{"id":6100,"date":"2022-05-31T15:41:44","date_gmt":"2022-05-31T15:41:44","guid":{"rendered":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13"},"modified":"2022-05-31T16:10:11","modified_gmt":"2022-05-31T16:10:11","slug":"guma-replaces-major-components-on-main-dam-at-mile-13","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13","title":{"rendered":"Guma Replaces Major Components on Main Dam at Mile 13"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Sierra-Leone. <\/strong><\/span>The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gate Valves at the Guma Dam Tunnel at Mile 13.<br \/>\n<a name=\"aswift_2_expand\"><\/a><\/p>\n<p>According to Guma the replacement of these valves that were installed in the mid 1960s is one of the Works packages under the Freetown Water Supply Rehabilitation Project funded by UKAid.<\/p>\n<p>The replacement of the leaking Scour and Gates Valves at the Guma Dam is expected to save about 6 million liters of water per day, enough water to serve 50,000 people<\/p>\n<p>The main objective of the Freetown Water Supply Rehabilitation Project is to improve the reliability of the water supply for the citizens of Freetown, through rehabilitation of the water supply infrastructure and reduction of leakages for improved and reliable access to safe water supply.<\/p>\n<p>Planning, Research and Development Manager of Guma Valley Water Company, Ing Ibrahim C. Bah, said the replacement of the Scour and Gate Valves is another major milestone reached by Guma. He added that the replaced valves have been seriously leaking, leading to loss of millions of liters of water every day.<\/p>\n<p>\u201cIt was not safe to do scouring of the dam because of the old age of the scour valve, but with the new valves, the risk of the valves failing or not functioning correctly has been reduced significantly for the next fifty years, at least\u201d Ing Bah asserted<\/p>\n<p>.Over 90% of the water supply to Freetown is supplied from the Guma Dam reservoir and Main Water Treatment Plant at Mile 13. The Guma Dam was built in the 60s and can only reliably provide water supply to the population it was built for at that time around 800,000. The current population of Freetown approaches 2 million.<br \/>\n<a name=\"aswift_5_expand\"><\/a><\/p>\n<p>The rehabilitation project will increase sustainable access to water supply in Freetown, with the expected impact being a reduction of morbidity and mortality rates associated with incidences of diarrhea, typhoid and other water-borne diseases.<\/p>\n<p>Meanwhile, work is ongoing to replace 3.2Km of aged transmission pipe line from Mile 13 to Hamilton.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/sierra-leone\">Sierra-Leone<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Sierra-Leone. The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gate Valves at the Guma Dam Tunnel at Mile 13. According to Guma the replacement of these valves that were installed in the mid 1960s is one of the Works packages under the Freetown [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":6099,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[291,293,292],"class_list":["post-6100","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-africa-press-sierra-leone","tag-sierra-leone"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Guma Replaces Major Components on Main Dam at Mile 13 - Sierra Leone<\/title>\n<meta name=\"description\" content=\"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guma Replaces Major Components on Main Dam at Mile 13\" \/>\n<meta property=\"og:description\" content=\"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\" \/>\n<meta property=\"og:site_name\" content=\"Sierra Leone\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-31T15:41:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-31T16:10:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1660\" \/>\n\t<meta property=\"og:image:height\" content=\"830\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Guma Replaces Major Components on Main Dam at Mile 13\",\"datePublished\":\"2022-05-31T15:41:44+00:00\",\"dateModified\":\"2022-05-31T16:10:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\"},\"wordCount\":355,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Sierra-Leone\",\"Sierra-Leone\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\",\"url\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\",\"name\":\"Guma Replaces Major Components on Main Dam at Mile 13 - Sierra Leone\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg\",\"datePublished\":\"2022-05-31T15:41:44+00:00\",\"dateModified\":\"2022-05-31T16:10:11+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg\",\"width\":1660,\"height\":830,\"caption\":\"Guma Replaces Major Components on Main Dam at Mile 13\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/sierra-leone\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Guma Replaces Major Components on Main Dam at Mile 13\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#website\",\"url\":\"https:\/\/www.africa-press.net\/sierra-leone\/\",\"name\":\"Sierra Leone\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/sierra-leone\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Guma Replaces Major Components on Main Dam at Mile 13 - Sierra Leone","description":"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13","og_locale":"en_US","og_type":"article","og_title":"Guma Replaces Major Components on Main Dam at Mile 13","og_description":"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...","og_url":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13","og_site_name":"Sierra Leone","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-05-31T15:41:44+00:00","article_modified_time":"2022-05-31T16:10:11+00:00","og_image":[{"width":1660,"height":830,"url":"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Guma Replaces Major Components on Main Dam at Mile 13","datePublished":"2022-05-31T15:41:44+00:00","dateModified":"2022-05-31T16:10:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13"},"wordCount":355,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg","keywords":["Africa Press","Africa Press-Sierra-Leone","Sierra-Leone"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13","url":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13","name":"Guma Replaces Major Components on Main Dam at Mile 13 - Sierra Leone","isPartOf":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg","datePublished":"2022-05-31T15:41:44+00:00","dateModified":"2022-05-31T16:10:11+00:00","author":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The Guma Valley Water Company and its partners have successfully completed the replacements of the leaking Scour and Gat ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#primaryimage","url":"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg","contentUrl":"https:\/\/static.africa-press.net\/sierra-leone\/sites\/16\/2022\/05\/postQueueImg_3-62963dcb5757d.jpg","width":1660,"height":830,"caption":"Guma Replaces Major Components on Main Dam at Mile 13"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/sierra-leone\/all-news\/guma-replaces-major-components-on-main-dam-at-mile-13#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/sierra-leone\/"},{"@type":"ListItem","position":2,"name":"Guma Replaces Major Components on Main Dam at Mile 13"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/sierra-leone\/#website","url":"https:\/\/www.africa-press.net\/sierra-leone\/","name":"Sierra Leone","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/sierra-leone\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/sierra-leone\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/posts\/6100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/comments?post=6100"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/posts\/6100\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/media\/6099"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/media?parent=6100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/categories?post=6100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/sierra-leone\/wp-json\/wp\/v2\/tags?post=6100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}