{"id":45754,"date":"2023-03-15T12:12:16","date_gmt":"2023-03-15T12:12:16","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding"},"modified":"2023-03-15T12:45:52","modified_gmt":"2023-03-15T12:45:52","slug":"eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","title":{"rendered":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Africa. <\/strong><\/span>Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide emission limits at the Kusile power station in a bid to alleviate South Africa&#8217;s severe electricity crisis.<\/p>\n<p>Subject to several conditions, Creecy on Tuesday exempted Eskom from amending its Atmospheric Emission Licence to reflect these additional emissions from the Kusile, subject to certain strict conditions.<\/p>\n<p>Eskom was granted the exemption \u2013 in terms of Section 59 of the National Environmental Management: Air Quality Act \u2013 in relation to a temporary solution to restore lost generation capacity at Kusile while a damaged stack undergoes repairs which are due for completion in December 2024.<\/p>\n<p>In the interim, Eskom plans to construct the temporary stacks by November 2023, which will be operated without the use of the Flue Gas Desulphurisation mechanism for 13 months.<\/p>\n<p>This will likely result in increased sulphur dioxide emissions during this period, in excess of the current applicable limit in Kusile&#8217;s Atmospheric Emission License.<\/p>\n<p>The temporary solution will, however, allow for the resumption of generation capacity of 2 100MW, which will reduce the country&#8217;s exposure to load shedding by two levels, Creecy noted.<\/p>\n<p>Creecy said she was aware of the well-documented socioeconomic impacts of load shedding, which have had far-reaching socioeconomic consequences for all South Africans.<\/p>\n<p>&#8220;I am equally aware of the health and associated impacts of exposure to sulphur dioxide emissions, particularly on communities in close proximity to coal-fired power stations,&#8221; the minister said. &#8220;In the light of the competing factors, I have been called on to make an extraordinarily difficult decision.&#8221;<\/p>\n<p>Accordingly, the exemption has been granted subject to several conditions.<\/p>\n<p>Eskom must issue a public notice in two national newspapers explaining reasons for their application, and must also conduct a public participation process subject to a curtailed timeframe of 14 days.<\/p>\n<p>The utility will also have to account to Creecy and the parliamentary portfolio committee on forestry, fisheries and the environment on the progress of its repair to the damaged stack.<\/p>\n<p>Eskom must further take measures to mitigate against the exposure of its employees and surrounding communities to harm. At a minimum, this must include independent health screenings and referral to appropriate public health facilities for treatment where necessary.<\/p>\n<p>Creecy&#8217;s department said Eskom will now need to apply to the National Air Quality Officer for a once-off postponement with the compliance timeframes for minimum emission standards for new plants. The once-off postponement with the compliance timeframes for minimum emission standards for new plants can only be valid until 31 March 2025, in terms of the applicable regulations.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide emission limits at the Kusile power station in a bid to alleviate South Africa&#8217;s severe electricity crisis. Subject to several conditions, Creecy on Tuesday exempted Eskom from amending its Atmospheric Emission Licence to reflect these [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":45753,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[274,315,1150,4801,4767,3412,127,1213,303,275],"class_list":["post-45754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-south-africa","tag-barbara-creecy","tag-carbon-dioxide","tag-dffe","tag-emissions","tag-eskom","tag-just-energy-transition","tag-load-shedding","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Eskom allowed to exceed emission limits at Kusile, to reduce load shedding - South Africa<\/title>\n<meta name=\"description\" content=\"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding\" \/>\n<meta property=\"og:description\" content=\"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-15T12:12:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-15T12:45:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding\",\"datePublished\":\"2023-03-15T12:12:16+00:00\",\"dateModified\":\"2023-03-15T12:45:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\"},\"wordCount\":446,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"barbara creecy\",\"carbon dioxide\",\"dffe\",\"emissions\",\"Eskom\",\"just energy transition\",\"load shedding\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\",\"name\":\"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg\",\"datePublished\":\"2023-03-15T12:12:16+00:00\",\"dateModified\":\"2023-03-15T12:45:52+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg\",\"width\":1440,\"height\":1080,\"caption\":\"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding - South Africa","description":"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","og_locale":"en_US","og_type":"article","og_title":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding","og_description":"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-03-15T12:12:16+00:00","article_modified_time":"2023-03-15T12:45:52+00:00","og_image":[{"width":1440,"height":1080,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding","datePublished":"2023-03-15T12:12:16+00:00","dateModified":"2023-03-15T12:45:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding"},"wordCount":446,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg","keywords":["Africa Press","Africa Press-South-Africa","barbara creecy","carbon dioxide","dffe","emissions","Eskom","just energy transition","load shedding","South-Africa"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding","name":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg","datePublished":"2023-03-15T12:12:16+00:00","dateModified":"2023-03-15T12:45:52+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Forestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/03\/postQueueImg_1678869740.31.jpg","width":1440,"height":1080,"caption":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-allowed-to-exceed-emission-limits-at-kusile-to-reduce-load-shedding#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"Eskom allowed to exceed emission limits at Kusile, to reduce load shedding"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/45754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=45754"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/45754\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/45753"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=45754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=45754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=45754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}