{"id":58483,"date":"2023-12-24T16:06:16","date_gmt":"2023-12-24T16:06:16","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station"},"modified":"2023-12-24T16:33:46","modified_gmt":"2023-12-24T16:33:46","slug":"big-shift-at-eskoms-worst-performing-power-station","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station","title":{"rendered":"Big shift at Eskom\u2019s worst-performing power station"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Africa. <\/strong><\/span>The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed the worst-performing station in the fleet.<\/p>\n<p>Speaking to the Sunday Times, the GM, Bruce Moyo, mentioned improvements at the plant, although things were far from where they needed to be.<\/p>\n<p>According to Moyo, when his team took over operations at the plant earlier this year, it had an energy availability factor of only 6%, and the amount of neglect was \u201cstaggering\u201d.<\/p>\n<p>Since then, EAF has improved, and at one point, the station had four units online and operating \u2013 although only two are operating currently.<\/p>\n<p>Despite the setbacks, workers are increasingly motivated and set on making the plant work \u2013 a significant shift from the atmosphere a year ago.<\/p>\n<p>Tutuka made headlines earlier this year when former Eskom CEO Andre de Ruyter told the Standing Committee on Public Accounts (Scopa) of the problems that had beset the station.<\/p>\n<p>He told the committee that criminality was rife in the area (Standerton, Mpumalanga) and that the station itself was besieged by criminal elements.<\/p>\n<p>\u201cThe station\u2019s manager has to wear a bulletproof vest when walking the stations and is accompanied by two bodyguards. His wife has bodyguards, and his children go to school with bodyguards \u2013 all as a result of threats being made on his life,\u201d de Ruyter said at the time.<\/p>\n<p>According to Moyo, unlike his predecessor, he does not wear a bulletproof vest to work \u2013 an indication that relations have improved.<\/p>\n<p>However, he keeps his family\u2019s location under wraps and prefers that it is not known by anyone working at the station \u2013 an indication that security worries persist.<\/p>\n<p>Tutuka was identified alongside five other stations this year as being \u201cproblem\u201d stations. The others included Duva, Mejuba, Kusile, Matla and Kendal.<\/p>\n<p>Moyo has previous experience with Duva and Kendal, which reportedly formed part of a cluster where he and his team helped with recovery efforts (the other being Camden).<\/p>\n<p>Eskom has spent much of 2023 on these recovery efforts at many of its stations. Kusile has seen some significant success, its downed units coming back online in the latter months of the year, helping to ease the capacity burden on the grid.<\/p>\n<p>This has resulted in a slight recovery in the group\u2019s overall EAF.<\/p>\n<p>The energy availability factor shows the percentage of time the power station was available for use when it was needed. It is a core measure of performance.<\/p>\n<p>If the EAF can be improved to around 70%, load-shedding will be a thing of the past, and South Africa will have electricity security.<\/p>\n<p>Despite the improvements, the power utility\u2019s goal of hitting 65% EAF by March 2024 is still way off. In fact, the group has not successfully consistently hit the 60% EAF target set for March 2023.<\/p>\n<p>The group had come the closest to achieving this target in October when EAF breached the 60% level \u2013 but this was incredibly short-lived.<\/p>\n<p>The latest data compiled by independent energy analyst Pieter Jordaan shows that the power company is struggling to get further than an EAF of 55%.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed the worst-performing station in the fleet. Speaking to the Sunday Times, the GM, Bruce Moyo, mentioned improvements at the plant, although things were far from where they needed to be. According to [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":58482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[274,315,275],"class_list":["post-58483","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-south-africa","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Big shift at Eskom\u2019s worst-performing power station - South Africa<\/title>\n<meta name=\"description\" content=\"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Big shift at Eskom\u2019s worst-performing power station\" \/>\n<meta property=\"og:description\" content=\"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-24T16:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-24T16:33:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Big shift at Eskom\u2019s worst-performing power station\",\"datePublished\":\"2023-12-24T16:06:16+00:00\",\"dateModified\":\"2023-12-24T16:33:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\"},\"wordCount\":529,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\",\"name\":\"Big shift at Eskom\u2019s worst-performing power station - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg\",\"datePublished\":\"2023-12-24T16:06:16+00:00\",\"dateModified\":\"2023-12-24T16:33:46+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg\",\"width\":800,\"height\":533,\"caption\":\"Big shift at Eskom\u2019s worst-performing power station\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Big shift at Eskom\u2019s worst-performing power station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Big shift at Eskom\u2019s worst-performing power station - South Africa","description":"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station","og_locale":"en_US","og_type":"article","og_title":"Big shift at Eskom\u2019s worst-performing power station","og_description":"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-12-24T16:06:16+00:00","article_modified_time":"2023-12-24T16:33:46+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Big shift at Eskom\u2019s worst-performing power station","datePublished":"2023-12-24T16:06:16+00:00","dateModified":"2023-12-24T16:33:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station"},"wordCount":529,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg","keywords":["Africa Press","Africa Press-South-Africa","South-Africa"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station","name":"Big shift at Eskom\u2019s worst-performing power station - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg","datePublished":"2023-12-24T16:06:16+00:00","dateModified":"2023-12-24T16:33:46+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The new general manager of the Tutuka Power Stations says that things are slowly improving at what was earlier dubbed th ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2023\/12\/sm_1703422544.690787.jpg","width":800,"height":533,"caption":"Big shift at Eskom\u2019s worst-performing power station"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/big-shift-at-eskoms-worst-performing-power-station#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"Big shift at Eskom\u2019s worst-performing power station"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/58483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=58483"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/58483\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/58482"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=58483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=58483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=58483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}