{"id":32583,"date":"2022-06-16T12:32:44","date_gmt":"2022-06-16T12:32:44","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira"},"modified":"2022-06-16T12:41:30","modified_gmt":"2022-06-16T12:41:30","slug":"shs3-8-billion-invested-to-improve-power-supply-in-kira","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira","title":{"rendered":"Shs3.8 billion invested to improve power supply in Kira"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality.<\/p>\n<p>The project seeks to put in place two new power lines from Namugongo substation to Kira to wean areas such as Najeera off the overloaded Namugongo-Kyaliwajjala power line.<\/p>\n<p>It also seeks to shorten the distance between the substation and Kira Municipality, thus reducing loss of electricity in the form of heat.<\/p>\n<p>Mr Job Watti, the Umeme projects investment manager, said in a statement yesterday that demand for power in Kira Municipality has outstripped supply thus the new project.<\/p>\n<p>\u201cDemand for power from our 62,247 customers has outgrown the capacity of the three lines feeding Kira and the surrounding areas,\u201d he said, noting that to solve the demand and reliability problems, there was need to introduce additional lines.<\/p>\n<p>The project is expected, according to Mr Watti, to be completed by the first quarter of 2023.<\/p>\n<p>Kira Municipality, which for years was largely a residential area for many of Kampala\u2019s working classes, is now transforming into a business centre.<\/p>\n<p>Many structures have been demolished to pave way for commercial buildings such as apartments and shopping malls.<\/p>\n<p>Furthermore, the expansion of the Matugga-Kasangati-Kira-Kyaliwajjala road, will present more economic opportunities and as a result, the demand for electricity in the area is expected to increase, which calls for reliable supply.<\/p>\n<p>The Namugongo\u2013Najeera reliability improvement project is one of the many Umeme is undertaking.<\/p>\n<p>Others include constructing dedicating lines to, among other installations, national hospitals to enable the health facilities store blood and drugs without worrying of outages.<\/p>\n<p>Mr Selestino Babungi, the Umeme managing director, said in a statement that works would now offer customers assured and more reliable supply.<\/p>\n<p>\u201cNot only will the supply be reliable, the quality of supply is also greatly enhanced,\u201d he said, urging customers to bear with interruptions such as traffic interruptions during the refurbishment works.<\/p>\n<p><b>Increasing demand<\/b><\/p>\n<p>With Uganda\u2019s power generation capacity now exceeding demand, attention has been redirected to providing stable power and increasing consumption. Power distributors are increasingly investing in underground cables and connecting more applicants to the electricity grids respectively.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seeks to put in place two new power lines from Namugongo substation to Kira to wean areas such as Najeera off the overloaded Namugongo-Kyaliwajjala power line. It also seeks to shorten the distance between [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":32582,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[233,240,234],"class_list":["post-32583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Shs3.8 billion invested to improve power supply in Kira - Uganda<\/title>\n<meta name=\"description\" content=\"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shs3.8 billion invested to improve power supply in Kira\" \/>\n<meta property=\"og:description\" content=\"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-16T12:32:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-16T12:41:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Shs3.8 billion invested to improve power supply in Kira\",\"datePublished\":\"2022-06-16T12:32:44+00:00\",\"dateModified\":\"2022-06-16T12:41:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\"},\"wordCount\":373,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\",\"name\":\"Shs3.8 billion invested to improve power supply in Kira - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg\",\"datePublished\":\"2022-06-16T12:32:44+00:00\",\"dateModified\":\"2022-06-16T12:41:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg\",\"width\":960,\"height\":480,\"caption\":\"Shs3.8 billion invested to improve power supply in Kira\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shs3.8 billion invested to improve power supply in Kira\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Shs3.8 billion invested to improve power supply in Kira - Uganda","description":"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira","og_locale":"en_US","og_type":"article","og_title":"Shs3.8 billion invested to improve power supply in Kira","og_description":"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-06-16T12:32:44+00:00","article_modified_time":"2022-06-16T12:41:30+00:00","og_image":[{"width":960,"height":480,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Shs3.8 billion invested to improve power supply in Kira","datePublished":"2022-06-16T12:32:44+00:00","dateModified":"2022-06-16T12:41:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira"},"wordCount":373,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira","name":"Shs3.8 billion invested to improve power supply in Kira - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg","datePublished":"2022-06-16T12:32:44+00:00","dateModified":"2022-06-16T12:41:30+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Power distributor Umeme has said it is injecting Shs3.8b to improve power supply in Kira Municipality. The project seek ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/06\/postQueueImg_1-62ab24b7c0c1e.jpg","width":960,"height":480,"caption":"Shs3.8 billion invested to improve power supply in Kira"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/shs3-8-billion-invested-to-improve-power-supply-in-kira#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Shs3.8 billion invested to improve power supply in Kira"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/32583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=32583"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/32583\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/32582"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=32583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=32583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=32583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}