{"id":899,"date":"2020-12-13T17:26:15","date_gmt":"2020-12-13T17:26:15","guid":{"rendered":"https:\/\/www.africa-press.com\/south-africa\/?p=899"},"modified":"2020-12-13T17:26:15","modified_gmt":"2020-12-13T17:26:15","slug":"eskom-moves-to-stage-1-load-shedding-on-sunday","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday","title":{"rendered":"Eskom moves to Stage 1 load shedding on Sunday"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.com\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.com\/south-africa\">South-Africa<\/a>. <\/strong><\/span>Cape Town &#8211; Eskom will move from Stage 2 load shedding to Stage 1 on Sunday between 6am and 11pm, the state-owned power utility said.<\/p>\n<p>In a statement on Saturday, Eskom said that the emergency generation reserves recovery had showed significant progress so loadshedding would be reduced.<\/p>\n<p>\u201cIt is necessary to continue with load shedding in order to fully recover the emergency generation reserves in preparation for the coming week. Eskom will communicate timeously should there be any significant changes to the power system,\u201d it said<\/p>\n<p>\u201cWe currently have 7,914MW on planned maintenance, while another 10,468MW of capacity is unavailable due to unplanned maintenance. Eskom teams are working around the clock to return as many of these units to service as soon as possible.\u201d<\/p>\n<p>Eskom apologised for the \u201cinconvenience during this difficult period\u201d and requested South Africans to continue using electricity sparingly to help us limit the impact of loadshedding.<\/p>\n<p>Eskom, implemented Stage 2 loadshedding at 6am on Saturday morning, saying the system was severely constrained and that it needed to implement loadshedding to replenish the depleted emergency generation reserves for the coming week.<\/p>\n<p>Eskom said as it was ramping up its planned maintenance during the \u201clower demand summer period\u201d, there had been a \u201clarge number of unforeseen breakdowns from the ageing, unreliable plant over the past few days\u201d.<\/p>\n<p>\u201cIn addition to this, Eskom has taken two generation units at the Kendal Power Station offline in compliance with environmental legislation. Similarly, four generation units at the Camden Power Station have been taken offline to conserve the integrity of the ash dam facility,\u201d it said on Friday.<\/p>\n<p>On October 29 Eskom said its Unit 2 at the Kusile power station in Mpumalanga province had attained commercial operation status and would contribute up to 800 megawatts to the national grid.<\/p>\n<p>At the time, Eskom said this was the second unit at Kusile to enter commercial operation, with Unit 1 having done so in 2017.<\/p>\n<p>\u201cThe commercial operation of Unit 2 is a major milestone that signifies the progress being made by Eskom towards the completion of the Kusile Build Project, on which lie the nation\u2019s best hopes to bring stability and ensure security of electricity supply to power the South African economy,\u201d Eskom\u2019s group executive for capital projects Bheki Nxumalo said at the time.<\/p>\n<p>Eskom said construction, testing and optimisation activities on the remaining four units were progressing well, with some of them currently providing intermittent power to support the grid.<\/p>\n<p>Kusile is the first power station in South Africa and the continent to use state-of-the-art wet flue gas desulphurisation (WFGD) to remove oxides of sulphur from the exhaust flue gas in power plants that burn coal or oil.<\/p>\n<p>The utility is fitting WFGD to the Kusile plant as an atmospheric emission abatement technology to ensure compliance with air quality standards, in line with current international practice.<\/p>\n<p>Eskom, which supplies about 95 percent of South Africa\u2019s power, has struggled over the past decade to meet demand. This is largely due to frequent breakdowns in its ageing, historically badly maintained infrastructure, which have forced Eskom to implement rolling blackouts in order to avoid overwhelming the grid.<\/p>\n<p>In September, Eskom said it had suspended managers at two of its power stations after breakdowns which forced the utility to ramp up rolling blackouts earlier this week to avoid tripping the national grid.<\/p>\n<p><b>African News Agency (ANA)<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Africa. Cape Town &#8211; Eskom will move from Stage 2 load shedding to Stage 1 on Sunday between 6am and 11pm, the state-owned power utility said. In a statement on Saturday, Eskom said that the emergency generation reserves recovery had showed significant progress so loadshedding would be reduced. \u201cIt is necessary to continue [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[274,275],"class_list":["post-899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-south-africa-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Eskom moves to Stage 1 load shedding on Sunday - South Africa<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eskom moves to Stage 1 load shedding on Sunday\" \/>\n<meta property=\"og:description\" content=\"Africa-Press &#8211; South-Africa. Cape Town &#8211; Eskom will move from Stage 2 load shedding to Stage 1 on Sunday between 6am and 11pm, the state-owned power utility said. In a statement on Saturday, Eskom said that the emergency generation reserves recovery had showed significant progress so loadshedding would be reduced. \u201cIt is necessary to continue [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\" \/>\n<meta property=\"og:site_name\" content=\"South Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-13T17:26:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"650\" \/>\n\t<meta property=\"og:image:height\" content=\"366\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Eskom moves to Stage 1 load shedding on Sunday\",\"datePublished\":\"2020-12-13T17:26:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\"},\"wordCount\":565,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg\",\"keywords\":[\"Africa Press\",\"South-Africa\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\",\"name\":\"Eskom moves to Stage 1 load shedding on Sunday - South Africa\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg\",\"datePublished\":\"2020-12-13T17:26:15+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg\",\"width\":650,\"height\":366,\"caption\":\"Eskom moves to Stage 1 load shedding on Sunday\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-africa\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eskom moves to Stage 1 load shedding on Sunday\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-africa\/\",\"name\":\"South Africa\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Eskom moves to Stage 1 load shedding on Sunday - South Africa","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday","og_locale":"en_US","og_type":"article","og_title":"Eskom moves to Stage 1 load shedding on Sunday","og_description":"Africa-Press &#8211; South-Africa. Cape Town &#8211; Eskom will move from Stage 2 load shedding to Stage 1 on Sunday between 6am and 11pm, the state-owned power utility said. In a statement on Saturday, Eskom said that the emergency generation reserves recovery had showed significant progress so loadshedding would be reduced. \u201cIt is necessary to continue [&hellip;]","og_url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday","og_site_name":"South Africa","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2020-12-13T17:26:15+00:00","og_image":[{"width":650,"height":366,"url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Eskom moves to Stage 1 load shedding on Sunday","datePublished":"2020-12-13T17:26:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday"},"wordCount":565,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg","keywords":["Africa Press","South-Africa"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday","url":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday","name":"Eskom moves to Stage 1 load shedding on Sunday - South Africa","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg","datePublished":"2020-12-13T17:26:15+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#primaryimage","url":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-africa\/sites\/31\/2020\/12\/img-5fd6427d1d8a6.jpg","width":650,"height":366,"caption":"Eskom moves to Stage 1 load shedding on Sunday"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-africa\/all-news\/eskom-moves-to-stage-1-load-shedding-on-sunday#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-africa\/"},{"@type":"ListItem","position":2,"name":"Eskom moves to Stage 1 load shedding on Sunday"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-africa\/#website","url":"https:\/\/www.africa-press.net\/south-africa\/","name":"South Africa","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-africa\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/comments?post=899"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/posts\/899\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media\/898"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/media?parent=899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/categories?post=899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-africa\/wp-json\/wp\/v2\/tags?post=899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}