{"id":53270,"date":"2023-07-27T08:56:59","date_gmt":"2023-07-27T08:56:59","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street"},"modified":"2023-07-27T10:25:25","modified_gmt":"2023-07-27T10:25:25","slug":"masaka-traders-count-losses-over-slow-construction-on-elgin-street","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street","title":{"rendered":"Masaka traders count losses over slow construction on Elgin Street"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span>Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construction in the area.<\/p>\n<p>While the traders appreciated the project&#8217;s significance, some shop owners along the road have raised concerns about the contractor&#8217;s failure to regularly dampen the road surface to minimize dust.<\/p>\n<p>According to the traders, the dust has significantly affected their businesses, leading them to constantly explain to customers why their merchandise appear old due to dust accumulation.<\/p>\n<p>Mr Charles Kabanda, a textile trader, told Monitor on July 25 that construction work came to a standstill two months ago, and the contractor seems unconcerned about the situation. He also mentioned that heaps of soil and trenches dug by the contractor obstruct access to their shops.<\/p>\n<p>&#8220;The dust is causing serious problems for us. I had to stop displaying clothes outside the shop to attract customers because they get dirty quickly. Even the clothes inside the shop are affected, and I sometimes have to wash them before selling,&#8221; Mr Kabanda said.<\/p>\n<p>Other traders, like Mr Robert Zziwa, a butcher, complained that the dust is contaminating the beef he sells, leading some customers to avoid his stall.<\/p>\n<p>The traders are now urging city authorities to intervene and engage with the contractor to expedite the construction work to minimize disruptions to their businesses.<\/p>\n<p>Eng Bbaale Mugera, the chairperson of Masaka City Traders Association (MACITA), confirmed that they plan to officially petition the city authorities regarding the matter.<\/p>\n<p>He said that some traders have been forced to close their shops during certain hours due to the intolerable dust levels.<\/p>\n<p>Mr Vincent Kasumba Zziwa, Chairperson of Masaka City Development Forum, attributed it to the slow relocation of National Water and Sewerage Corporation pipes and power lines.<\/p>\n<p>\u201cThe sub-contractor failed to deliver on time and has since been replaced with another who is yet to finish the work, I am sure very soon, the main contractor will resume work,\u201d he said.<\/p>\n<p>Mr Samuel Tukwasibwe, the environment and social safeguard specialist for China Railway No. 3 Engineering, the contractor involved, said that they have not abandoned the project.<\/p>\n<p>He explained that their team is always on-site, but certain installations, like water pipes and electric poles, needed to be shifted, causing temporary delays.<\/p>\n<p>In January 2023, Masaka City Council signed a contract with China Railway No. 3 Engineering Group to construct Elgin Street, Circular Road, and Nyendo Market Road, totaling 1.995 kilometers at a cost of Shs9.94 billion.<\/p>\n<p>The contract expires at the end of September, 2023. Masaka has significantly benefited from the World Bank-funded Uganda Support to Municipal Infrastructure Development (USMID) program, which has improved infrastructure in various towns and cities, including road paving, drainage channel fixes, and the provision of solar lights.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construction in the area. While the traders appreciated the project&#8217;s significance, some shop owners along the road have raised concerns about the contractor&#8217;s failure to regularly dampen the road surface to minimize dust. According [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":53269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,12],"tags":[233,240,234],"class_list":["post-53270","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-policy","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Masaka traders count losses over slow construction on Elgin Street - Uganda<\/title>\n<meta name=\"description\" content=\"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Masaka traders count losses over slow construction on Elgin Street\" \/>\n<meta property=\"og:description\" content=\"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-27T08:56:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-27T10:25:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"582\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Masaka traders count losses over slow construction on Elgin Street\",\"datePublished\":\"2023-07-27T08:56:59+00:00\",\"dateModified\":\"2023-07-27T10:25:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\"},\"wordCount\":474,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"policy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\",\"name\":\"Masaka traders count losses over slow construction on Elgin Street - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg\",\"datePublished\":\"2023-07-27T08:56:59+00:00\",\"dateModified\":\"2023-07-27T10:25:25+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg\",\"width\":1000,\"height\":582,\"caption\":\"Masaka traders count losses over slow construction on Elgin Street\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Masaka traders count losses over slow construction on Elgin Street\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Masaka traders count losses over slow construction on Elgin Street - Uganda","description":"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street","og_locale":"en_US","og_type":"article","og_title":"Masaka traders count losses over slow construction on Elgin Street","og_description":"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2023-07-27T08:56:59+00:00","article_modified_time":"2023-07-27T10:25:25+00:00","og_image":[{"width":1000,"height":582,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Masaka traders count losses over slow construction on Elgin Street","datePublished":"2023-07-27T08:56:59+00:00","dateModified":"2023-07-27T10:25:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street"},"wordCount":474,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","policy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street","name":"Masaka traders count losses over slow construction on Elgin Street - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg","datePublished":"2023-07-27T08:56:59+00:00","dateModified":"2023-07-27T10:25:25+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Traders operating businesses on Elgin Street in Masaka City are counting losses over the sluggish pace of road construct ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2023\/07\/sm_1690437039.452663.jpg","width":1000,"height":582,"caption":"Masaka traders count losses over slow construction on Elgin Street"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/masaka-traders-count-losses-over-slow-construction-on-elgin-street#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Masaka traders count losses over slow construction on Elgin Street"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/53270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=53270"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/53270\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/53269"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=53270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=53270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=53270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}