{"id":3045,"date":"2021-10-23T16:21:50","date_gmt":"2021-10-23T16:21:50","guid":{"rendered":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility"},"modified":"2021-10-23T16:24:31","modified_gmt":"2021-10-23T16:24:31","slug":"why-giant-turbines-are-pushing-the-limits-of-possibility","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility","title":{"rendered":"Why giant turbines are pushing the limits of possibility"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Sudan. <\/strong><\/span>Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine that will be powerful enough to provide electricity to roughly 13,000 British homes.<\/p>\n<p>It will be the biggest such turbine in the world, though potentially not for long. Wind turbines just keep getting bigger \u2013 and it\u2019s happening faster than almost anybody predicted.<\/p>\n<p>Chinese firm, MingYang, recently announced plans for an even more powerful device clocking in at 16MW, for example. Just four years ago, the maximum capacity of an offshore turbine was 8MW.<\/p>\n<p>\u201cIt\u2019s happening quicker than we would wish, in a sense,\u201d says Aur\u00e9lie Nasse, head of offshore product market strategy at Vestas. The firm is one of a handful that have led the development of super-sized turbines \u2013 but headaches associated with building ever larger machines are beginning to emerge.<\/p>\n<p>\u201cWe need to make sure it\u2019s a sustainable race for everyone in the industry,\u201d says Ms Nasse, as she points out the need for larger harbours, and the necessary equipment and installation vessels required to bring today\u2019s huge turbine components offshore.<\/p>\n<p>Then there\u2019s the hefty investments required to get to that point. \u201cIf you look at the financial results of the [manufacturers], basically none of us make money anymore,\u201d explains Ms Nasse. \u201cThat\u2019s a big risk.\u201d<\/p>\n<p>Yet the wind industry\u2019s willingness to push limits is one of its greatest strengths, she adds. A double-edged sword, or turbine blade, if you will. And there are few signs that the race to 20MW turbines and beyond is about to slow down.<\/p>\n<p>\u201cIt\u2019s just astonishing,\u201d says Guy Dorrell, a spokesman for Siemens Gamesa, referring to the fact that a single offshore wind farm can now power a million homes. By the end of this year, his firm plans to install an onshore prototype of a 14MW offshore turbine that can be boosted to supply 15MW.<\/p>\n<p>\u201cWe\u2019ve worked out that a single turn of a 14MW turbine would power a Tesla Model 3 for 352km (218 miles),\u201d he says. Besides heightened power output, one of the advantages of bigger turbines is that they are more efficient in terms of installation time and cost \u2013 clearly, you only need one base structure and set of cables for a 14MW turbine versus two for a pair of 7MW machines.<\/p>\n<p>The UK currently has about 10.5 gigawatts (GW) of offshore wind capacity and this is set to quadruple by 2030. But that still isn\u2019t enough to deliver net-zero electricity by 2035, according to researchers at Imperial College, London.<\/p>\n<p>Whatever happens next the demand is there and you can bet that bigger turbines will become more commonplace, says Christoph Zipf, a spokesman for Wind Europe, an industry body. Twenty years from now, 15MW turbines will be viewed as \u201caverage\u201d, he predicts.<\/p>\n<p>It may happen even sooner than that. The UK\u2019s newest offshore wind projects, planned for Dogger Bank in the middle of the North Sea, are already set to use 13 and 14MW turbines.<\/p>\n<p>But surely there are limits to how large these structures can get? They are already mind-boggling. Each blade on Vestas\u2019 15MW turbine is 115.5m (379ft) long \u2013 nearly as long as London\u2019s Centre Point tower is high. The turbine itself has a rotor diameter of 236m (London\u2019s tallest building, The Shard, is 310m tall).<\/p>\n<p>\u201cThere has to be a physical limit although nobody has yet put a number on that,\u201d says Simon Hogg, at Durham University. Prof Hogg holds the \u00d8rsted chair at the university, which is funded by energy firm \u00d8rsted.<\/p>\n<p>Instead, it\u2019s the practicalities of putting these machines in place and maintaining them that might first become problematic. Prof Deborah Greaves at Plymouth University says of super-sized offshore turbines, \u201cThere are still open questions around the cumulative environmental impact and the capacity of the marine environment.\u201d<\/p>\n<p>Wind turbines do have some negative effects on wildlife but the extent of this, at scale, is difficult to measure. Plus, very large wind farms at sea must be sited carefully to avoid conflict with shipping lanes.<\/p>\n<p>Prof Hogg adds that the cost of maintaining hundreds of very large turbines, miles offshore could go up over time. \u201cSomething like that, may be the defining driver as to how big offshore wind turbines can actually get,\u201d he says.<\/p>\n<p>Then there are the technical niggles. The really big turbines tend to be positioned far away from land but that means the electricity they generate must travel huge distances.<\/p>\n<p>When transmitted using alternating current (AC), some power ends up getting lost. Converting to direct current (DC) is much more efficient but using DC at very large scales requires significant advances in engineering, says Prof Hogg.<\/p>\n<p>Plus, the tip of a very long turbine blade travels faster than the tip on shorter blades rotating at the same rate \u2013 given it has a longer distance to cover in the same amount of time.<\/p>\n<p>However, current turbine designs have a maximum speed for the blade tip of around 90m\/s, or 324km\/h (201mph), says Prof Hogg, which has a \u201cbig effect on the overall aerodynamics of the blade.\u201d<\/p>\n<p>He adds that blades are also twisted slightly near the tip to ensure good performance, although there is a limit on how much they can be twisted. That means there is a limit on a blade\u2019s size and speed of rotation.