{"id":46222,"date":"2023-10-26T15:01:15","date_gmt":"2023-10-26T15:01:15","guid":{"rendered":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway"},"modified":"2023-10-26T15:31:56","modified_gmt":"2023-10-26T15:31:56","slug":"south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","title":{"rendered":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; South-Sudan. <\/strong><\/span><b> <\/b>A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba-Rumbek Highway.<\/p>\n<p>The road project report, which was presented to the transitional parliament on Wednesday by Steven Kiliona Wondu, the Auditor General at the National Audit Chamber, said the project, which was supposed to be completed by July 11, 2023, has been delayed due to failure by the government to remit the money to contractors.<\/p>\n<p>\u201cThe delay was mainly attributed to delay in making advance payments and non-payment of interim payment certificates,\u201d he told lawmakers.<\/p>\n<p>The Auditor General also said that the contractor for the Juba-Rumbek road construction was not procured through open competitive bidding but through single sourcing.<\/p>\n<p>He also said that the financial agreement between the government and Chinese firm Shandong Hi-Speed Corporation is not clear.<\/p>\n<p>Wondu also said that the Ministry of Petroleum shipped 21,780,134 barrels of crude oil worth $1,558,763,802 to Chinese firms between 2019 and 2020, but it is unclear whether the crude oil policy for development has been stopped or not.<\/p>\n<p>The Auditor General\u2019s report also found that the road has not been constructed in accordance with the required design and specifications.<\/p>\n<p>He said the design of the road was inadequate since the Ministry of Environment and Forestry was not involved in the feasibility study and Environment and Social Impact Assessment.<\/p>\n<p>The 392-kilometer road is being built by Shandong Hi-Speed Corporation as part of a government project to connect Juba City to the Bahr el Ghazal region.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/south-sudan\">South-Sudan<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; South-Sudan. A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba-Rumbek Highway. The road project report, which was presented to the transitional parliament on Wednesday by Steven Kiliona Wondu, the Auditor General at the National Audit Chamber, said the project, which was supposed to [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":46221,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,7,293],"tags":[234,265,233],"class_list":["post-46222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-head-lines","category-to-homepage","tag-africa-press","tag-africa-press-south-sudan","tag-south-sudan"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway - South Sudan<\/title>\n<meta name=\"description\" content=\"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway\" \/>\n<meta property=\"og:description\" content=\"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\" \/>\n<meta property=\"og:site_name\" content=\"South Sudan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-26T15:01:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-26T15:31:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1019\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway\",\"datePublished\":\"2023-10-26T15:01:15+00:00\",\"dateModified\":\"2023-10-26T15:31:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\"},\"wordCount\":272,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-South-Sudan\",\"South-Sudan\"],\"articleSection\":[\"all news\",\"economy\",\"head lines\",\"to-homepage\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\",\"url\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\",\"name\":\"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway - South Sudan\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg\",\"datePublished\":\"2023-10-26T15:01:15+00:00\",\"dateModified\":\"2023-10-26T15:31:56+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg\",\"width\":1019,\"height\":414,\"caption\":\"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/south-sudan\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#website\",\"url\":\"https:\/\/www.africa-press.net\/south-sudan\/\",\"name\":\"South Sudan\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/south-sudan\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway - South Sudan","description":"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","og_locale":"en_US","og_type":"article","og_title":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway","og_description":"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...","og_url":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","og_site_name":"South Sudan","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-10-26T15:01:15+00:00","article_modified_time":"2023-10-26T15:31:56+00:00","og_image":[{"width":1019,"height":414,"url":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway","datePublished":"2023-10-26T15:01:15+00:00","dateModified":"2023-10-26T15:31:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway"},"wordCount":272,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg","keywords":["Africa Press","Africa Press-South-Sudan","South-Sudan"],"articleSection":["all news","economy","head lines","to-homepage"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","url":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway","name":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway - South Sudan","isPartOf":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg","datePublished":"2023-10-26T15:01:15+00:00","dateModified":"2023-10-26T15:31:56+00:00","author":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"A report by South Sudan\u2019s Auditor General has blamed non-payment of money for the slow construction of the Juba- ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#primaryimage","url":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg","contentUrl":"https:\/\/static.africa-press.net\/south-sudan\/sites\/32\/2023\/10\/sm_1698321285.532042.jpg","width":1019,"height":414,"caption":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/south-sudan\/all-news\/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/south-sudan\/"},{"@type":"ListItem","position":2,"name":"South Sudan\u2019s auditor general blames non-payment for slow construction of Juba-Rumbek highway"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/south-sudan\/#website","url":"https:\/\/www.africa-press.net\/south-sudan\/","name":"South Sudan","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/south-sudan\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/south-sudan\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts\/46222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/comments?post=46222"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/posts\/46222\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/media\/46221"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/media?parent=46222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/categories?post=46222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/south-sudan\/wp-json\/wp\/v2\/tags?post=46222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}