{"id":50400,"date":"2023-06-05T21:28:49","date_gmt":"2023-06-05T21:28:49","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off"},"modified":"2023-06-05T22:49:39","modified_gmt":"2023-06-05T22:49:39","slug":"construction-of-steel-bridge-at-katonga-kicks-off","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off","title":{"rendered":"Construction of steel bridge at Katonga kicks off"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala-Masaka highway which can be used by all vehicles.<\/p>\n<p>Last week, a section of the bridge was reopened but is used by only light vehicles.<\/p>\n<p>Heavy cargo lorries, trailers and buses are still using the diversion route through the districts of Butambala,Gomba Sembabule, Bukomansimbi, Kalungu to connect to Masaka.<\/p>\n<p>Mr Allan Ssempebwa said on Sunday that the planned steel bridge is phase II of the bridge restoration efforts and works will last two months.<\/p>\n<p>\u201cLike we have been telling the public, the steel bridge is also temporary and construction is going to take between one to two months ,good enough it will be used by all vehicles ,then after that , focus will be building a raised permanent pre-stressed concrete bridge whose construction will take one and half years ,\u201dhe said.<\/p>\n<p>As a result of ongoing construction works, Ssempebwa warned that motorists will occasionally be interrupted, sometimes delayed for some minutes at the bridge.<\/p>\n<p>\u201cThere will be occasional traffic disruption as the contractor [CCCC] prepares for and carries out this phase of work but we urge them[motorists] to bear with us because whatever we are doing is in their best interest,\u201d he added.<\/p>\n<p>Mr Emmanuel Kakuru, an engineer with CCCC said their work is likely to be delayed as they wait for Uganda Electricity Transmission Company to relocate six high voltage electricity towers which are located in the area where they plan to erect the steel bridge.<\/p>\n<p>\u201cIf those responsible for the electricity towers swiftly relocate them, fixing the steel bridge will take us only one month,\u201d he said.<\/p>\n<p>Mr Ahmed Katongole, a truck driver urged the contractor to expedite the work at Katonga, saying the diversion route was not designed for heavy trucks.<\/p>\n<p>\u201cThe section between Villa \u2013Maria and Masaka City is the most challenging, it is narrow and ridden with potholes, several trailers have plunged into swamps in past couple of weeks as drivers try to dodge potholes,\u201d he said.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala-Masaka highway which can be used by all vehicles. Last week, a section of the bridge was reopened but is used by only light vehicles. Heavy cargo lorries, trailers and buses are still using [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":50399,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[233,240,234],"class_list":["post-50400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction of steel bridge at Katonga kicks off - Uganda<\/title>\n<meta name=\"description\" content=\"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of steel bridge at Katonga kicks off\" \/>\n<meta property=\"og:description\" content=\"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-05T21:28:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-05T22:49:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Construction of steel bridge at Katonga kicks off\",\"datePublished\":\"2023-06-05T21:28:49+00:00\",\"dateModified\":\"2023-06-05T22:49:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\"},\"wordCount\":361,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\",\"name\":\"Construction of steel bridge at Katonga kicks off - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg\",\"datePublished\":\"2023-06-05T21:28:49+00:00\",\"dateModified\":\"2023-06-05T22:49:39+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg\",\"width\":720,\"height\":480,\"caption\":\"Construction of steel bridge at Katonga kicks off\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of steel bridge at Katonga kicks off\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction of steel bridge at Katonga kicks off - Uganda","description":"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off","og_locale":"en_US","og_type":"article","og_title":"Construction of steel bridge at Katonga kicks off","og_description":"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-06-05T21:28:49+00:00","article_modified_time":"2023-06-05T22:49:39+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Construction of steel bridge at Katonga kicks off","datePublished":"2023-06-05T21:28:49+00:00","dateModified":"2023-06-05T22:49:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off"},"wordCount":361,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off","name":"Construction of steel bridge at Katonga kicks off - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg","datePublished":"2023-06-05T21:28:49+00:00","dateModified":"2023-06-05T22:49:39+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"The Uganda National Roads Authority (Unra) has started erecting a temporary steel bridge at River Katonga on the Kampala ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/06\/sm_1685989000.038596.jpg","width":720,"height":480,"caption":"Construction of steel bridge at Katonga kicks off"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/construction-of-steel-bridge-at-katonga-kicks-off#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Construction of steel bridge at Katonga kicks off"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/50400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=50400"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/50400\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/50399"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=50400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=50400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=50400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}