{"id":20745,"date":"2020-12-28T21:43:29","date_gmt":"2020-12-28T21:43:29","guid":{"rendered":"https:\/\/www.africa-press.com\/tanzania\/?p=20745"},"modified":"2020-12-28T19:05:42","modified_gmt":"2020-12-28T19:05:42","slug":"ultimatum-issued-for-nyakanazi-power-project","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project","title":{"rendered":"Ultimatum issued for Nyakanazi power project"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.com\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.com\/tanzania\">Tanzania<\/a>. <\/strong><\/span>THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s Contractor in Biharamulo District to finish the work for the locals to get power.<\/p>\n<p>Dr Kalemani issued the directive recently, while touring the area to inspect the project that is expected to generate 72 Megawatts.<\/p>\n<p>\u201cThe contractor must finish the work by end of this coming March. All infrastructures must be in place as was planned and there will be no time extension. The project is behind the schedule. I have inspected the project and they told me that it would be completed by July. I say that it must be over by March&#8230;. no more time extension because Tanzanians need power service and not otherwise,\u201d he pointed out.<\/p>\n<p>He equally, said about 25 villages and over 300 suburbs in Biharamulo are waiting for the power service from the said project.<\/p>\n<p>\u201cI need you to finish this project as I directed. Make sure you don\u2019t go beyond the time I instructed you. Just make additional acquisition of manpower, work day and night to make sure the residents of Biharamulo, Nyakanazi, Chato and Buselesele are connected to power service,\u201d he said.<\/p>\n<p>Project Manager, Engineer Sospeter Oralo, commented that the power cooling Nyakanazi sub-station progress was at 55 per cent and will have six Feeders to Kyaka , Nyakanazi A, Nyakanazi B, Kakonko, Biharamulo and Nyakahura.<\/p>\n<p>He further assured the Minister that his directives will be worked on for the project to serve its intended purpose.<\/p>\n<p>On his part, Biharamulo Constituecy Member of Parliament, Mr Ezra Chiwelesa, said the completion of the project will contribute a lot in economic development of the area, adding that already some investors have shown interest to invest in the area.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Tanzania. THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s Contractor in Biharamulo District to finish the work for the locals to get power. Dr Kalemani issued the directive recently, while touring the area to inspect the project that is expected to generate 72 Megawatts. [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":20744,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,8,12,16],"tags":[6990,6991,711],"class_list":["post-20745","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-homepage-english","category-policy","category-twitter","tag-africa-press-2","tag-africa-press-tanzania","tag-tanzania"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ultimatum issued for Nyakanazi power project - Tanzania<\/title>\n<meta name=\"description\" content=\"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ultimatum issued for Nyakanazi power project\" \/>\n<meta property=\"og:description\" content=\"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\" \/>\n<meta property=\"og:site_name\" content=\"Tanzania\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-28T21:43:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"556\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Ultimatum issued for Nyakanazi power project\",\"datePublished\":\"2020-12-28T21:43:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\"},\"wordCount\":297,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Tanzania\",\"tanzania\"],\"articleSection\":[\"all news\",\"homepage-english\",\"policy\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\",\"url\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\",\"name\":\"Ultimatum issued for Nyakanazi power project - Tanzania\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg\",\"datePublished\":\"2020-12-28T21:43:29+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg\",\"width\":1024,\"height\":556,\"caption\":\"Ultimatum issued for Nyakanazi power project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/tanzania\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ultimatum issued for Nyakanazi power project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#website\",\"url\":\"https:\/\/www.africa-press.net\/tanzania\/\",\"name\":\"Tanzania\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/tanzania\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ultimatum issued for Nyakanazi power project - Tanzania","description":"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project","og_locale":"en_US","og_type":"article","og_title":"Ultimatum issued for Nyakanazi power project","og_description":"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...","og_url":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project","og_site_name":"Tanzania","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2020-12-28T21:43:29+00:00","og_image":[{"width":1024,"height":556,"url":"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Ultimatum issued for Nyakanazi power project","datePublished":"2020-12-28T21:43:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project"},"wordCount":297,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg","keywords":["Africa Press","Africa Press-Tanzania","tanzania"],"articleSection":["all news","homepage-english","policy","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project","url":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project","name":"Ultimatum issued for Nyakanazi power project - Tanzania","isPartOf":{"@id":"https:\/\/www.africa-press.net\/tanzania\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg","datePublished":"2020-12-28T21:43:29+00:00","author":{"@id":"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"THE Minister for Energy, Dr Medard Kalemani has issued a three-month ultimatum to Nyakanazi power cooling sub-station\u2019s ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#primaryimage","url":"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg","contentUrl":"https:\/\/static.africa-press.net\/tanzania\/sites\/17\/2020\/12\/img-5fea2c6c8ed9c.jpg","width":1024,"height":556,"caption":"Ultimatum issued for Nyakanazi power project"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/tanzania\/all-news\/ultimatum-issued-for-nyakanazi-power-project#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/tanzania\/"},{"@type":"ListItem","position":2,"name":"Ultimatum issued for Nyakanazi power project"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/tanzania\/#website","url":"https:\/\/www.africa-press.net\/tanzania\/","name":"Tanzania","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/tanzania\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/tanzania\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/posts\/20745","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/comments?post=20745"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/posts\/20745\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/media\/20744"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/media?parent=20745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/categories?post=20745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/tanzania\/wp-json\/wp\/v2\/tags?post=20745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}