{"id":40697,"date":"2022-11-23T19:46:36","date_gmt":"2022-11-23T19:46:36","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work"},"modified":"2022-11-23T20:29:58","modified_gmt":"2022-11-23T20:29:58","slug":"officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","title":{"rendered":"Officials block commissioning of Shs2b Masindi roads over shoddy work"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanyata road in Kiruli Sub County over shoddy work.<\/p>\n<p>This particular had been allocated Shs400,493,217 million for improvement, but according to the authorities, what the contractor has presented to them is of lower quality than expected.<\/p>\n<p>The funds are part of the Shs2 billion, the Ministry of Finance sent to the district for the road network improvement in the first quarter of this financial year.<\/p>\n<p>The other roads to be improved included: Biraizi-Labongo road (7.6km) costing Shs298,000,000, and the Bwinamira-Kimanya road (9.3km) costing Shs670,140,200.<\/p>\n<p>However, Ms Tinka Noreen, the chairperson of the works and production committee at Masindi District, says it was during her committee\u2019s monitoring session that they noted that the marram at Kyatiri-Kitanyata road was not sufficient, causing waterlogging.<\/p>\n<p>\u201cEven at Kibibira-Kyababyaara, the old culverts were reinstalled and yet they are broken. In addition, they are too small to enable smooth water flow, which results in flooding. These roads should not be commissioned until the defects are addressed,\u201d she noted. She said the Biraizi-Labongo road lacks head walls on Biraizi swamp which is causing siltation.<\/p>\n<p>Mr Joseph Sunday, the Masindi District Engineer, said: \u201cThe road required 196 culverts but was only given 146 culverts which he was supposed to install. So we would only remove broken culverts and replace them with the new ones.\u201d<\/p>\n<p>Mr Sunday accused the works committee of monitoring the road without a technical person to explain to them what they thought were irregularities.<\/p>\n<p>The roads were due for commissioning in early December 2022.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanyata road in Kiruli Sub County over shoddy work. This particular had been allocated Shs400,493,217 million for improvement, but according to the authorities, what the contractor has presented to them is of lower quality than [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":40696,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3],"tags":[233,240,234],"class_list":["post-40697","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Officials block commissioning of Shs2b Masindi roads over shoddy work - Uganda<\/title>\n<meta name=\"description\" content=\"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Officials block commissioning of Shs2b Masindi roads over shoddy work\" \/>\n<meta property=\"og:description\" content=\"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-23T19:46:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-11-23T20:29:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Officials block commissioning of Shs2b Masindi roads over shoddy work\",\"datePublished\":\"2022-11-23T19:46:36+00:00\",\"dateModified\":\"2022-11-23T20:29:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\"},\"wordCount\":287,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\",\"name\":\"Officials block commissioning of Shs2b Masindi roads over shoddy work - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg\",\"datePublished\":\"2022-11-23T19:46:36+00:00\",\"dateModified\":\"2022-11-23T20:29:58+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg\",\"width\":720,\"height\":480,\"caption\":\"Officials block commissioning of Shs2b Masindi roads over shoddy work\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Officials block commissioning of Shs2b Masindi roads over shoddy work\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Officials block commissioning of Shs2b Masindi roads over shoddy work - Uganda","description":"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","og_locale":"en_US","og_type":"article","og_title":"Officials block commissioning of Shs2b Masindi roads over shoddy work","og_description":"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-11-23T19:46:36+00:00","article_modified_time":"2022-11-23T20:29:58+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Officials block commissioning of Shs2b Masindi roads over shoddy work","datePublished":"2022-11-23T19:46:36+00:00","dateModified":"2022-11-23T20:29:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work"},"wordCount":287,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work","name":"Officials block commissioning of Shs2b Masindi roads over shoddy work - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg","datePublished":"2022-11-23T19:46:36+00:00","dateModified":"2022-11-23T20:29:58+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Officials in Masindi District have appealed to the local council to block the commissioning of the 9.5km Kyatiri-Kitanya ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2022\/11\/postQueueImg_1669220203.23.jpg","width":720,"height":480,"caption":"Officials block commissioning of Shs2b Masindi roads over shoddy work"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/officials-block-commissioning-of-shs2b-masindi-roads-over-shoddy-work#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Officials block commissioning of Shs2b Masindi roads over shoddy work"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/40697","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=40697"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/40697\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/40696"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=40697"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=40697"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=40697"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}