{"id":63899,"date":"2024-04-06T17:08:40","date_gmt":"2024-04-06T17:08:40","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding"},"modified":"2024-04-06T17:43:56","modified_gmt":"2024-04-06T17:43:56","slug":"south-africa-now-has-16-stages-of-load-shedding","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding","title":{"rendered":"South Africa now has 16 stages of load shedding"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Africa. <\/strong><\/span>The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest document governing how load shedding is implemented in South Africa.<\/p>\n<p>The NRS 048-9 Code of Practice is primarily an electricity utility-driven and executed document that derives its mandate and authority, once approved by the National Energy Regulator of South Africa (Nersa), as part of the Electricity Regulations Act.<\/p>\n<p>When the first edition of the NRS048-9 code was established in 2010, load shedding stages were capped at Stage 4\u2014representing 25% of the base load\u2014requiring utilities to \u201cfind\u201d electricity under emergency conditions.<\/p>\n<p>The need for Stage 6 load shedding in 2019 prompted the NRS 048-9 Work Group to consider extending the load shedding stages to manage load shedding to Stage 8 (Edition 2).<\/p>\n<p>In Stage 8, half the electricity load is shed, and the other half is waiting to be shed.<\/p>\n<p>Now, with the third edition, the full load (minus critical load) is divided up into stages, which now span from stage 1 to stage 16.<\/p>\n<p>While introducing 16 stages of load shedding is the key change in the new regulations, there are many other changes, including giving more flexibility around load curtailment and making provision for smart metering.<\/p>\n<p>Braodly, the changes cover:<\/p>\n<p>Consolidation of the load shedding stages into a single system from stage 1 to 16, restricting all licensees to using this system as specified in this code of practice, or being able to explain to NERSA why they do not and how their specific system still adheres to the principles herein.<\/p>\n<p>Clarification on methods for setting baselines for curtailment customers.<\/p>\n<p>Increased control of how load shedding and load curtailment are determined and carried out, providing more stability to the network and more certainty to curtailment customers.<\/p>\n<p>Inclusion of the right for curtailment customers to reduce by 10% per stage (2 stages of load shedding), up to stage 10, 50% of their load, or to go to essential loads, depending on their own capacity, rather than being forced to essential loads after Stage 4.<\/p>\n<p>The specification of compliance and reporting requirements (general and real-time);<\/p>\n<p>Guidance on the implementation of smart metering as a technology platform for reducing the impact of load shedding on customers; and<\/p>\n<p>Extensive editorial changes to this specification.<\/p>\n<p>New load shedding stages<\/p>\n<p>The key change in the document comes in extending load shedding stages to stage 16 \u2013 but the structure of the new stages may be unfamiliar to what most South Africans have become accustomed to.<\/p>\n<p>At present, most South Africans understand each stage of load shedding to reflect 1,000MW of power that is removed from the grid.<\/p>\n<p>However, under the new structure, this is rather expressed as the percentage of demand assumed by the System Operator at the time the stage is called. The percentages range from 5% of demand at stage 1 to 80% at stage 16.<\/p>\n<p>The new edition also makes no mention of specific ranges (ie, +\/- 1,000MW) as is the case in the previous code.<\/p>\n<p>The new schedules also include the structure for customers who are part of the load curtailment programme.<\/p>\n<p>The latest edition also offers a lot more room to load shedding alternatives, including \u201ctechnology options\u201d such as curtailment using load limiting relays, which will allow for schedules to adjusted.<\/p>\n<p>For example, larger residential areas may rather be subject to curtailment than shedding for the same<\/p>\n<p>load requirement to be achieved.<\/p>\n<p>With the new guidelines published, it will be up to Eskom and municipalities to adjust their schedules to match the new requirements.<\/p>\n<p>The new stages are as follows:<br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"bin\/Users\/Hazrati\/postMediaimg_16_1.jpg\" width=\"480\" height=\"744\" \/><\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest document governing how load shedding is implemented in South Africa. The NRS 048-9 Code of Practice is primarily an electricity utility-driven and executed document that derives its mandate and authority, once approved [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":63898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[274,315,275],"class_list":["post-63899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-south-africa","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>South Africa now has 16 stages of load shedding - South Africa<\/title>\n<meta name=\"description\" content=\"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"South Africa now has 16 stages of load shedding\" \/>\n<meta property=\"og:description\" content=\"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-06T17:08:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-06T17:43:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"South Africa now has 16 stages of load shedding\",\"datePublished\":\"2024-04-06T17:08:40+00:00\",\"dateModified\":\"2024-04-06T17:43:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\"},\"wordCount\":597,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\",\"name\":\"South Africa now has 16 stages of load shedding - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg\",\"datePublished\":\"2024-04-06T17:08:40+00:00\",\"dateModified\":\"2024-04-06T17:43:56+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg\",\"width\":1200,\"height\":800,\"caption\":\"South Africa now has 16 stages of load shedding\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"South Africa now has 16 stages of load shedding\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"South Africa now has 16 stages of load shedding - South Africa","description":"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding","og_locale":"en_US","og_type":"article","og_title":"South Africa now has 16 stages of load shedding","og_description":"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-04-06T17:08:40+00:00","article_modified_time":"2024-04-06T17:43:56+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"South Africa now has 16 stages of load shedding","datePublished":"2024-04-06T17:08:40+00:00","dateModified":"2024-04-06T17:43:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding"},"wordCount":597,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg","keywords":["Africa Press","Africa Press-South-Africa","South-Africa"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding","name":"South Africa now has 16 stages of load shedding - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg","datePublished":"2024-04-06T17:08:40+00:00","dateModified":"2024-04-06T17:43:56+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The national energy regulator Nersa has published the approved the NRS 048-9 Code of Practice Edition 3 \u2013 the latest doc ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2024\/04\/sm_1712412778.605781.jpg","width":1200,"height":800,"caption":"South Africa now has 16 stages of load shedding"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/south-africa-now-has-16-stages-of-load-shedding#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"South Africa now has 16 stages of load shedding"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/63899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=63899"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/63899\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/63898"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=63899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=63899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=63899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}