{"id":29592,"date":"2022-04-15T16:29:26","date_gmt":"2022-04-15T16:29:26","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look"},"modified":"2022-04-15T16:39:49","modified_gmt":"2022-04-15T16:39:49","slug":"kampala-jinja-flyover-works-give-clock-tower-new-look","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look","title":{"rendered":"Kampala-Jinja flyover works give Clock Tower new look"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion.<\/p>\n<p>The phase comprises a new modern Clocker Tower flyover, a four-lane Nsambya underpass, three pedestrian bridges, junction improvements, and general road widening to ease traffic flow.<\/p>\n<p>Junction development is ongoing at Mukwano Road-Kibuli area, Nsambya-Ggaba road area and at the Clock Tower-Shoprite stretch.<\/p>\n<p>Construction of a pedestrian bridge takes shakes.<\/p>\n<p>According to the plan, there will be a four-lane underpass at Nsambya to deliver vehicular traffic from the flyover at Queen\u2019s Way to Mukwano Road.<\/p>\n<p><b>READ:<\/b><\/p>\n<p>Where is the monumental Queen&#8217;s Clock?<\/p>\n<p>Uganda National Roads Authority\u2019s (Unra) media relations manager Allan Ssempebwa Kyobe told Daily Monitor yesterday that they expect to have substantial completion of the first flyover project by December.<\/p>\n<p>Mr Kyobe noted that the second Lot is still under procurement with land acquisition ongoing, especially in areas where the roads agency has not fully acquired land.<\/p>\n<p>An underpass that is under construction near Nsambya traffic lights.<\/p>\n<p>\u201cThe Nsambya underpass will be the first of its kind in Uganda and upon completion, it will ease traffic,\u201d Mr Kyobe said.<\/p>\n<p>The Kampala Flyover project is being bankrolled by the Government of Japan through the Japan International Cooperation Agency (Jica) at Shs224b. Phase two is expected to cost Shs659b.<\/p>\n<p>The ongoing works have since paralysed traffic on roads such as Mukwano, Ggaba, Kibuli and the sixth, seventh and Eighth Street in the industrial area.<\/p>\n<p>The Clock Tower structure that was relocated to pave way for the construction of the flyover. It was built in commemoration of Queen Elizabeth II\u2019s visit to Uganda in 1954.<\/p>\n<p>\u201cMukwano road is a mess, especially during rush hours and this affects our work. We expect Unra to expedite work and complete on time so that we can have a feel of the flyover,\u201d said Ms Agnes Atwebembire, a motorist.<\/p>\n<p>Mr Kyobe noted that they are in touch with the traffic police as far as monitoring traffic flow in the affected areas is concerned. He advised motorists to bear with them during this construction phase and adhere to traffic guidelines.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The phase comprises a new modern Clocker Tower flyover, a four-lane Nsambya underpass, three pedestrian bridges, junction improvements, and general road widening to ease traffic flow. Junction development is ongoing at Mukwano Road-Kibuli area, Nsambya-Ggaba [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":29591,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,7,8,12],"tags":[233,240,234],"class_list":["post-29592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-head-lines","category-homepage-english","category-policy","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kampala-Jinja flyover works give Clock Tower new look - Uganda<\/title>\n<meta name=\"description\" content=\"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kampala-Jinja flyover works give Clock Tower new look\" \/>\n<meta property=\"og:description\" content=\"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-15T16:29:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-04-15T16:39:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Kampala-Jinja flyover works give Clock Tower new look\",\"datePublished\":\"2022-04-15T16:29:26+00:00\",\"dateModified\":\"2022-04-15T16:39:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\"},\"wordCount\":375,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"head lines\",\"homepage-english\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\",\"name\":\"Kampala-Jinja flyover works give Clock Tower new look - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg\",\"datePublished\":\"2022-04-15T16:29:26+00:00\",\"dateModified\":\"2022-04-15T16:39:49+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Kampala-Jinja flyover works give Clock Tower new look\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kampala-Jinja flyover works give Clock Tower new look\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kampala-Jinja flyover works give Clock Tower new look - Uganda","description":"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look","og_locale":"en_US","og_type":"article","og_title":"Kampala-Jinja flyover works give Clock Tower new look","og_description":"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-04-15T16:29:26+00:00","article_modified_time":"2022-04-15T16:39:49+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Kampala-Jinja flyover works give Clock Tower new look","datePublished":"2022-04-15T16:29:26+00:00","dateModified":"2022-04-15T16:39:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look"},"wordCount":375,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","head lines","homepage-english","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look","name":"Kampala-Jinja flyover works give Clock Tower new look - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg","datePublished":"2022-04-15T16:29:26+00:00","dateModified":"2022-04-15T16:39:49+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The first phase of the Kampala Flyover project is taking shape with major infrastructural works nearing completion. The ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/04\/postQueueImg_7.jpg","width":1200,"height":800,"caption":"Kampala-Jinja flyover works give Clock Tower new look"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/kampala-jinja-flyover-works-give-clock-tower-new-look#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Kampala-Jinja flyover works give Clock Tower new look"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/29592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=29592"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/29592\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/29591"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=29592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=29592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=29592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}