{"id":49138,"date":"2023-06-01T20:09:42","date_gmt":"2023-06-01T20:09:42","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes"},"modified":"2023-06-01T21:31:39","modified_gmt":"2023-06-01T21:31:39","slug":"kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","title":{"rendered":"Kaunda&#8217;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Africa. <\/strong><\/span>It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and avoid being put under administration, and on the other was its attempt to ensure that tariffs were not increased exceedingly amid tough economic conditions.<\/p>\n<p>In the end, the R65.5-billion budget Mayor Mxolisi Kaunda tabled for the metro on Wednesday, which he described as &#8220;pro-poor&#8221;, received the nod from the majority party, so much so that councillors danced and sang in jubilation.<\/p>\n<p>Kaunda said although the City &#8220;feels the pain&#8221; for residents, tariffs had to increase due to global economic conditions and other factors.<\/p>\n<p>The eThekwini metro is in the clutches of a Section 154 intervention by the national government after a string of governance issues.<\/p>\n<p>If the metro&#8217;s authorities don&#8217;t buckle down and turn things around, the metro could be put under administration.<\/p>\n<p>Kaunda dished out R953 million for human settlements in eThekwini, which has almost 600 informal settlements.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and avoid being put under administration, and on the other was its attempt to ensure that tariffs were not increased exceedingly amid tough economic conditions. In the end, the R65.5-billion [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":49136,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,7,8,377],"tags":[274,315,285,286,2703,998,500,275],"class_list":["post-49138","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-head-lines","category-homepage-english","category-to-homepage","tag-africa-press","tag-africa-press-south-africa","tag-durban","tag-kwazulu-natal","tag-local-government","tag-mxolisi-kaunda","tag-service-delivery","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kaunda&#039;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes - South Africa<\/title>\n<meta name=\"description\" content=\"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kaunda&#039;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes\" \/>\n<meta property=\"og:description\" content=\"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-01T20:09:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-01T21:31:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Kaunda&#8217;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes\",\"datePublished\":\"2023-06-01T20:09:42+00:00\",\"dateModified\":\"2023-06-01T21:31:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\"},\"wordCount\":192,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"durban\",\"kwazulu-natal\",\"local government\",\"mxolisi kaunda\",\"service delivery\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\",\"head lines\",\"homepage-english\",\"to-homepage\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\",\"name\":\"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg\",\"datePublished\":\"2023-06-01T20:09:42+00:00\",\"dateModified\":\"2023-06-01T21:31:39+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kaunda&#8217;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes - South Africa","description":"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","og_locale":"en_US","og_type":"article","og_title":"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes","og_description":"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-06-01T20:09:42+00:00","article_modified_time":"2023-06-01T21:31:39+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Kaunda&#8217;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes","datePublished":"2023-06-01T20:09:42+00:00","dateModified":"2023-06-01T21:31:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes"},"wordCount":192,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg","keywords":["Africa Press","Africa Press-South-Africa","durban","kwazulu-natal","local government","mxolisi kaunda","service delivery","South-Africa"],"articleSection":["all news","economy","head lines","homepage-english","to-homepage"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes","name":"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg","datePublished":"2023-06-01T20:09:42+00:00","dateModified":"2023-06-01T21:31:39+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"It was a delicate balancing act: On the one side was its aim to turn things around in the embattled eThekwini metro and ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/06\/sm_1685638753.244489.jpg","width":1024,"height":683,"caption":"Kaunda's R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/kaundas-r65bn-ethekwini-budget-gets-the-nod-stage-7-load-shedding-a-reality-for-industrial-nodes#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"Kaunda&#8217;s R65bn eThekwini budget gets the nod, Stage 7 load shedding a reality for industrial nodes"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/49138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=49138"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/49138\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/49136"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=49138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=49138"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=49138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}