{"id":53485,"date":"2023-09-25T16:28:46","date_gmt":"2023-09-25T16:28:46","guid":{"rendered":"https:\/\/www.africa-press.net\/rwanda\/all-news\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction"},"modified":"2023-09-25T16:51:03","modified_gmt":"2023-09-25T16:51:03","slug":"expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","title":{"rendered":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction"},"content":{"rendered":"<p><b> Michel Nkurunziza<\/b><\/p>\n<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Rwanda. <\/strong><\/span>The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindiro-Masizi-Birembo-Gasanze road.<\/p>\n<p>This road forms a crucial part of the Kigali Infrastructure Project (KIP), which aims to establish a 215-kilometer road network and multiple bridges by 2024, according to Merard Mpabwanamaguru, the Vice-Mayor in charge of urbanization and infrastructure for the City of Kigali.<\/p>\n<p>City officials have estimated that over 2,009 households may need to be expropriated to facilitate the road construction.<\/p>\n<p>The Zindiro-Masizi-Birembo-Gasanze road is one of the planned road developments across various sectors of the capital, totaling 70 kilometers.<\/p>\n<p>Situated in the Bumbogo, Kinyinya, and Nduba sectors, this 10.4-kilometer stretch is already in the design phase, awaiting the completion of expropriation procedures.<\/p>\n<p>&#8220;We have assessed properties belonging to more than 700 individuals. Compensation will be provided promptly before commencing construction,&#8221; Mpabwanamaguru said.<\/p>\n<p>Officials emphasize that the timing of expropriation largely hinges on residents&#8217; cooperation and their willingness to provide the necessary documents for expropriation and compensation.<\/p>\n<p>&#8220;The completion of this road holds strategic significance, as it will facilitate the movement of vehicles from the industrial zone in Masoro to Gicumbi district and further to Gatuna, which serves as the Rwanda-Uganda border,&#8221; Ezechiel Munyarugendo, a resident of the Bumbogo sector said.<\/p>\n<p>He also highlighted the road&#8217;s potential to ease travel for passengers heading to Nyagatare district.<\/p>\n<p>&#8220;The road will enable vehicles from the special economic zone to travel seamlessly from Gasanze, Gicumbi, Rukomo to Nyagatare. This project promises economic returns by enhancing trade at both the national and regional levels,&#8221; he added.<\/p>\n<p>In addition to the Zindiro-Masizi-Birembo-Gasanze road, the City of Kigali plans to construct 300 kilometers of feeder roads within the capital, aiming to address the public transport challenges faced by residents in various suburban areas of Kigali.<\/p>\n<p>This development comes at a time when residents in different outskirts of Kigali are expressing concerns about transportation bottlenecks that hinder their access to the Central Business District.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/rwanda\">Rwanda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Michel Nkurunziza Africa-Press &#8211; Rwanda. The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindiro-Masizi-Birembo-Gasanze road. This road forms a crucial part of the Kigali Infrastructure Project (KIP), which aims to establish a 215-kilometer road network and multiple bridges by 2024, according to Merard Mpabwanamaguru, [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":53484,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,15],"tags":[760,763,758],"class_list":["post-53485","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-rwanda","tag-rwanda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction - Rwanda<\/title>\n<meta name=\"description\" content=\"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction\" \/>\n<meta property=\"og:description\" content=\"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\" \/>\n<meta property=\"og:site_name\" content=\"Rwanda\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-25T16:28:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-25T16:51:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"663\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction\",\"datePublished\":\"2023-09-25T16:28:46+00:00\",\"dateModified\":\"2023-09-25T16:51:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\"},\"wordCount\":342,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Rwanda\",\"Rwanda\"],\"articleSection\":[\"all news\",\"Economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\",\"url\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\",\"name\":\"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction - Rwanda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg\",\"datePublished\":\"2023-09-25T16:28:46+00:00\",\"dateModified\":\"2023-09-25T16:51:03+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg\",\"width\":1000,\"height\":663,\"caption\":\"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/rwanda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/rwanda\/\",\"name\":\"Rwanda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/rwanda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction - Rwanda","description":"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","og_locale":"en_US","og_type":"article","og_title":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction","og_description":"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...","og_url":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","og_site_name":"Rwanda","article_published_time":"2023-09-25T16:28:46+00:00","article_modified_time":"2023-09-25T16:51:03+00:00","og_image":[{"width":1000,"height":663,"url":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction","datePublished":"2023-09-25T16:28:46+00:00","dateModified":"2023-09-25T16:51:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction"},"wordCount":342,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg","keywords":["Africa Press","Africa Press-Rwanda","Rwanda"],"articleSection":["all news","Economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","url":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction","name":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction - Rwanda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/rwanda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg","datePublished":"2023-09-25T16:28:46+00:00","dateModified":"2023-09-25T16:51:03+00:00","author":{"@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The City of Kigali has cited ongoing expropriation delays as a major obstacle to advancing the construction of the Zindi ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#primaryimage","url":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg","contentUrl":"https:\/\/static.africa-press.net\/rwanda\/sites\/23\/2023\/09\/sm_1695647987.066817.jpg","width":1000,"height":663,"caption":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/rwanda\/economy\/expropriation-delays-zindiro-masizi-birembo-gasanze-road-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/rwanda\/"},{"@type":"ListItem","position":2,"name":"Expropriation delays Zindiro-Masizi-Birembo-Gasanze road construction"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/rwanda\/#website","url":"https:\/\/www.africa-press.net\/rwanda\/","name":"Rwanda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/rwanda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/rwanda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts\/53485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/comments?post=53485"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/posts\/53485\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/media\/53484"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/media?parent=53485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/categories?post=53485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/rwanda\/wp-json\/wp\/v2\/tags?post=53485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}