{"id":35270,"date":"2022-08-12T19:19:15","date_gmt":"2022-08-12T19:19:15","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services"},"modified":"2022-08-12T19:24:27","modified_gmt":"2022-08-12T19:24:27","slug":"kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","title":{"rendered":"KZN flood victims still waiting on eThekwini for municipal services"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Africa. <\/strong><\/span>Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required from municipal authorities in Durban to install services to be connected to proposed temporary residential units.<\/p>\n<p>According to officials, engagements with the City of eThekwini\u2019s water and sanitation department are ongoing.<\/p>\n<p>On Friday, Cooperative Governance and Traditional Affairs Minister Nkosazana Dlamini-Zuma presented to Parliament her department\u2019s progress in its response to the April floods in KwaZulu-Natal and parts of the Eastern Cape that claimed the lives of more than 300 people.<\/p>\n<p>READ | Gungubele reveals why municipalities, departments have delayed applying for flood relief funds<\/p>\n<p>Jurgens Dyssel, senior manager for legislation, policy and compliance management at the National Disaster Management Centre, told MPs on the Ad Hoc Joint Committee on Flood Disaster Relief and Recovery that repair cost would run into the billions.<\/p>\n<p>\u201cThe estimation and verification of damaged and costing [in KZN] have been completed. Twenty-seven wastewater treatment works in eThekwini were damaged; 75 water infrastructure and 62 sewer infrastructure facilities. R2.214 billion is estimated for short-term emergency repairs.<\/p>\n<p>&#8220;[A] long-term \u2018building back better\u2019 scenario is estimated to require R7.734 billion. A war room was established and mobilised about 250 personnel to address KZN water sector damages. Updates show substantial progress in resolving water provision in five major regions in eThekwini. Of all the regions, the south region is the one that is still presenting challenges,\u201d he said.<\/p>\n<p>Dyssel said the designs would be in line with the permanent solution to follow later.<\/p>\n<p>\u201cIntervention is still required from the City of eThekwini on the installation of services to connect proposed TRUs [temporary residential units]. Engagements with the eThekwini Water and Sanitation Department are ongoing. Phase 2 procurement for the construction of additional TRUs has been cleared by provincial treasury and real-time auditors,\u201d he said in a presentation.<\/p>\n<p>Fraud and IT experts to police KZN flood relief funds, AG vows to keep spending in check<\/p>\n<p>Dyssel said challenges were also reported for the restoration of water provision to specific facilities.<\/p>\n<p>\u201cKZN has been requested to provide a list of healthcare facilities that still depend on water takers for the water supplies and a plan on how they are to be resolved. The health and water sectors must work together on this issue,\u201d he said.<\/p>\n<p>Furthermore, he said 736 temporary residential units were handed over to families for occupation in phase 1.<\/p>\n<p>\u201cThere are eight sites identified for TRUs in eThekwini Metro [and] three will fall within the north region and five in the west region. Eight sites with completed layouts will yield a total of 1074 TRUs, including ablution blocks. The total anticipated yield will be confirmed once all layouts are completed. Preliminary engineering designs process [are] under way for all sites,\u201d he said.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required from municipal authorities in Durban to install services to be connected to proposed temporary residential units. According to officials, engagements with the City of eThekwini\u2019s water and sanitation department are ongoing. On Friday, Cooperative Governance and [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":35269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3,8],"tags":[274,315,285,1434,355,286,2038,275],"class_list":["post-35270","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","category-homepage-english","tag-africa-press","tag-africa-press-south-africa","tag-durban","tag-floods","tag-housing","tag-kwazulu-natal","tag-nkosazana-dlamini-zuma-3","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KZN flood victims still waiting on eThekwini for municipal services - South Africa<\/title>\n<meta name=\"description\" content=\"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KZN flood victims still waiting on eThekwini for municipal services\" \/>\n<meta property=\"og:description\" content=\"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-12T19:19:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-12T19:24:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"KZN flood victims still waiting on eThekwini for municipal services\",\"datePublished\":\"2022-08-12T19:19:15+00:00\",\"dateModified\":\"2022-08-12T19:24:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\"},\"wordCount\":475,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"durban\",\"floods\",\"housing\",\"kwazulu-natal\",\"nkosa\u00adzana dlamini-zuma\",\"South-Africa\"],\"articleSection\":[\"all news\",\"community\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\",\"name\":\"KZN flood victims still waiting on eThekwini for municipal services - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg\",\"datePublished\":\"2022-08-12T19:19:15+00:00\",\"dateModified\":\"2022-08-12T19:24:27+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg\",\"width\":1024,\"height\":683,\"caption\":\"KZN flood victims still waiting on eThekwini for municipal services\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KZN flood victims still waiting on eThekwini for municipal services\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KZN flood victims still waiting on eThekwini for municipal services - South Africa","description":"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","og_locale":"en_US","og_type":"article","og_title":"KZN flood victims still waiting on eThekwini for municipal services","og_description":"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-08-12T19:19:15+00:00","article_modified_time":"2022-08-12T19:24:27+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"KZN flood victims still waiting on eThekwini for municipal services","datePublished":"2022-08-12T19:19:15+00:00","dateModified":"2022-08-12T19:24:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services"},"wordCount":475,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg","keywords":["Africa Press","Africa Press-South-Africa","durban","floods","housing","kwazulu-natal","nkosa\u00adzana dlamini-zuma","South-Africa"],"articleSection":["all news","community","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services","name":"KZN flood victims still waiting on eThekwini for municipal services - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg","datePublished":"2022-08-12T19:19:15+00:00","dateModified":"2022-08-12T19:24:27+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Four months after devastating floods in KwaZulu-Natal swept away thousands of houses, \u201cintervention\u201d is still required f ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2022\/08\/postQueueImg_4-62f6a8c857807.jpg","width":1024,"height":683,"caption":"KZN flood victims still waiting on eThekwini for municipal services"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kzn-flood-victims-still-waiting-on-ethekwini-for-municipal-services#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"KZN flood victims still waiting on eThekwini for municipal services"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/35270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=35270"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/35270\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/35269"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=35270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=35270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=35270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}