stormwater master plan in two years\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/rwanda\/\",\"name\":\"Rwanda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/rwanda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kigali to get stormwater master plan in two years - Rwanda","description":"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years","og_locale":"en_US","og_type":"article","og_title":"Kigali to get stormwater master plan in two years","og_description":"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...","og_url":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years","og_site_name":"Rwanda","article_published_time":"2022-07-14T14:35:48+00:00","article_modified_time":"2022-07-14T15:05:47+00:00","og_image":[{"width":1556,"height":918,"url":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Kigali to get stormwater master plan in two years","datePublished":"2022-07-14T14:35:48+00:00","dateModified":"2022-07-14T15:05:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years"},"wordCount":508,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg","keywords":["Africa Press","Africa Press-Rwanda","Rwanda"],"articleSection":["all news","Community","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years","url":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years","name":"Kigali to get stormwater master plan in two years - Rwanda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/rwanda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg","datePublished":"2022-07-14T14:35:48+00:00","dateModified":"2022-07-14T15:05:47+00:00","author":{"@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Over $1 million (over Rwf1 billion) is set to be invested in developing the Kigali \u2018Stormwater Management Master Plan\u2019 t ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#primaryimage","url":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg","contentUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2022\/07\/postQueueImg_24-62d030a135898.jpg","width":1556,"height":918,"caption":"Kigali to get stormwater master plan in two years"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/rwanda\/all-news\/kigali-to-get-stormwater-master-plan-in-two-years#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/rwanda\/"},{"@type":"ListItem","position":2,"name":"Kigali to get stormwater master plan in two years"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/rwanda\/#website","url":"https:\/\/www.africa-press.net\/rwanda\/","name":"Rwanda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/rwanda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts\/22108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/comments?post=22108"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts\/22108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/media\/22107"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/media?parent=22108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/categories?post=22108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/tags?post=22108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}