{"id":46302,"date":"2023-03-15T12:10:04","date_gmt":"2023-03-15T12:10:04","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months"},"modified":"2023-03-15T12:41:27","modified_gmt":"2023-03-15T12:41:27","slug":"urc-closes-kampala-mukono-railway-line-for-6-months","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months","title":{"rendered":"URC closes Kampala-Mukono railway line for 6 months"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers and cargo for six months to enable reconstruction works.<\/p>\n<p>\u201cConstruction of a concrete sleeper Meter Gauge Railway line from Kampala-Mukono is set to commence next month (April 2023). This section will be closed to all railway and human traffic,\u201d URC tweeted on Monday.<\/p>\n<p>While appearing before the Committee on Government Assurance on August 31, 2022, the minister of Transport, Gen Edward Katumba Wamala, revealed that URC had resorted to using concrete railway sleepers to replace the metallic ones due to vandalism.<\/p>\n<p><b>The works<\/b><\/p>\n<p>The reconstruction of the Kampala-Namanve section is expected to end in September and then works on Namanve-Mukono section will follow and run for seven months from October to April 2024.<\/p>\n<p>However, sections of Mukono-Malaba, Port Bell-Kampala, Mwanza-Kisumu and Jinja-Kisumu-Port Bell will continue to serve travellers.<\/p>\n<p>The development will, however, affect an estimated 1,400 passengers who use the railway services daily.<\/p>\n<p>According to the notice, the reconstruction aims at improving the railway services in the country.<\/p>\n<p>Mr John Linnon Ssengendo, the URC spokesperson, said the Kampala-Namanve route has an average capacity of about 1,400 passengers per day.<\/p>\n<p>The railway\u2019s boarding stations are located in Kampala, Kireka, Namanve, Bweyogerere and Namboole, with trips covering a 16.7-kilometre radius.<\/p>\n<p>\u201cWhile each trip may cost about Shs1,000, a passenger who lives, say in Kireka, Nakawa or Bweyogerere, is dropped off, they don\u2019t spend any other coin, but walk home; so the smaller section that goes up to Mukono may have to pay an extra Shs3,000,\u201d he said in a telephone interview yesterday.<\/p>\n<p>But he said not much will be lost because the other sections will be working.<\/p>\n<p>Mr Ssengendo said: \u201cMost transporters\u2019 cargo terminates at their inland car depot in Mukono, and then it is loaded onto trucks. It is only the client of Roofings, who is bringing in steel coils, that will be affected.\u201d<\/p>\n<p>He added: \u201cBut even then, we have MV Pamba and Kawa; so, that cargo can also move on water and when it does, it is moved from Port Bell and it is able to be delivered.\u201d<\/p>\n<p>Mr Ssengendo said the disrupted train servcies will only affect passengers who ply the Kampala-Mukono section.<\/p>\n<p>He has urged residents to give away 10 metres on either side of the railway line to allow construction works go on.<\/p>\n<p><b>Additional reporting by Philip Wafula<\/b><\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers and cargo for six months to enable reconstruction works. \u201cConstruction of a concrete sleeper Meter Gauge Railway line from Kampala-Mukono is set to commence next month (April 2023). This section will be closed [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":46301,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,240,234],"class_list":["post-46302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>URC closes Kampala-Mukono railway line for 6 months - Uganda<\/title>\n<meta name=\"description\" content=\"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"URC closes Kampala-Mukono railway line for 6 months\" \/>\n<meta property=\"og:description\" content=\"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-15T12:10:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-15T12:41:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"URC closes Kampala-Mukono railway line for 6 months\",\"datePublished\":\"2023-03-15T12:10:04+00:00\",\"dateModified\":\"2023-03-15T12:41:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\"},\"wordCount\":415,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\",\"name\":\"URC closes Kampala-Mukono railway line for 6 months - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg\",\"datePublished\":\"2023-03-15T12:10:04+00:00\",\"dateModified\":\"2023-03-15T12:41:27+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg\",\"width\":720,\"height\":480,\"caption\":\"URC closes Kampala-Mukono railway line for 6 months\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"URC closes Kampala-Mukono railway line for 6 months\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"URC closes Kampala-Mukono railway line for 6 months - Uganda","description":"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months","og_locale":"en_US","og_type":"article","og_title":"URC closes Kampala-Mukono railway line for 6 months","og_description":"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-03-15T12:10:04+00:00","article_modified_time":"2023-03-15T12:41:27+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"URC closes Kampala-Mukono railway line for 6 months","datePublished":"2023-03-15T12:10:04+00:00","dateModified":"2023-03-15T12:41:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months"},"wordCount":415,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months","name":"URC closes Kampala-Mukono railway line for 6 months - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg","datePublished":"2023-03-15T12:10:04+00:00","dateModified":"2023-03-15T12:41:27+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The Uganda Railways Corporation (URC) has said a section of the Kampala-Mukono railway line will be closed to passengers ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/03\/postQueueImg_1678869610.07.jpg","width":720,"height":480,"caption":"URC closes Kampala-Mukono railway line for 6 months"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/urc-closes-kampala-mukono-railway-line-for-6-months#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"URC closes Kampala-Mukono railway line for 6 months"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/46302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=46302"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/46302\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/46301"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=46302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=46302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=46302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}