{"id":6554,"date":"2021-03-17T19:51:08","date_gmt":"2021-03-17T19:51:08","guid":{"rendered":"https:\/\/www.africa-press.net\/south-africa\/?p=6554"},"modified":"2021-03-17T17:58:22","modified_gmt":"2021-03-17T17:58:22","slug":"eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","title":{"rendered":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/south-africa\">South-Africa<\/a>. <\/strong><\/span>Johannesburg &#8211; Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until at least Saturday 5am.<\/p>\n<p>The power utility announced on Tuesday that it would implement Stage 1 load shedding until Saturday 5am from Wednesday morning.<\/p>\n<p>Eskom had announced that load shedding would be reduced from Stage 2 to Stage 1 from Wednesday until Saturday after they reported that four generation units at Kusile, Grootvlei, Kriel and Matla as well as the Cahora Bassa line from Mozambique, had been restored.<\/p>\n<p>On Wednesday, Eskom apologised to the public for reinstating Stage 2 load shedding.<\/p>\n<p>\u201cThis escalation in the stage is required to safeguard the power system after a loss of generating capacity at the Medupi, Arnot, Duvha and Kendall power stations.<\/p>\n<p>\u201cIn addition to Eskom\u2019s inability to supply the full demand, we have seen an increase in demand which has put a further strain on the emergency generation reserves today,\u201d the power utility said.<\/p>\n<p>\u201cThe contributing factors for the losses of boiler tube leaks and units tripping, as well as the delay in the return to service of a single unit at the Kendall power station.<\/p>\n<p>\u201cEskom is working hard to return the units back to service as soon as possible. We currently have 6052 MW unplanned maintenance, while another 12,690 MW of capacity is unavailable due to breakdowns and delays. This has led to our inability to supply the full demand,\u201d said Eskom.<\/p>\n<p>Eskom also called on the public to continue using electricity sparingly.<\/p>\n<p>\u201cThe system remains vulnerable and unpredictable. We will communicate time asleep sleep should there be any significant changes to the power system,\u201d Eskom said.<\/p>\n<p><b>IOL<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. Johannesburg &#8211; Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until at least Saturday 5am. The power utility announced on Tuesday that it would implement Stage 1 load shedding until Saturday 5am from Wednesday morning. Eskom had announced that load shedding would be [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":6553,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[274,315,275],"class_list":["post-6554","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-africa-press-south-africa","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Eskom reinstates Stage 2 load shedding from 9pm on Wednesday - South Africa<\/title>\n<meta name=\"description\" content=\"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday\" \/>\n<meta property=\"og:description\" content=\"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-17T19:51:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"404\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday\",\"datePublished\":\"2021-03-17T19:51:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\"},\"wordCount\":283,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Africa\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\",\"name\":\"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg\",\"datePublished\":\"2021-03-17T19:51:08+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg\",\"width\":720,\"height\":404,\"caption\":\"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday - South Africa","description":"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","og_locale":"en_US","og_type":"article","og_title":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday","og_description":"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-03-17T19:51:08+00:00","og_image":[{"width":720,"height":404,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday","datePublished":"2021-03-17T19:51:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday"},"wordCount":283,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg","keywords":["Africa Press","Africa Press-South-Africa","South-Africa"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday","name":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg","datePublished":"2021-03-17T19:51:08+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Johannesburg - Power utility Eskom has announced that load shedding will revert back to Stage 2 from Wednesday 9pm until ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2021\/03\/img-60524324b9586.jpg","width":720,"height":404,"caption":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-reinstates-stage-2-load-shedding-from-9pm-on-wednesday#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"Eskom reinstates Stage 2 load shedding from 9pm on Wednesday"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/6554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=6554"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/6554\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/6553"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=6554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=6554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=6554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}