<\/p>\n<p>In short, while building a wind turbine significantly bigger than today\u2019s giants may be possible from a manufacturing standpoint, it could be the practicalities and costs of installing, maintaining and operating them that really challenge their seemingly unstoppable growth in the future. As Ms Nasse says, \u201cWe need to be a little careful of the pace.\u201d<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-sudan\">South-Sudan<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Sudan. Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine that will be powerful enough to provide electricity to roughly 13,000 British homes. It will be the biggest such turbine in the world, though potentially not for long. Wind turbines just keep getting [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":3044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,9],"tags":[234,1378,265,969,233,1376,1377],"class_list":["post-3045","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-miscellaneous","tag-africa-press","tag-africa-press-kenya","tag-africa-press-south-sudan","tag-kenya","tag-south-sudan","tag-turbines","tag-wind"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Why giant turbines are pushing the limits of possibility - South Sudan<\/title>\n<meta name=\"description\" content=\"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why giant turbines are pushing the limits of possibility\" \/>\n<meta property=\"og:description\" content=\"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\" \/>\n<meta property=\"og:site_name\" content=\"South Sudan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-23T16:21:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-23T16:24:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"976\" \/>\n\t<meta property=\"og:image:height\" content=\"549\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Why giant turbines are pushing the limits of possibility\",\"datePublished\":\"2021-10-23T16:21:50+00:00\",\"dateModified\":\"2021-10-23T16:24:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\"},\"wordCount\":972,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Kenya\",\"Africa Press-South-Sudan\",\"Kenya\",\"South-Sudan\",\"turbines\",\"wind\"],\"articleSection\":[\"all news\",\"miscellaneous\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\",\"url\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\",\"name\":\"Why giant turbines are pushing the limits of possibility - South Sudan\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg\",\"datePublished\":\"2021-10-23T16:21:50+00:00\",\"dateModified\":\"2021-10-23T16:24:31+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg\",\"width\":976,\"height\":549,\"caption\":\"Why giant turbines are pushing the limits of possibility\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-sudan\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why giant turbines are pushing the limits of possibility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-sudan\/\",\"name\":\"South Sudan\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-sudan\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Why giant turbines are pushing the limits of possibility - South Sudan","description":"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility","og_locale":"en_US","og_type":"article","og_title":"Why giant turbines are pushing the limits of possibility","og_description":"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...","og_url":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility","og_site_name":"South Sudan","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-10-23T16:21:50+00:00","article_modified_time":"2021-10-23T16:24:31+00:00","og_image":[{"width":976,"height":549,"url":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Why giant turbines are pushing the limits of possibility","datePublished":"2021-10-23T16:21:50+00:00","dateModified":"2021-10-23T16:24:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility"},"wordCount":972,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg","keywords":["Africa Press","Africa Press-Kenya","Africa Press-South-Sudan","Kenya","South-Sudan","turbines","wind"],"articleSection":["all news","miscellaneous"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility","url":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility","name":"Why giant turbines are pushing the limits of possibility - South Sudan","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg","datePublished":"2021-10-23T16:21:50+00:00","dateModified":"2021-10-23T16:24:31+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Next year, Danish wind turbine manufacturer Vestas will put up a gargantuan prototype \u2013 a 15-megawatt (MW) wind turbine ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#primaryimage","url":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2021\/10\/img-6174371a66849.jpg","width":976,"height":549,"caption":"Why giant turbines are pushing the limits of possibility"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/why-giant-turbines-are-pushing-the-limits-of-possibility#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-sudan\/"},{"@type":"ListItem","position":2,"name":"Why giant turbines are pushing the limits of possibility"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-sudan\/#website","url":"https:\/\/www.africa-press.net\/south-sudan\/","name":"South Sudan","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-sudan\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts\/3045","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/comments?post=3045"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts\/3045\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/media\/3044"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/media?parent=3045"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/categories?post=3045"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/tags?post=3045"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}